A chemical manufacturer in Java commissioned a membrane-based system that treats high-strength industrial wastewater, removes ammonia, and recovers ammonium sulfate fertilizer.
Inspect original excerpt
Shanghai QILEE Environmental Equipment Co., Ltd. announced the successful commissioning and operational validation of its skid-mounted PTFE membrane ammonia removal system for a major chemical manufacturer based in Java, Indonesia. The newly installed installation processes 120 cubic meters per day (120 m³/d) of high-strength industrial wastewater, reducing influent ammonia nitrogen concentrations from peaks of 2,500 mg/L down to compliant discharge levels of 15 mg/L or less, while generating high-purity ammonium sulfate solution for the regional agricultural sector.
First public verification: 2026-11-17 14:46