Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Water Treatment Parts, Valves & Filter Media

Water Treatment Parts, Valves & Filter Media
Water Treatment Parts, Valves & Filter Media

Complete component and consumable supply for RO, UF and softening plants: FRP and stainless tanks, salt and dosing tanks, control valves, pressure gauges, flowmeters, conductivity meters, RO controllers, metering pumps and bulk media including resin, carbon, quartz sand and softener salt.

Beyond membranes, a water treatment plant runs on tanks, valves, instruments, dosing pumps and filter media — and it stops running when any one of them fails or runs out. HydropureWater supplies the complete consumable and component list for RO, UF and softening plants: FRP and stainless steel tanks, salt and chemical dosing tanks, multi-port control valves, pressure gauges and flowmeters, conductivity meters and RO program controllers, metering and circulation pumps, and bulk filter media including resin, activated carbon, quartz sand and softener salt.

Key Features

  • FRP tank series in a full range of diameters and heights for filtration and softening duty
  • Stainless steel tank series including vertical pressure vessels and large storage tanks
  • Salt box series and chemical dosing tank series in multiple volumes
  • Multi-port control valves, manual and automatic, with digital timer and volumetric control heads
  • Pressure gauge series including panel-mount, bottom-entry and flange-mount types
  • Flowmeter series: panel rotameters, inline flow tubes and liquid turbine flowmeters
  • Conductivity meters and RO program controllers for automated plant operation
  • Metering pumps, diaphragm metering pumps and digital dosing pumps
  • Multi-stage centrifugal and vertical water pumps
  • Bulk media: ion exchange resin, activated carbon, quartz sand and soft water salt

Component Range

CategoryTypes & SpecificationsFunction
FRP tanksFull diameter and height range, multiple pressure ratingsMedia filtration and softening resin vessels
Stainless steel tanksVertical pressure vessels and large-volume storage tanksFiltration, buffer and pure water storage
Salt boxesCylindrical and cabinet formats, multiple volumesBrine storage for softener regeneration
Chemical dosing tanksCylindrical and rectangular, graduated, multiple volumesAntiscalant, acid, alkali and disinfectant dosing
Control valvesManual lever, digital timer and volumetric control headsFiltration and softening service, backwash and regeneration cycles
Pressure gaugesPanel mount, bottom entry, flange mount; 0–1.6 MPa typical rangeFilter differential pressure and system pressure monitoring
FlowmetersPanel rotameters, inline flow tubes, liquid turbine flowmetersPermeate, concentrate and feed flow measurement
Conductivity metersCM-230s and equivalent online conductivity monitors with probePermeate quality monitoring and alarm
RO program controllersROS-2015 relay controller; ROS-360 touchscreen controllerAutomated RO sequence, flush and alarm control
Metering pumpsSolenoid, diaphragm and digital dosing pumpsAntiscalant and chemical dosing
Water pumpsHorizontal and vertical multi-stage centrifugal pumpsFeed, high-pressure, backwash and transfer duty
Filter mediaIon exchange resin 25 L/pack; activated carbon 25 kg/pack; quartz sand 50 kg/pack; soft water salt 10 kg/packMedia charges and softener regenerant

Applications

  • Routine plant maintenance: media replacement, gauge and valve servicing, dosing pump replacement
  • Regenerant and consumable resupply: softener salt, resin, carbon and quartz sand on a recurring basis
  • Plant upgrades: retrofitting automatic control valves and online conductivity monitoring to manual plants
  • Instrumentation renewal: replacing failed gauges, flowmeters and controllers
  • Building new skids: component supply for system integrators and in-house engineering teams
  • Critical spares holding: on-site stock of items whose failure stops production

Why Buy Components from HydropureWater?

Most plant downtime traces back to a low-value item — a dosing pump that stopped, a control valve that stuck mid-cycle, a conductivity probe reading wrong — and the cost is never the part, it is the production stopped while it is sourced. Because we build complete systems on these same components, we can supply the correct replacement against your existing model number and tell you which items are worth holding as site spares for your particular configuration. We also supply the bulk media on a recurring basis, so resin, carbon, sand and salt arrive on schedule rather than being remembered after the plant has already gone out of specification.

Frequently Asked Questions

How often should filter media be replaced?

Quartz sand and activated carbon are replaced periodically depending on loading — carbon exhausts as it adsorbs chlorine and organics, and sand degrades as grains attrite. Ion exchange resin lasts considerably longer but eventually loses exchange capacity. Falling performance despite correct backwashing is the practical indicator for all three.

What is an RO program controller for?

It automates the reverse osmosis sequence — startup flush, service run, shutdown flush, tank level control and alarms on low inlet pressure or high permeate conductivity. The ROS-2015 is a relay-based controller for straightforward duty; the ROS-360 adds a touchscreen interface for systems where operators need visibility of running conditions.

Do I need a conductivity meter on an RO system?

It is the single most useful instrument on the plant. Permeate conductivity is the direct measure of whether the membranes are still doing their job, and a rising trend gives weeks of warning before the water goes out of specification. Without it, membrane deterioration is usually discovered by a downstream process failing.

What size salt box do I need for my softener?

It is matched to the softener model, since brine volume must suit the resin charge being regenerated — the KJ-WT range pairs each capacity with a specific brine tank from 60 to 2,000 L. If you are replacing a salt box, give us the softener model number rather than measuring the old tank.

Project References

  • Component supply across 1,000+ water treatment projects — tanks, valves, instruments and dosing systems
  • Softener salt and media resupply — recurring consumable supply for softening and filtration plants
  • Control and instrumentation retrofits — upgrading manual plants with automatic valves and online monitoring

After-Sales Service & Support

  • 12-Month Full Warranty — covers all manufacturing defects in materials and workmanship
  • Lifetime Technical Support — our engineering team provides remote diagnostics and troubleshooting assistance
  • Spare Parts Guarantee — critical spare parts shipped within 48 hours worldwide
  • On-Site Commissioning — factory-trained engineers available for installation supervision and operator training
  • Preventive Maintenance Programs — customized maintenance schedules to maximize equipment lifespan

Proposed for These Projects

Engineering assessments where this product is part of our proposed solution. These projects are not yet delivered.

Project demand matrix →

Ready to Solve Your Wastewater Challenges?

Get a free consultation and customized quote from our engineering team.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us