Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Air & Dust Treatment

Desulfurization scrubbers and bag filter dust collectors for industrial flue gas and dust emission control.

Flue Gas Desulfurization (FGD) Scrubber System

HydropureWater's Flue Gas Desulfurization (FGD) Scrubber combines SO₂ removal and particulate collection in a single integrated tower. Using lime/limestone wet scrubbing, it achieves high desulfurization efficiency while producing reusable gypsum byproduct — with no moving parts, low operating cost, and compliance with EPA NSPS, EU Industrial Emissions Directive 2010/75/EU, and World Bank emission guidelines.

Pulse Jet Baghouse Dust Collector (ZSDM Series)

The ZSDM Series Pulse Jet Baghouse is a high-efficiency fabric filter dust collector engineered for coal-fired boilers and industrial furnaces. Featuring low-pressure long-bag pulse cleaning, an integrated bypass system, and modular construction, it achieves particulate emission levels below 10 mg/Nm³ — meeting EPA NSPS, EU Industrial Emissions Directive 2010/75/EU, and BAT-AEL requirements.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us