Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Pure Water & Bottling Equipment

EDI polishing, water softening, bottled water production lines and commercial direct drinking water systems.

Bottled Water Production Line

Complete turnkey bottled water lines integrating RO treatment, pure water storage, PET bottle blowing (350-1500 ml), 8-8-3 filling, labelling, inkjet coding and sleeve shrink packaging - specified as one balanced scope rather than separate machines.

EDI Electrodeionization System

Continuous electrodeionization stacks that polish RO permeate to ultrapure water with no acid or caustic regeneration. Replaces mixed-bed ion exchange, eliminating regeneration wastewater and neutralization tanks. For pharmaceutical, electronics, power and dialysis water.

Industrial Water Softener System (KJ-WT Series)

Twin-tank industrial water softeners from 1 to 45 T/h with paired brine tanks from 60 to 2,000 L. Alternating vessels give uninterrupted soft water for boiler feed, cooling systems, laundries and RO pretreatment.

Commercial Direct Drinking Water System

Point-of-use direct drinking water systems for schools, offices, hospitals and factories - cabinet, floor-standing and under-counter purifiers plus portable water vending machines. Replaces bottled water delivery with treated mains water at the dispensing point.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us