Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Industrial wastewater, connected.

Explore country coverage across six industries. Open daily data, compare reviewed records, or follow a connection to its original evidence.

Select an entry to follow its connections. Select a line to see what it means and the source behind it. Swipe the canvas on mobile.

Follow a country through its industry, water challenges, treatment and equipment.

Industrial water evidence database

Public guides, reported developments and reviewed evidence. Counts describe this library’s coverage.

Explore relationships
Partial: confirmed material onlyPartial coveragePublic snapshot · UTC+8

Related guides
2,683
Reported events
7
Reviewed facts
38
Published dossiers
2
Independent sources
9

Guides are article candidates, events are source-supported reports, and facts are reviewed records. Countries and industries overlap; grouped counts cannot be added into a global total.

Country × industry coverage

Select a cell to inspect its records. Coverage measures published material, never market size, factories or local project volume.

Related guides · more published material
Select a cell to inspect its records. Coverage measures published material, never market size, factories or local project volume.
CountryTextileFood & BeverageChemical ManufacturingPharmaceutical ManufacturingOil & GasMunicipal Wastewater
Algeria13—116
Angola33—115
Argentina1511—1
Australia24—1121
Azerbaijan———1——
Bahrain1111—6
Bangladesh81—2—1
Bolivia1—————
Brazil1411118
Cambodia22—1—2
Cameroon23—1—4
Canada252——26
Chile13—1—1
China5111—1
Colombia13—1—3
Costa Rica—1———1
Cyprus—————1
Czech Republic—1———2
Denmark—2—1—1
Dominican Republic121——1
Ecuador1321—1
Egypt42—1—8
El Salvador—————1
Ethiopia23—1—1
Fiji—————1
Finland—1———1
France131——4
Germany13—2—1
Ghana23—1—6
Greece—1———1
Hungary—2————
India341745—50
Indonesia11631—15
Iran645118
Iraq131128
Ireland—3———2
Israel11———5
Italy12—1—3
Ivory Coast11—1—4
Japan1111—1
Jordan21—1—6
Kazakhstan11—115
Kenya43—113
Kuwait133—27
Malaysia16—3—6
Mexico3413—17
Mongolia11———1
Montenegro—1————
Morocco6311—9
Mozambique31—1—6
Myanmar1111—1
Namibia—————1
Nepal32—1—1
Netherlands12———2
New Zealand—2———2
Nigeria543117
Norway11———2
Oman223136
Pakistan1133——6
Panama242——2
Peru44—1—1
Philippines3221—13
Poland11—1—3
Portugal12———1
Qatar2321—6
Romania—1———2
Russia—211—1
Rwanda2211—3
Saudi Arabia1741215
Senegal2111—4
Singapore11—1—1
South Africa23—1—13
South Korea21———5
Spain13—1—2
Sri Lanka321——1
Sweden11—1—1
Syria—————1
Tajikistan—————1
Tanzania14—1—1
Thailand37—1—1
Turkey4211—1
Turkmenistan31—1—3
Uganda55—1—5
Ukraine—————1
United Arab Emirates232119
United Kingdom1311—20
United States202563883422664
Uzbekistan41—1—4
Vietnam5313—13

A dash means coverage is unknown or unconnected. A verified zero is shown only when the metric scope is known.

Daily public additions

First verified public appearance in this library, by UTC+8 day. Source publication dates do not create historical growth.

Reported eventsReviewed factsPublished dossiersRelated guides
—
—
—
—
—
—

History is accumulating. Missing or failed days remain gaps; a single snapshot cannot establish a trend. Historical baseline and backfill are labelled separately.

Inspect recorded days and changes
Day (UTC+8)Coverage statusnew recordsHistorical backfillRevisedWithdrawnRestored
2026-10-15Partial: confirmed material only—0000
2026-10-16Partial: confirmed material only260000
2026-10-17Partial: confirmed material only250000
2026-10-18Partial: confirmed material only250000
2026-10-19Partial: confirmed material only170000
2026-10-20Partial: confirmed material only290000
2026-10-21Partial: confirmed material only251000
2026-10-22Partial: confirmed material only241000
2026-10-23Partial: confirmed material only190000
2026-10-24Partial: confirmed material only200010
2026-10-25Partial: confirmed material only231000
2026-10-26Partial: confirmed material only2413600
2026-10-27Partial: confirmed material only201000
2026-10-28Partial: confirmed material only300000
2026-10-29Partial: confirmed material only240000
2026-10-30Partial: confirmed material only300000
2026-10-31Partial: confirmed material only200000
2026-11-01Partial: confirmed material only180000
2026-11-02Partial: confirmed material only271000
2026-11-03Partial: confirmed material only290000
2026-11-04Partial: confirmed material only231010
2026-11-05Partial: confirmed material only300000
2026-11-06Partial: confirmed material only230000
2026-11-07Partial: confirmed material only140000
2026-11-08Partial: confirmed material only190000

Current sources and reviewed facts

Two separate stocks at the published watermark. No historical stock line is reconstructed from article dates.

Current snapshot only
Independent sources9
Reviewed facts38

Record explorer

Inspect the records behind the selected coverage or day. Source links open the original publisher.

Record typeRecordCountryFirst public verificationEvidence
Guide candidateDomestic Sewage Treatment in Manaus: 2026 Buyer’s GuideEnglish source titleBrazil2026-11-08 15:33Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Curitiba: 2026 Equipment GuideEnglish source titleBrazil2026-11-08 15:33Open the record for its evidence
Guide candidateMBR vs Conventional Activated Sludge for Chemical Wastewater 2026English source titleCountry scope not reported2026-11-08 15:33Open the record for its evidence
Guide candidateMBR vs Conventional Activated Sludge for Food Wastewater in Morton (2026)English source titleCountry scope not reported2026-11-08 15:33Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Recife: 2026 Equipment GuideEnglish source titleBrazil2026-11-08 15:33Open the record for its evidence
Guide candidateMBR vs Conventional Activated Sludge for Food & Bev Wastewater 2026English source titleCountry scope not reported2026-11-08 15:33Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Porto Alegre: 2026 GuideEnglish source titleBrazil2026-11-08 15:33Open the record for its evidence
Guide candidateHow Do Organic Chemical Plants Meet Wilmington Sewer Limits?English source titleUnited States2026-11-08 15:33Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Colombia: 2026 Engineering GuideEnglish source titleColombia2026-11-08 15:33Open the record for its evidence
Guide candidateMBR vs Conventional Activated Sludge for Chemical Wastewater in Rockwood, US: 2026 GuideEnglish source titleUnited States2026-11-08 15:33Open the record for its evidence
Guide candidatePharmaceutical Wastewater Treatment in Colombia: 2026 Technology Selection & Compliance GuideEnglish source titleColombia2026-11-08 15:33Open the record for its evidence
Guide candidateMBR vs Conventional Activated Sludge for Petroleum Wastewater in Birmingham, AL: 2026 ComparisonEnglish source titleUnited States2026-11-08 15:33Open the record for its evidence

Related guides

Technical and news articles provide reading paths and candidate associations; they do not prove a local project or reviewed fact.

More country-specific reading is available through the country links in the coverage table.

Recent reported developments

Source publication and first public verification are separate dates. Reported developments remain observations.

Source published

The study evaluated conventional and modified anaerobic reactors treating cattle slaughterhouse wastewater collected from a Malaysian abattoir.

Inspect original excerpt
Cattle slaughterhouse wastewater (CSWW) was collected from the discharge point of Selangor abattoir, Malaysia. The abattoir is the biggest in the whole state of Selangor. The sample was immediately transported to the public Health and Environmental Engineering Laboratory at the Universiti Putra Malaysia.
Original source

First public verification: 2026-11-04 15:07

Source published

Ireland regulates domestic wastewater treatment systems and provides national inspection arrangements to protect human health and the environment from septic tank risks.

Inspect original excerpt
Domestic waste water treatment systems (DWWTS) are used by householders to treat sewage. There are nearly half a million systems in Ireland, mostly septic tanks. DWWTS can contaminate household wells with harmful bacteria and viruses if not built and operated properly. Excessive releases of nutrients such as nitrogen and phosphorus can cause pollution in rivers, lakes and coastal waters.
Original source

First public verification: 2026-11-02 14:40

Source published

Research in China examined how textile dyeing exporters around Lake Tai adapted to tighter wastewater standards in Jiangsu.

Inspect original excerpt
I studied how Chinese textile exporters responded when environmental regulations became more stringent, using a change in wastewater standards in Jiangsu province as a natural experiment.. The setting was Lake Tai, one of China’s largest freshwater lakes and the centre of the country’s dyeing industry. Textile dyeing produces heavily polluted wastewater, and by the 2000s the lake was extremely polluted.. In 2005, Jiangsu province responded by tightening the wastewater standard for dyeing firms around the lake.
Original source

First public verification: 2026-10-26 15:04

Source published

United States regulations set discharge limits and conditions for municipal wastewater treatment facilities.

Inspect original excerpt
NPDES permits establish discharge limits and conditions for discharges from municipal wastewater treatment facilities to waters of the United States.
Original source

First public verification: 2026-10-25 14:57

Source published

Canadian study evaluates winery wastewater co-treatment at municipal plants in the Niagara Region, highlighting substantial grey water footprint and treatment performance.

Inspect original excerpt
This work presents a comprehensive assessment of the environmental impact of winery wastewater (WWW) and methods to optimize its co-treatment at municipal wastewater treatment plants (WWTPs). A comprehensive review of full-scale treatment at 53 wineries in Niagara Region, Canada finds constructed wetlands are the most common type of on-site treatment. On-site systems do not address all treatment needs, requiring a portion of the WWW to be co-treated at WWTPs. From freshwater resource impact perspective, the grey water footprint (WF) associated with treated WWW effluents is often neglected from wine-making WF assessments. However, co-treated WWW effluents from WWTPs in Niagara Region are found to exert a substantial grey WF equivalent to over 960 times their volume.
Original source

First public verification: 2026-10-22 16:41

Source published

US EPA detailed study of the petroleum refining industry reviewing refinery wastewater discharges and the existing effluent limitations regulations for potential revision.

Inspect original excerpt
1. Introduction This report summarizes information collected and analyzed by the United States Environmental Protection Agency (EPA) as part of a detailed study of the petroleum refining industry. The EPA conducted this study to review discharges from petroleum refineries and to determine whether the current wastewater discharge regulations for these operations should be revised. The EPA promulgated effluent limitations guidelines and standards (ELGs) for the Petroleum Refining Point Source Category in 1974. The ELGs were challenged in the U.S. Court of Appeals; as a result of the litigation, the EPA made revisions and finalized the ELGs on October 18, 1982.
Original source

First public verification: 2026-10-21 15:40

Source published

China's GB 4287-2026 standard requires certain dyeing and finishing facilities to pass a fish embryo toxicity test on treated wastewater, effective Sept. 1 for new facilities and Jan. 1, 2028 for existing ones.

Inspect original excerpt
The country’s new textile discharge standard adds a requirement for certain dyeing and finishing operations to demonstrate that fish embryos can survive exposure to their treated wastewater, introducing a biological check alongside existing chemical limits.. The standard, GB 4287-2026, took effect Sept. 1 for new, rebuilt and expanded facilities. Existing facilities must comply from Jan. 1, 2028, though provincial governments may approve an earlier rollout. Published jointly by China’s Ministry of Ecology and Environment and the State Administration for Market Regulation, it replaces four 2012 standards covering dyeing and finishing, silk reeling, wool and hemp.. The test uses newly fertilized zebrafish eggs exposed for 48 hours to a sample diluted to one-sixth of the test solution. At least 90 percent must survive at approximately 79 degrees Fahrenheit, according to the standard.
Original source

First public verification: Not reported

Comparable water samples

Compare only matching parameter, unit, water stage and scope. Individual facility samples never represent a national average or a continuous water-quality trend.

No group of at least two comparable, reviewed samples is available. Read individual evidence in the published dossiers.

Move from evidence to a treatment discussion

Carry the selected country and industry into your enquiry. Confirm influent conditions, discharge destination and operating scope with the engineering team.

Snapshot scope and provenance
Version
6c6099b5155c80fd06b7485a0d1998a3b34512beb46687e7368389cb9a202c12
Industry classification version
2026-10-15.1
Reviewed foundation version
20261015T105811-e19facf957c3
Observation version
f3b00185eebc1d279f1e637dd9480f751c990bf8c4e90d345a292783595b70f3
Public coverage watermark
caa585bcfe480ae8d1974eb7fe96fa91449ba1f60cae75b9e34a7b75b53d762f
Historical baseline cutoff
Not reported

Only caller-frozen public records are counted. Language versions and revisions share a record identity; source versions share the independent source identity.

Go deeper into a country.

Read local study samples, treatment research and published standard documents with their sources. Compare country dossiers or explore the equipment connected to each process.

News observations are separate from verified engineering facts. Published studies and standard documents need their own checks before equipment sizing or a discharge decision.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us