Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Spare Parts & Consumables

RO/UF membranes, filter cartridges, FRP and stainless tanks, control valves, dosing pumps and filter media.

RO & UF Membranes and Filter Elements

Reverse osmosis and ultrafiltration membrane elements, filter cartridges in 10-40 inch lengths, precision and bag filter housings, plus stainless steel and FRP membrane pressure vessels. Compatible with plants from any original supplier.

Water Treatment Parts, Valves & Filter Media

Complete component and consumable supply for RO, UF and softening plants: FRP and stainless tanks, salt and dosing tanks, control valves, pressure gauges, flowmeters, conductivity meters, RO controllers, metering pumps and bulk media including resin, carbon, quartz sand and softener salt.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us