Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Chemical Dosing Systems

Automatic chemical dosing equipment for PAC, PAM, acid/alkali, phosphate, and chlorine dosing in water treatment processes.

Chemical Dosing Systems — Equipment

Automatic Chemical Dosing System

HydropureWater automatic chemical dosing systems provide precise, PLC-controlled injection of coagulants, flocculants, pH adjusters, and specialty chemicals for water and wastewater treatment. Skid-mounted, pre-wired, and factory-tested for rapid installation.

Dosing Pump Sizing, Tank Volume & Automation

Skid-mounted chemical dosing systems integrate PE/FRP/SS316 storage tanks (100–5,000 L), electric mixers, diaphragm or plunger metering pumps, pulsation dampeners, back-pressure/relief valves, and PLC/pH/ORP feedback loops. Pump capacity is sized at 1.5–2× peak chemical demand (e.g., PAC/alum coagulant, NaOH/H₂SO₄ pH trim, NaClO oxidant, or PAM polymer at 0.1–0.3% solution) with ±1% metering repeatability.

Applications & Material Compatibility

Deployed across coagulation-flocculation, pH neutralization, boiler/RO antiscalant dosing, and disinfection. Match wetted materials strictly to the reagent—UPVC/PVDF/PTFE for HCl, NaClO, and ferric chloride; SS316L for caustic soda and non-oxidizing polymers.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us