Dissolved Air Flotation (DAF) machines for removing suspended solids, oils, grease, and colloidal matter from industrial wastewater.
DAF & Flotation Systems — Equipment
Dissolved air flotation (DAF) system for high-efficiency removal of suspended solids, FOG, oil & grease, and colloidal matter from industrial wastewater. Micro-bubble technology with automatic skimming handles 4–300 m³/h across 13 standard models. Proven in food processing, pulp & paper, textile, metalworking, petrochemical, and municipal pre-treatment applications.
DAF Hydraulic Loading, Recycle Ratio & Performance
Dissolved Air Flotation (DAF) systems inject pressurized air-saturated recycle water (typically 20–35% of forward flow at 0.35–0.50 MPa) through micro-bubble release nozzles (20–50 µm) to float emulsified oils, greases (FOG), and low-density suspended solids. Standard surface hydraulic loading is 5–10 m³/m²·h with 15–25 min retention, achieving 85–95% FOG and TSS removal when paired with inline PAC/PAM flocculation.
Key Industrial Applications
Essential primary pretreatment ahead of biological or membrane stages in slaughterhouses, dairy and edible-oil plants, petrochemical refineries, pulp & paper mills, and metalworking/transport wash bays. Select 304/316L stainless steel wetted parts for corrosive or high-chloride streams.