Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation
HYDROPUREWATER · Industry library

Municipal wastewater
A connected industry library.

Connect municipal treatment duties from inlet screening to organics, nutrients, disinfection, sludge and intended reuse. Follow each connection to its evidence and operating conditions.

Country coverage & industry connections

Country links count catalog associations, not verified plants or proof that every sub-industry operates there. The right-hand branches are industry references.

Explore the full database →
Country libraryProduction. Water. Treatment.Municipal WastewaterUnited States · 64United States · 64India · 51India · 51Canada · 27Canada · 27Australia · 21Australia · 21United Kingdom · 20United Kingdom · 20Brazil · 19Brazil · 19Inlet pretreatmentInlet pretreatmentSolids & organic loadSolids & organic loadNitrogen & phosphorusNitrogen & phosphorusDisinfectionDisinfectionSludge & residualsSludge & residualsControlled water reuseControlled water reuse
Country links count catalog associations, not verified plants or proof that every sub-industry operates there. The right-hand branches are industry references.
Browse all country libraries
United States64India51Canada27Australia21United Kingdom20Brazil19Mexico17Malaysia16Indonesia15Saudi Arabia15Philippines14Pakistan13South Africa13Vietnam13Thailand10France9Morocco9United Arab Emirates9Egypt8Germany8Iran8Iraq8Bangladesh7Colombia7Kuwait7Nigeria7Algeria6Bahrain6Cambodia6Chile6Ghana6Jordan6Mozambique6Oman6Peru6Qatar6Angola5Argentina5Ecuador5Israel5Kazakhstan5Myanmar5Panama5South Korea5Uganda5Cameroon4Dominican Republic4Italy4Ivory Coast4Senegal4Sri Lanka4Uzbekistan4Kenya3Poland3Rwanda3Spain3Turkmenistan3Costa Rica2Czech Republic2Ireland2Netherlands2New Zealand2Norway2Romania2Singapore2Botswana1China1Cyprus1Denmark1El Salvador1Ethiopia1Fiji1Finland1Greece1Japan1Mongolia1Namibia1Nepal1Portugal1Russia1Sweden1Syria1Tajikistan1Tanzania1Turkey1Ukraine1

Production. Water. Treatment.

Choose a branch, then select a connection. Read what supports it, when it applies and where it stops.

Screening and grit removal protect downstream equipment but perform different separation duties. Neither replaces biological treatment.

Production streamWater challengeTreatment / controlIncoming sewageIncoming sewageRags & large debrisRags & large debrisSuitable inlet screeningSuitable inlet screeningScreened sewageScreened sewageSand & abrasive gritSand & abrasive gritGrit removalGrit removal
All documented connections
Production streamWater challengeTreatment / controlWhen it applies
Inlet pretreatment · Incoming sewageRags & large debrisSuitable inlet screening

Remove coarse material that can clog pumps and damage downstream equipment; opening size and handling depend on the following process.

Assess peak flow, debris loading, head loss, cleaning, bypass and safe screenings disposal.

A screen is not removal of dissolved BOD, nutrients or pathogens; a coarse screen may not meet an MBR’s fine-screening need.

United States Environmental Protection Agency United States Environmental Protection Agency
Inlet pretreatment · Screened sewageSand & abrasive gritGrit removal

Separate dense grit to reduce abrasion and accumulation in channels, tanks and digesters after coarse debris is removed.

Review particle characteristics, wet-weather loading and hydraulics across the operating flow range.

Grit removal and screening are not interchangeable. Captured grit still requires washing or disposal arrangements as appropriate.

United States Environmental Protection Agency
Solids & organic load · Pretreated sewageSettleable suspended solidsPrimary clarification option

Where included in the selected train, primary settling transfers settleable material into a sludge stream before subsequent treatment.

Assess settling behavior, flow and solids load, sludge withdrawal and the carbon balance needed by downstream treatment.

Gravity settling does not adequately remove dissolved pollutants. Primary clarification is not mandatory in every alternative process layout.

United States Environmental Protection Agency
Solids & organic load · Biological-stage feedBiodegradable organicsBiology & biomass separation

Microorganisms reduce biodegradable organic pollution; attached-growth, activated-sludge and other suitable systems use different biomass-retention arrangements.

Confirm oxygen supply, temperature, loading, retention and operators; control inhibitory industrial inputs before they reach the plant.

Organic removal alone does not prove nutrient, pathogen or dissolved-salt compliance. MBR is one alternative, not the default for every municipality.

United States Environmental Protection Agency IFC / World Bank Group
Nitrogen & phosphorus · Ammonia-bearing sewageAmmonia & total nitrogenNitrification / denitrification

Nitrification converts ammonia to oxidized nitrogen. Denitrification can then convert nitrate to nitrogen gas under appropriate anoxic conditions.

Assess temperature, sludge age, oxygen, alkalinity, carbon availability and recycles against the actual nitrogen species and target.

Nitrification alone is not total-nitrogen removal. No low-effluent concentration is guaranteed by naming a process or supplying a dosing unit.

United States Environmental Protection Agency
Nitrogen & phosphorus · Phosphorus-bearing sewageSoluble & particulate PP removal & solids capture

Biological uptake or chemical precipitation targets soluble phosphorus; subsequent solids removal carries captured phosphorus out of the water.

Select the approach using influent carbon and phosphorus forms, pH, chemical tests, solids separation and sludge-management capacity.

A chemical dosing system alone does not remove the resulting precipitate. Additional chemicals can increase sludge requiring management.

United States Environmental Protection Agency
Disinfection · Clarified treated effluentResidual pathogensValidated UV disinfection

UV can inactivate microorganisms when the reactor delivers the required exposure to sufficiently treated water.

Check UV transmittance, solids, peak hydraulics, lamp aging, fouling, cleaning and validation for the required microbial target.

Turbidity and particles can shield organisms. UV does not remove dissolved salts or provide a persistent disinfectant residual.

United States Environmental Protection Agency
Disinfection · Treated-effluent disinfectionMicrobial exposure riskControlled chemical contact

Where selected, chemical disinfection needs appropriate dosing, mixing and contact arrangements, followed by residual control when required by the receiving route.

Evaluate disinfectant demand, actual hydraulics, pH, safety, monitoring and any dechlorination requirement.

A dosing skid is not a complete validated disinfection process. Excess residual can harm the receiving environment.

United States Environmental Protection Agency IFC / World Bank Group
Sludge & residuals · Primary & waste sludgeUnstable organic residualsSuitable sludge stabilization

Select digestion or another appropriate stabilization route according to sludge quantity, composition, operating resources and intended use or disposal.

Review energy, temperature, retention, gas handling, pathogens, industrial contaminants and the acceptance conditions of the destination.

Stabilization or dewatering alone does not confer permission for agricultural use or prove the absence of hazardous constituents.

IFC / World Bank Group
Sludge & residuals · Conditioned sludgeWater-rich sludge volumeTested mechanical dewatering

Mechanical dewatering transfers water to a filtrate and reduces sludge volume. A plate press is one option among alternatives to compare.

Test representative sludge, conditioning, cake handling, filtrate return, staffing and the whole-life cost of the selected route.

No cake dryness is guaranteed here. Dewatering is not disinfection and does not destroy pollutants retained in the cake.

United States Environmental Protection Agency
Controlled water reuse · Space-constrained treatmentBiomass & solids separationAssess an MBR alternative

An MBR combines biological treatment and membrane solids separation, which can support a compact layout and subsequent reuse treatment.

Compare conventional alternatives, fine screening, fouling, membrane cleaning, aeration energy, replacement and operator support.

Nutrient removal needs a suitable biological design. Microfiltration is not desalination, and MBR effluent is not automatically potable or authorized for reuse.

United States Environmental Protection Agency United States Environmental Protection Agency
Controlled water reuse · Planned reuse supplyUse-specific health & chemistryFit-for-use barriers & monitoring

Match treatment barriers, disinfection and monitoring to the intended non-potable or other separately assessed use and its exposure risks.

Define users, distribution, storage, cross-connection controls, chemical and microbial targets, reliability and the applicable reuse authorization.

Visual clarity and equipment names are not water-quality evidence. Potable reuse requires a separate validated treatment and regulatory assessment.

United States Environmental Protection Agency IFC / World Bank Group

Equipment in context

Equipment follows the treatment duty. Flow, solids, fats, biodegradability and the receiving route still require a site assessment.

Original references

Technical reference for municipal treatment choices, not a universal process train or local discharge/reuse standard. Assess the actual influent, industrial contributions, receiving water, use, operator capacity and applicable authorization.

Technical references reviewed

Wastewater Technology Fact Sheet: Screening and Grit Removal

United States Environmental Protection Agency · Description — Screening; Grit Removal · Printed page 1–2

EPA technical fact sheet for preliminary wastewater treatment; not an equipment certification or national discharge limit.

prevent damage and clogging of downstream equipment
Read original source ↗
Primer for Municipal Wastewater Treatment Systems — EPA 832-R-04-001

United States Environmental Protection Agency · Primary Sedimentation; Secondary Treatment; Suspended Growth Processes; Disinfection · Printed page 11–13, 16

Historical U.S. treatment primer used for process principles. Historic statistics and U.S. requirements are not presented as worldwide or current local rules.

aerated water mixture
Read original source ↗
Biological Nutrient Removal Processes and Costs

United States Environmental Protection Agency · Description — Nitrogen Removal; Phosphorus Removal · Printed page 1–3

Technical explanation of nitrogen and phosphorus removal. Reported technology limits and historical costs are not copied as plant guarantees or permit limits.

nitrification by itself does not actually remove nitrogen
Read original source ↗
Wastewater Technology Fact Sheet: Ultraviolet Disinfection — EPA 832-F-99-064

United States Environmental Protection Agency · Description; Advantages and Disadvantages; Applicability; Design Criteria · Printed page 1–4

Technical fact sheet for wastewater UV disinfection. Design needs current validation and applicable site-specific microbial targets.

Turbidity and total suspended solids
Read original source ↗
Biosolids Technology Fact Sheet: Recessed-Plate Filter Press — EPA 832-F-00-058

United States Environmental Protection Agency · Description; Applicability; Design Criteria · Printed page 1–4

Dewatering principles and selection considerations for recessed-plate presses. This does not validate a catalog model or confer pathogen or land-use approval.

remove water from liquid wastewater residuals
Read original source ↗
EHS Guidelines for Water and Sanitation

IFC / World Bank Group · 1.1.2 Sanitation — Wastewater and Sludge Treatment; Solid Waste; Annex A — Sludge Treatment and Disposal · Printed page 8–10, 30–33

GIIP technical reference for collection and treatment of sewage. Project targets depend on health objectives, receiving environment and applicable national requirements.

the planned disposal or use
Read original source ↗
Wastewater Management Fact Sheet: Membrane Bioreactors

United States Environmental Protection Agency · Introduction; Applicability; Advantages and Disadvantages; Membrane Filtration · Printed page 1–2

Technical description of MBR options, maintenance and costs. Nutrient performance depends on biological design; the reference is not a product performance approval.

a suspended growth biological reactor with solids removal via filtration
Read original source ↗
Basic Information about Water Reuse

United States Environmental Protection Agency · Basics of Water Reuse Treatment; Redundancy; Protecting your health · Printed page Web sections

Current public explanation of treatment according to intended use and exposure. It is not a permit, a local reuse specification or approval for drinking-water production.

depends on the risk to human health or the environment
Read original source ↗

Questions before selecting a treatment

Is one municipal treatment train suitable for every country?

No. Select treatment using actual influent, climate, receiving water or planned use, permit requirements and operating resources. The references describe choices and do not replace a local design assessment.

Does nitrification alone remove total nitrogen?

No. Nitrification changes ammonia into oxidized nitrogen. Where total-nitrogen reduction is required, an appropriate removal pathway such as denitrification must also be designed and verified.

Does an MBR make municipal effluent ready for any reuse?

No. MBR treatment and membrane separation may support reuse, but intended use, pathogens, chemicals, salts, monitoring, reliability and authorization require separate confirmation. It is not automatic drinking-water approval.

Does a filter press disinfect sewage sludge?

A filter press separates water and solids. Pathogen reduction, stabilization, contaminants and the authorized disposal or beneficial-use route remain separate requirements; a dry-looking cake is not evidence of safety.

What information is needed to select municipal equipment?

Provide location, average and peak flow, seasonal and industrial contributions, representative water analysis, discharge or reuse targets, land, electricity, operators and the sludge route. Select each unit for its defined duty within the full train.

Bring your process into the picture.

Share your country, production stream and available water analysis to assess a suitable treatment train.

Discuss your wastewater →

Municipal Wastewater — water evidence database

Public guides, reported developments and reviewed evidence. Counts describe this library’s coverage.

Explore relationships
Partial: confirmed material onlyPartial coveragePublic snapshot · UTC+8

Related guides
669
Reported events
2
Reviewed facts
12
Published dossiers
1
Independent sources
3

Guides are article candidates, events are source-supported reports, and facts are reviewed records. Countries and industries overlap; grouped counts cannot be added into a global total.

Country × industry coverage

Select a cell to inspect its records. Coverage measures published material, never market size, factories or local project volume.

Related guides · more published material
Select a cell to inspect its records. Coverage measures published material, never market size, factories or local project volume.
CountryTextileFood & BeverageChemical ManufacturingPharmaceutical ManufacturingOil & GasMunicipal Wastewater
Algeria13—116
Angola33—115
Argentina1511—5
Australia24—1121
Azerbaijan———1——
Bahrain1111—6
Bangladesh101—2—7
Bolivia1—————
Botswana—————1
Brazil1511119
Burkina Faso—1————
Cambodia22—1—6
Cameroon23—1—4
Canada252——27
Chile13—1—6
China5111—1
Colombia14—1—7
Costa Rica11—1—2
Cyprus—————1
Czech Republic—1———2
Denmark—2—1—1
Dominican Republic2211—4
Ecuador1321—5
Egypt420108
El Salvador—————1
Ethiopia33—1—1
Fiji—1———1
Finland—1———1
France1311—9
Germany13—3—8
Ghana23—1—6
Greece—1———1
Hungary—2————
India341745—51
Indonesia11641—15
Iran645118
Iraq131128
Ireland—3———2
Israel11———5
Italy13—1—4
Ivory Coast11—1—4
Japan1111—1
Jordan21—1—6
Kazakhstan11—115
Kenya43—113
Kuwait133—27
Lebanon————1—
Malaysia16—3—16
Mexico4513—17
Mongolia12———1
Montenegro—1————
Morocco6311—9
Mozambique31—1—6
Myanmar2111—5
Namibia—————1
Nepal32—1—1
Netherlands12———2
New Zealand—2———2
Nigeria553117
Norway11———2
Oman223136
Pakistan12330—13
Panama342115
Peru54—1—6
Philippines3321—14
Poland11—1—3
Portugal12———1
Qatar2321—6
Romania—1———2
Russia—211—1
Rwanda2211—3
Saudi Arabia1741215
Senegal2111—4
Singapore11—1—2
South Africa23—1—13
South Korea21———5
Spain13—1—3
Sri Lanka421——4
Sweden11—1—1
Syria—————1
Tajikistan—————1
Tanzania14—1—1
Thailand47—1—10
Turkey4211—1
Turkmenistan31—1—3
Uganda55—1—5
Ukraine—————1
United Arab Emirates232119
United Kingdom1311—20
United States212984213824864
Uzbekistan41—1—4
Vietnam5313—13

A dash means coverage is unknown or unconnected. A verified zero is shown only when the metric scope is known.

Daily public additions

First verified public appearance in this library, by UTC+8 day. Source publication dates do not create historical growth.

Reported eventsReviewed factsPublished dossiersRelated guides
—
—
—
—

History is accumulating. Missing or failed days remain gaps; a single snapshot cannot establish a trend. Historical baseline and backfill are labelled separately.

Inspect recorded days and changes
Day (UTC+8)Coverage statusnew recordsHistorical backfillRevisedWithdrawnRestored
2026-10-15Partial: confirmed material only—0000
2026-10-16Partial: confirmed material only100000
2026-10-17Partial: confirmed material only20000
2026-10-18Partial: confirmed material only80000
2026-10-19Partial: confirmed material only80000
2026-10-20Partial: confirmed material only90000
2026-10-21Partial: confirmed material only50000
2026-10-22Partial: confirmed material only50000
2026-10-23Partial: confirmed material only80000
2026-10-24Partial: confirmed material only60010
2026-10-25Partial: confirmed material only61000
2026-10-26Partial: confirmed material only70000
2026-10-27Partial: confirmed material only60000
2026-10-28Partial: confirmed material only70000
2026-10-29Partial: confirmed material only90000
2026-10-30Partial: confirmed material only70000
2026-10-31Partial: confirmed material only80000
2026-11-01Partial: confirmed material only50000
2026-11-02Partial: confirmed material only91000
2026-11-03Partial: confirmed material only50000
2026-11-04Partial: confirmed material only110000
2026-11-05Partial: confirmed material only50000
2026-11-06Partial: confirmed material only70000
2026-11-07Partial: confirmed material only60000
2026-11-08Partial: confirmed material only70000
2026-11-09Partial: confirmed material only70000
2026-11-10Partial: confirmed material only90000
2026-11-11Partial: confirmed material only80000
2026-11-12Partial: confirmed material only80000
2026-11-13Partial: confirmed material only70000
2026-11-14Partial: confirmed material only50000
2026-11-15Partial: confirmed material only60000
2026-11-16Partial: confirmed material only70000
2026-11-17Partial: confirmed material only40000
2026-11-18Partial: confirmed material only170000
2026-11-19Partial: confirmed material only40000
2026-11-20Partial: confirmed material only60000
2026-11-21Partial: confirmed material only60000
2026-11-22Partial: confirmed material only70000
2026-11-23Partial: confirmed material only80000
2026-11-24Partial: confirmed material only—0000
2026-11-25Partial: confirmed material only—0000
2026-11-26Partial: confirmed material only—0000
2026-11-27Partial: confirmed material only—0000

Current sources and reviewed facts

Two separate stocks at the published watermark. No historical stock line is reconstructed from article dates.

Current snapshot only
Independent sources3
Reviewed facts12

Record explorer

Inspect the records behind the selected coverage or day. Source links open the original publisher.

Record typeRecordCountryFirst public verificationEvidence
Guide candidateRefurbish or Upgrade? Choosing Sewage Treatment for Secondary CitiesEnglish source titleBotswana2026-11-23 16:15Open the record for its evidence
Guide candidateColombo Domestic Sewage Treatment: Sewer, A/O or MBR?English source titleSri Lanka2026-11-23 16:15Open the record for its evidence
Guide candidateKandy Domestic Sewage: Sewer, WSZ Package Plant or MBR?English source titleSri Lanka2026-11-23 16:15Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Rajshahi: Packaged Plant or MBR?English source titleBangladesh2026-11-23 09:46Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Sylhet: A/O, MBR or Centralized?English source titleBangladesh2026-11-23 09:46Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Pakistan: Packaged Plant or MBR?English source titlePakistan2026-11-23 09:46Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Hamburg: Public Sewer, A/O or MBR?English source titleGermany2026-11-23 09:46Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Toulouse: Sewer, A/O Plant or MBR?English source titleFrance2026-11-23 09:46Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Nice: Public Sewer or Package Plant?English source titleFrance2026-11-22 15:19Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Bordeaux: Sewer or A/O Plant?English source titleFrance2026-11-22 15:19Open the record for its evidence
Guide candidateA/O Package Plant or MBR for Domestic Sewage Treatment in ItalyEnglish source titleItaly2026-11-22 15:19Open the record for its evidence
Guide candidateA/O Package Plant or MBR for Domestic Sewage in RawalpindiEnglish source titlePakistan2026-11-22 15:19Open the record for its evidence

Related guides

Technical and news articles provide reading paths and candidate associations; they do not prove a local project or reviewed fact.

More country-specific reading is available through the country links in the coverage table.

Recent reported developments

Source publication and first public verification are separate dates. Reported developments remain observations.

Source published

Ireland regulates domestic wastewater treatment systems and provides national inspection arrangements to protect human health and the environment from septic tank risks.

Inspect original excerpt
Domestic waste water treatment systems (DWWTS) are used by householders to treat sewage. There are nearly half a million systems in Ireland, mostly septic tanks. DWWTS can contaminate household wells with harmful bacteria and viruses if not built and operated properly. Excessive releases of nutrients such as nitrogen and phosphorus can cause pollution in rivers, lakes and coastal waters.
Original source

First public verification: 2026-11-02 14:40

Source published

United States regulations set discharge limits and conditions for municipal wastewater treatment facilities.

Inspect original excerpt
NPDES permits establish discharge limits and conditions for discharges from municipal wastewater treatment facilities to waters of the United States.
Original source

First public verification: 2026-10-25 14:57

Comparable water samples

Compare only matching parameter, unit, water stage and scope. Individual facility samples never represent a national average or a continuous water-quality trend.

No group of at least two comparable, reviewed samples is available. Read individual evidence in the published dossiers.

Move from evidence to a treatment discussion

Carry the selected country and industry into your enquiry. Confirm influent conditions, discharge destination and operating scope with the engineering team.

Snapshot scope and provenance
Version
f206d04910a0ea372bb598bc65cc3a1a1cb236e3a94b663d9541a948befa0f1b
Industry classification version
2026-10-15.1
Reviewed foundation version
20261015T105811-e19facf957c3
Observation version
abfa861e74aecc77ea9868b3a7cd0d5798b4ef8727c58e74be886121e4ccb3a0
Public coverage watermark
5a11f8fbef38fd891bc1591a728245cd110d16215dcdece9552c3b98394a826b
Historical baseline cutoff
Not reported

Only caller-frozen public records are counted. Language versions and revisions share a record identity; source versions share the independent source identity.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us