Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Request a Free Quote

Here's What We Ask Before Quoting

Recent inquiries and the questions that let us answer with a real proposal instead of a generic price list.

Six parameters that make a quote possible

  1. FlowDaily average and peak (m³/day, m³/h)
  2. Influent qualityCOD, BOD₅, TSS, pH; anything unusual (oil, ammonia, chlorine, TDS)
  3. Discharge targetThe standard to meet, or the reuse purpose
  4. Operating hoursContinuous or batch; seasonal changes
  5. Site & civil scopeFootprint, power supply, who builds the tanks
  6. Project stageBudgeting, tender, or ready to order

~20,000 m³/d MBR municipal wastewater treatment system

Ref. A-012 · Location withheld · ~20,000 m³/d · Municipal & Community
Scoping — awaiting site data · Updated Oct 2026

What we ask first Please confirm the project country, actual use and procurement identity; the meaning and units of AADF and P2HF; peak duration and treatment interfaces; pH, COD, water temperature and complete water quality; discharge requirements; power supply; delivery, installation and commissioning scope.

8.5 m³/h automatic chemical dosing for industrial cooling water — Brazil

Ref. A-014 · Brazil · 8.5 m³/h · Industrial Process Water
Engineering assessment in progress · Updated Sep 2026

What we ask first Please confirm the required circulation basis, sulfuric acid concentration and SDS, corrosion-inhibitor composition and SDS, normal pH setpoint, nitrite concentration basis, piping backpressure, ambient conditions, hazardous-area classification, applicable certifications, and DCS interface permissions.

300 m³/d AAO domestic wastewater treatment for a transport facility

Ref. A-024 · Location withheld · 300 m³/d · Municipal & Community
Scoping — awaiting site data · Updated Sep 2026

What we ask first Please confirm the peak flow and diurnal profile, electrical supply conditions, receiving-system discharge requirements, sludge handling route, and whether installation and commissioning guidance are required before final equipment selection.

Tell Us About Your Project

Fill in your project details below and our engineering team will prepare a customized solution and cost estimate within 24 hours.

Flow, influent, discharge target and site constraints help us prepare a useful response.

We respond within 24 hours. Your information is kept confidential.

What Happens Next?

1
Submit Your Requirements

Fill in the form with your project details and wastewater treatment needs.

2
Engineering Review

Our engineers analyze your requirements and design the optimal solution.

3
Receive Your Quote

Get a detailed proposal with system specifications and pricing within 24 hours.

Direct Contact

[email protected]

+86-181-0655-2851

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us