Hollow-fiber PVDF ultrafiltration systems and containerized UF plants from 2 to 40 T/h.
Ultrafiltration (UF) Water Treatment System
Hollow-fiber ultrafiltration systems from 2,000 to 40,000 L/h using 0.03 micron PVDF membranes. Removes bacteria, colloids and suspended solids without chemicals, accepts up to 300 ppm turbidity, with automatic backwash and air scour. For municipal, rural and RO pretreatment duty.