Integrated water purification equipment and reverse osmosis systems for drinking water, industrial water, and ultrapure water production.
Water Purification — Equipment
JY series all-in-one water purification system integrates coagulation, flocculation, sedimentation, filtration, and automatic backwash in a single compact unit. Fully automatic operation treats surface water with turbidity up to 3,000 mg/L to below 3 mg/L. Ideal for rural water supply, small towns, industrial process water, and mine water treatment with capacities from 10 to 200 m³/h.
HydropureWater multi-media filters remove suspended solids, turbidity, and colloidal matter from raw water, achieving SDI values suitable for downstream RO membrane protection. Robust, low-maintenance vessels with long-life filter media and automated backwash.
Clarification, Media Filtration & Softening Selection
Industrial water purification trains combine inclined-plate (lamella) clarification, multi-media sand/anthracite filtration, activated carbon adsorption, and ion-exchange softening to condition surface, well, or municipal feed water. Design filtration velocities typically run 8–12 m/h for pressure sand filters and 10–15 m/h for lamella clarifiers, reducing turbidity from >100 NTU down to <1–3 NTU ahead of boilers, cooling towers, or membrane skids.
Applications & Sizing Checklist
Used for process make-up water, cooling tower side-stream filtration, and municipal drinking water plants. Always verify raw water seasonal turbidity peaks, hardness (mg/L as CaCO₃), iron/manganese concentration, and chlorine residual before finalizing vessel diameter and backwash pump sizing.