Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Integrated Sewage Treatment

Underground and above-ground integrated wastewater treatment equipment using biological contact oxidation and MBR membrane technology. Ideal for residential, commercial, and industrial sewage treatment.

Integrated Sewage Treatment — Equipment

Underground Package Sewage Treatment Plant (WSZ Series)

WSZ series underground integrated sewage treatment plant combines anoxic/aerobic (A/O) biological contact oxidation with sedimentation and disinfection in a single buried package unit. Fully automated with no operator required, it handles 1–80 m³/h for residential communities, hotels, hospitals, factories, and rural areas. Can be installed below grade with landscaping above, or mounted on a trailer for mobile deployment.

Selection Criteria & Sizing Parameters

Packaged integrated sewage treatment plants (WSZ series) combine anoxic/oxic (A/O or A²/O), MBBR, or MBR biological stages with clarification and disinfection inside a skid-mounted or containerized carbon-steel/FRP shell. Standard modular capacities span 1 to 200 m³/h (24 to 4,800 m³/day). When sizing a unit, confirm influent BOD₅ (typically 150–400 mg/L for domestic/commercial streams, up to 1,200 mg/L for food-adjacent streams), peak hourly flow factor (1.5–2.5× average), ambient temperature (design HRT 6–12 h; heat tracing or insulated housing below 10 °C), and target discharge limits.

Typical Applications & Pretreatment Requirements

Commonly deployed at resorts, hospitals, residential compounds, industrial parks, and remote mining or construction camps where civil concrete basins are impractical. Upstream coarse/fine screening (1–3 mm) and an equalization tank (6–12 h retention) are essential to protect blowers and prevent hydraulic shock; high-FOG kitchens require an upstream grease trap or DAF unit.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us