Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation
HYDROPUREWATER

Industrial wastewater library

Explore six industries, country research, production processes and original sources. Published guides, reported developments and measured study samples have separate meanings.

Country research dossiers

Industrial water evidence database

Public guides, reported developments and reviewed evidence. Counts describe this library’s coverage.

Explore relationships
Partial: confirmed material onlyPartial coveragePublic snapshot · UTC+8

Related guides
2,869
Reported events
9
Reviewed facts
38
Published dossiers
2
Independent sources
11

Guides are article candidates, events are source-supported reports, and facts are reviewed records. Countries and industries overlap; grouped counts cannot be added into a global total.

Country × industry coverage

Select a cell to inspect its records. Coverage measures published material, never market size, factories or local project volume.

Related guides · more published material
Select a cell to inspect its records. Coverage measures published material, never market size, factories or local project volume.
CountryTextileFood & BeverageChemical ManufacturingPharmaceutical ManufacturingOil & GasMunicipal Wastewater
Algeria13—116
Angola33—115
Argentina1511—5
Australia24—1121
Azerbaijan———1——
Bahrain1111—6
Bangladesh91—2—2
Bolivia1—————
Brazil1511119
Burkina Faso—1————
Cambodia22—1—5
Cameroon23—1—4
Canada252——27
Chile13—1—6
China5111—1
Colombia13—1—7
Costa Rica—1———2
Cyprus—————1
Czech Republic—1———2
Denmark—2—1—1
Dominican Republic121——1
Ecuador1321—5
Egypt42—1—8
El Salvador—————1
Ethiopia23—1—1
Fiji—1———1
Finland—1———1
France131——4
Germany13—2—1
Ghana23—1—6
Greece—1———1
Hungary—2————
India341745—51
Indonesia11641—15
Iran645118
Iraq131128
Ireland—3———2
Israel11———5
Italy12—1—3
Ivory Coast11—1—4
Japan1111—1
Jordan21—1—6
Kazakhstan11—115
Kenya43—113
Kuwait133—27
Malaysia16—3—15
Mexico4513—17
Mongolia11———1
Montenegro—1————
Morocco6311—9
Mozambique31—1—6
Myanmar2111—5
Namibia—————1
Nepal32—1—1
Netherlands12———2
New Zealand—2———2
Nigeria543117
Norway11———2
Oman223136
Pakistan1133——6
Panama342115
Peru54—1—6
Philippines3221—14
Poland11—1—3
Portugal12———1
Qatar2321—6
Romania—1———2
Russia—211—1
Rwanda2211—3
Saudi Arabia1741215
Senegal2111—4
Singapore11—1—2
South Africa23—1—13
South Korea21———5
Spain13—1—3
Sri Lanka321——1
Sweden11—1—1
Syria—————1
Tajikistan—————1
Tanzania14—1—1
Thailand47—1—10
Turkey4211—1
Turkmenistan31—1—3
Uganda55—1—5
Ukraine—————1
United Arab Emirates232119
United Kingdom1311—20
United States202844093624264
Uzbekistan41—1—4
Vietnam5313—13

A dash means coverage is unknown or unconnected. A verified zero is shown only when the metric scope is known.

Daily public additions

First verified public appearance in this library, by UTC+8 day. Source publication dates do not create historical growth.

Reported eventsReviewed factsPublished dossiersRelated guides

History is accumulating. Missing or failed days remain gaps; a single snapshot cannot establish a trend. Historical baseline and backfill are labelled separately.

Inspect recorded days and changes
Day (UTC+8)Coverage statusnew recordsHistorical backfillRevisedWithdrawnRestored
2026-10-15Partial: confirmed material only—0000
2026-10-16Partial: confirmed material only260000
2026-10-17Partial: confirmed material only250000
2026-10-18Partial: confirmed material only250000
2026-10-19Partial: confirmed material only170000
2026-10-20Partial: confirmed material only290000
2026-10-21Partial: confirmed material only251000
2026-10-22Partial: confirmed material only241000
2026-10-23Partial: confirmed material only190000
2026-10-24Partial: confirmed material only200010
2026-10-25Partial: confirmed material only231000
2026-10-26Partial: confirmed material only2413600
2026-10-27Partial: confirmed material only201000
2026-10-28Partial: confirmed material only300000
2026-10-29Partial: confirmed material only240000
2026-10-30Partial: confirmed material only300000
2026-10-31Partial: confirmed material only200000
2026-11-01Partial: confirmed material only180000
2026-11-02Partial: confirmed material only271000
2026-11-03Partial: confirmed material only290000
2026-11-04Partial: confirmed material only231010
2026-11-05Partial: confirmed material only300000
2026-11-06Partial: confirmed material only230000
2026-11-07Partial: confirmed material only140000
2026-11-08Partial: confirmed material only190000
2026-11-09Partial: confirmed material only290000
2026-11-10Partial: confirmed material only250000
2026-11-11Partial: confirmed material only191000
2026-11-12Partial: confirmed material only220000
2026-11-13Partial: confirmed material only170000
2026-11-14Partial: confirmed material only160000
2026-11-15Partial: confirmed material only180000
2026-11-16Partial: confirmed material only180000
2026-11-17Partial: confirmed material only241000

Current sources and reviewed facts

Two separate stocks at the published watermark. No historical stock line is reconstructed from article dates.

Current snapshot only
Independent sources11
Reviewed facts38

Record explorer

Inspect the records behind the selected coverage or day. Source links open the original publisher.

Record typeRecordCountryFirst public verificationEvidence
Guide candidateDomestic Sewage Treatment in Siem Reap: 2026 Equipment GuideEnglish source titleCambodia2026-11-17 14:46Open the record for its evidence
Guide candidateBelt Filter Presses for Dairy Wastewater: 2026 GuideEnglish source titleCountry scope not reported2026-11-17 14:46Open the record for its evidence
Guide candidateDAF vs. Clarifier for Petroleum Wastewater in 2026English source titleCountry scope not reported2026-11-17 14:46Open the record for its evidence
Guide candidateBelt Filter Presses for Brewery Wastewater: 2026 GuideEnglish source titleCountry scope not reported2026-11-17 14:46Open the record for its evidence
Guide candidateDAF vs. Clarifier for Pharma Wastewater in Cincinnati: 2026English source titleUnited States2026-11-17 14:46Open the record for its evidence
Guide candidateDomestic Sewage Treatment Systems for Sihanoukville 2026English source titleCambodia2026-11-17 14:46Open the record for its evidence
Guide candidateBelt Filter Press for Winery Wastewater: 2026 GuideEnglish source titleCountry scope not reported2026-11-17 14:46Open the record for its evidence
Guide candidateFood & Beverage Wastewater Pretreatment Near ChesterEnglish source titleCountry scope not reported2026-11-17 14:46Open the record for its evidence
Guide candidateBelt Filter Press for Distillery Wastewater: 2026 GuideEnglish source titleCountry scope not reported2026-11-17 14:46Open the record for its evidence
Guide candidateDomestic Sewage Treatment Systems in Singapore: 2026 GuideEnglish source titleSingapore2026-11-17 14:46Open the record for its evidence
Guide candidateBelt Filter Presses for Beverage Wastewater: 2026 GuideEnglish source titleCountry scope not reported2026-11-17 14:46Open the record for its evidence
Guide candidateDAF vs. Clarifier for Chemical Wastewater in Port ArthurEnglish source titleUnited States2026-11-17 14:46Open the record for its evidence

Related guides

Technical and news articles provide reading paths and candidate associations; they do not prove a local project or reviewed fact.

More country-specific reading is available through the country links in the coverage table.

Recent reported developments

Source publication and first public verification are separate dates. Reported developments remain observations.

Source published

A chemical manufacturer in Java commissioned a membrane-based system that treats high-strength industrial wastewater, removes ammonia, and recovers ammonium sulfate fertilizer.

Inspect original excerpt
Shanghai QILEE Environmental Equipment Co., Ltd. announced the successful commissioning and operational validation of its skid-mounted PTFE membrane ammonia removal system for a major chemical manufacturer based in Java, Indonesia. The newly installed installation processes 120 cubic meters per day (120 m³/d) of high-strength industrial wastewater, reducing influent ammonia nitrogen concentrations from peaks of 2,500 mg/L down to compliant discharge levels of 15 mg/L or less, while generating high-purity ammonium sulfate solution for the regional agricultural sector.
Original source

First public verification: 2026-11-17 14:46

Source published

The beverage factory in Samagan produces water and soft drinks and includes wastewater treatment facilities.

Inspect original excerpt
Samagan, Burkina Faso. The Burkina Faso factory is at Samagan, near Bobo-Dioulasso. According to the company, the site produces beverages and also makes bottle preforms, caps and carbon dioxide. It has laboratory testing and wastewater treatment facilities.
Original source

First public verification: 2026-11-11 14:38

Source published

The study evaluated conventional and modified anaerobic reactors treating cattle slaughterhouse wastewater collected from a Malaysian abattoir.

Inspect original excerpt
Cattle slaughterhouse wastewater (CSWW) was collected from the discharge point of Selangor abattoir, Malaysia. The abattoir is the biggest in the whole state of Selangor. The sample was immediately transported to the public Health and Environmental Engineering Laboratory at the Universiti Putra Malaysia.
Original source

First public verification: 2026-11-04 15:07

Source published

Ireland regulates domestic wastewater treatment systems and provides national inspection arrangements to protect human health and the environment from septic tank risks.

Inspect original excerpt
Domestic waste water treatment systems (DWWTS) are used by householders to treat sewage. There are nearly half a million systems in Ireland, mostly septic tanks. DWWTS can contaminate household wells with harmful bacteria and viruses if not built and operated properly. Excessive releases of nutrients such as nitrogen and phosphorus can cause pollution in rivers, lakes and coastal waters.
Original source

First public verification: 2026-11-02 14:40

Source published

Research in China examined how textile dyeing exporters around Lake Tai adapted to tighter wastewater standards in Jiangsu.

Inspect original excerpt
I studied how Chinese textile exporters responded when environmental regulations became more stringent, using a change in wastewater standards in Jiangsu province as a natural experiment.. The setting was Lake Tai, one of China’s largest freshwater lakes and the centre of the country’s dyeing industry. Textile dyeing produces heavily polluted wastewater, and by the 2000s the lake was extremely polluted.. In 2005, Jiangsu province responded by tightening the wastewater standard for dyeing firms around the lake.
Original source

First public verification: 2026-10-26 15:04

Source published

United States regulations set discharge limits and conditions for municipal wastewater treatment facilities.

Inspect original excerpt
NPDES permits establish discharge limits and conditions for discharges from municipal wastewater treatment facilities to waters of the United States.
Original source

First public verification: 2026-10-25 14:57

Source published

Canadian study evaluates winery wastewater co-treatment at municipal plants in the Niagara Region, highlighting substantial grey water footprint and treatment performance.

Inspect original excerpt
This work presents a comprehensive assessment of the environmental impact of winery wastewater (WWW) and methods to optimize its co-treatment at municipal wastewater treatment plants (WWTPs). A comprehensive review of full-scale treatment at 53 wineries in Niagara Region, Canada finds constructed wetlands are the most common type of on-site treatment. On-site systems do not address all treatment needs, requiring a portion of the WWW to be co-treated at WWTPs. From freshwater resource impact perspective, the grey water footprint (WF) associated with treated WWW effluents is often neglected from wine-making WF assessments. However, co-treated WWW effluents from WWTPs in Niagara Region are found to exert a substantial grey WF equivalent to over 960 times their volume.
Original source

First public verification: 2026-10-22 16:41

Source published

US EPA detailed study of the petroleum refining industry reviewing refinery wastewater discharges and the existing effluent limitations regulations for potential revision.

Inspect original excerpt
1. Introduction This report summarizes information collected and analyzed by the United States Environmental Protection Agency (EPA) as part of a detailed study of the petroleum refining industry. The EPA conducted this study to review discharges from petroleum refineries and to determine whether the current wastewater discharge regulations for these operations should be revised. The EPA promulgated effluent limitations guidelines and standards (ELGs) for the Petroleum Refining Point Source Category in 1974. The ELGs were challenged in the U.S. Court of Appeals; as a result of the litigation, the EPA made revisions and finalized the ELGs on October 18, 1982.
Original source

First public verification: 2026-10-21 15:40

Comparable water samples

Compare only matching parameter, unit, water stage and scope. Individual facility samples never represent a national average or a continuous water-quality trend.

No group of at least two comparable, reviewed samples is available. Read individual evidence in the published dossiers.

Move from evidence to a treatment discussion

Carry the selected country and industry into your enquiry. Confirm influent conditions, discharge destination and operating scope with the engineering team.

Snapshot scope and provenance
Version
eb40aad971aace20145dd2c0d16623e8d29744cbeddfc5df71745c8c57450fdc
Industry classification version
2026-10-15.1
Reviewed foundation version
20261015T105811-e19facf957c3
Observation version
59613f3b7243a6ca391a86a9395c585e943c1f932df9ea8e1da4e0fcb361e934
Public coverage watermark
0833733d8ac93231ec7f9ef6183d39913224d9a516f37ef8b811edff73067692
Historical baseline cutoff
Not reported

Only caller-frozen public records are counted. Language versions and revisions share a record identity; source versions share the independent source identity.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us