Membrane Bioreactor (MBR) equipment and membrane modules for advanced wastewater treatment and water reuse applications.
MBR Membrane Systems — Equipment
Integrated MBR membrane bioreactor system combining activated sludge treatment with submerged PVDF membrane filtration. Delivers near-reuse-quality effluent (<1 μm filtration) with 60% smaller footprint than conventional systems. Ideal for municipal sewage, industrial process water, and water reuse projects from 10 to 2,000 m³/day.
DF series PVDF flat sheet membrane modules for submerged MBR applications. Features 0.1 μm pore size with integrated aeration box for continuous membrane scouring. Individually replaceable membrane elements, stainless steel frame, and 10–20× lower energy consumption than external cross-flow systems. Available in 80–225 m² configurations producing 32–135 m³/day.
MBR Design Envelope & Membrane Selection
Membrane Bioreactor (MBR) systems pair activated sludge at high MLSS (6,000–12,000 mg/L) with submerged PVDF hollow-fiber or flat-sheet ultrafiltration membranes (nominal pore size 0.03–0.1 µm). Typical design flux ranges from 12 to 25 LMH depending on wastewater fouling propensity, cutting footprint by 40–60% compared with conventional activated sludge + secondary clarifiers and delivering permeate turbidity <1 NTU and TSS <5 mg/L suitable for RO feed or non-potable reuse.
Applications & Fouling Control
Ideal for high-strength food, pharmaceutical, chemical, landfill leachate, and hospital effluents or tight-footprint municipal upgrades. Reliable operation requires 1–2 mm fine drum screening, FOG <30 mg/L upstream, continuous air scouring, and scheduled CIP cleaning with sodium hypochlorite and citric acid.