Proposed MLD-ZLD treatment for industrial RO concentrate in Mexico

Proposed MLD-ZLD treatment for industrial RO concentrate, subject to client water analyses, recovery targets and salt-disposal requirements.

Project Background

The client is assessing treatment of reverse-osmosis concentrate from an industrial water-reuse application in Mexico. The design basis is not yet available. We need flow, operating-hour, recovery and full water-quality data, together with intended reuse and residual-disposal criteria, before selecting equipment capacities or confirming the final process.

Our Solution

We propose an engineered train beginning with equalization, screening and chemical conditioning, followed by clarification and filtration to control suspended solids and protect the concentration equipment. Depending on hardness, alkalinity, silica and scaling tendency, a softener or dedicated silica-removal step may be required before a secondary reverse-osmosis or membrane-distillation stage. The resulting brine would pass through staged thermal evaporation and controlled crystallization, with residual solids collected, dewatered and prepared for the client’s approved disposal route. Membrane cleaning, chemical dosing, energy recovery, monitoring and a water-salt balance are included in the assessment. Final equipment selection and capacity will change after the client provides the missing analyses, flow profile and recovery targets.

What We Asked First

Please confirm average and maximum concentrate flow, operating hours, continuous or intermittent discharge, RO flows and recovery, complete concentrate analyses, MLD or ZLD targets, reuse requirements, salt-disposal route, supply scope, available space, utilities, and the process flow diagram.

Proposed Process Train

  1. 1RO concentrate characterization and balancing
  2. 2equalization and screening
  3. 3chemical conditioning and clarifier filtration
  4. 4cartridge filtration and optional softener or silica removal
  5. 5secondary reverse osmosis or MLD stage
  6. 6staged thermal evaporation
  7. 7controlled crystallization and salt drying
  8. 8residual solids handling and water reuse

For Similar Projects

Prepare the water analyses, flow profile, recovery target, reuse specification, utility data and salt-disposal requirements. These items define pretreatment needs, membrane and evaporator loading, energy demand and the appropriate MLD or ZLD configuration.

Ref. A-015. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).

How We Deliver

Projects of this type are delivered in the nine stages below. Installation, commissioning and other on-site stages follow each contract's scope. Every stage within our scope produces a written record that we keep on file.

  1. 1 Design basis confirmationAverage and peak flow, influent or gas data, discharge or reuse target Record producedDesign basis sheet
  2. 2 Process & mechanical designProcess calculations, equipment selection, layout and piping Record producedCalculation book, P&ID, general arrangement
  3. 3 Manufacturing & quality controlMaterial and in-process inspection of the main equipment Record producedMaterial & QC records
  4. 4 Factory acceptance test (FAT)Trial run against the design parameters before dispatch Record producedFAT record
  5. 5 Packing & dispatchPacked, marked and shipped against the equipment list Record producedPacking list
  6. 6 Installation or supervisionPer contract scope Record producedInstallation record
  7. 7 CommissioningStart-up, parameter tuning and interlocks Record producedCommissioning log
  8. 8 Performance verificationEffluent or emission checked against the design basis Record producedPerformance test record
  9. 9 Training, handover & after-salesOperator training, document handover, after-sales support Record producedO&M manual, training record

Planning a similar project? Start with these six parameters

  1. FlowDaily average and peak (m³/day and m³/h)
  2. Influent qualityCOD, BOD₅, TSS, pH and anything unusual
  3. Discharge targetThe standard you must meet, or the reuse purpose
  4. Operating hoursContinuous or batch; seasonal changes
  5. Site & civil scopeFootprint, power supply, who builds the tanks
  6. Project stageBudgeting, tender, or ready to order

Send your parameters — initial process recommendation within 24 hours

Frequently Asked Questions

The process train under assessment is: RO concentrate characterization and balancing → equalization and screening → chemical conditioning and clarifier filtration → cartridge filtration and optional softener or silica removal → secondary reverse osmosis or MLD stage → staged thermal evaporation → controlled crystallization and salt drying → residual solids handling and water reuse.
Yes. Send us your daily and peak flow, influent quality, discharge or reuse target, operating hours and site constraints, and our engineers will reply with an initial process recommendation within 24 hours.

Planning a similar project?

Share your flow, influent quality and discharge target — our engineers respond within 24 hours.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us