Jordan to present $900M wastewater package in November 2026
Jordan’s Ministry of Water and Irrigation and the Water Authority of Jordan will present a $900 million wastewater-treatment investment package at the Jordan-EU Investment Conference 2026 at the Dead…
Jordan secures $68 million for Al-Shallalah plant upgrade, Nov 2026
Jordan secured a $68 million financing package on 20 November 2026 to rehabilitate and upgrade the Al-Shallalah Wastewater Treatment Plant. The project combines a $55 million concessional EBRD loan w…
SUEZ breaks ground on Jordan desalination plant, Nov 2026
SUEZ announced the groundbreaking for the Aqaba-Amman desalination plant in Jordan on 20 November 2026, marking the start of a four-year construction programme. The reported 851,000 cubic meters per …
Jordan funds Shallala wastewater plant upgrade, November 2026
On 20 November 2026, the EBRD reported financing from the EBRD and the European Union for the rehabilitation, upgrade and expansion of Jordan’s Shallala wastewater treatment plant. The package includ…
Amman Trade Wastewater Treatment for High-COD Effluent
See how Amman manufacturers characterize, pretreat and reduce high-COD trade waste in 2026, with practical DAF and biological treatment guidance.
Data Center Blowdown Treatment in Irbid: 2026 Guide
Evaluate wastewater and cooling blowdown treatment for an Irbid data center, including process selection, recovery targets, costs and compliance risks.
Wastewater and Cooling Blowdown Treatment in Zarqa, Jordan 2026
Get a 2026 engineering guide to wastewater and cooling-tower blowdown treatment for data centers in Zarqa, Jordan, including reuse, RO and ZLD.
What Industrial ETP or DAF System Does an Amman Factory Need? 2026
Find the right industrial ETP or DAF system for an Amman factory in 2026, with sizing criteria, treatment options and compliance questions.
What Packaged Sewage Treatment Plant Fits Amman Housing? 2026
Compare underground A/O and MBR packaged sewage treatment plants for Amman housing developments, including sizing, reuse targets, costs and permits.
Effluent Treatment Plant in Aqaba: 2026 Buyer’s Guide
Plan an effluent treatment plant in Aqaba with 2026 guidance on process selection, costs, compliance, reuse, sizing, equipment and supplier questions.
Domestic Sewage Treatment in Aqaba: 2026 Buyer’s Guide
Compare domestic sewage treatment systems in Aqaba, including MBR and WSZ options, costs, Aqaba-specific design requirements, compliance and reuse goals.
Effluent Treatment Plant in Irbid: 2026 Industrial Buyer’s Guide
Plan an effluent treatment plant in Irbid with a 2026 guide to wastewater characterization, process selection, equipment, compliance and reuse.
Domestic Sewage Treatment in Irbid: 2026 Buyer’s Guide
Compare decentralized, WSZ package, and MBR sewage treatment options for Irbid developments, with sizing, compliance, and site-selection guidance.
Effluent Treatment Plant in Zarqa: 2026 Buyer’s Guide
Plan an effluent treatment plant in Zarqa with 2026 guidance on process selection, reuse targets, equipment selection, supplier vetting and project risks.
Domestic Sewage Treatment in Zarqa: 2026 Buyer’s Guide
Compare decentralized, WSZ package and MBR options for domestic sewage treatment in Zarqa, with sizing, compliance and reuse guidance.
Effluent Treatment Plant in Amman: 2026 Buyer’s Guide
Plan an effluent treatment plant in Amman with 2026 guidance on wastewater characterization, process selection, compliance, sizing and supplier evaluation.
Domestic Sewage Treatment in Amman: 2026 Buyer’s Guide
Compare decentralized, WSZ package, and MBR systems for domestic sewage treatment in Amman, with Jordan-specific sizing, compliance and reuse insights.
Effluent Treatment Plant in Jordan: 2026 Buyer’s Guide
Plan an effluent treatment plant in Jordan with a practical 2026 guide covering wastewater characterization, process selection, compliance, reuse and equipment sizing.
Rural Sewage Treatment in Jordan: 2026 Buyer’s Guide
Compare rural sewage treatment options in Jordan, including package plants, MBR systems, power needs, sludge risks, sizing, compliance and reuse considerations.
Hotel Resort Wastewater Treatment in Jordan: 2026 Guide
Compare sewage, MBR and package treatment systems for Jordanian hotels and resorts, including reuse, sizing, costs, permits and the Tala Bay benchmark.
Domestic Sewage Treatment in Jordan: 2026 Buyer’s Guide
Compare decentralized, WSZ package, and MBR sewage treatment options for Jordan, with Jordan-specific water, effluent, sizing, and compliance guidance.
Sizing a Containerized MBR STP in Amman, Jordan (2026 Guide)
2026 engineering guide to sizing a containerized MBR STP for residential and camp projects in Amman, Jordan — flow, load, container form factor and reuse targets.
Semiconductor & Data Hall Wastewater in Amman, Jordan (2026 Guide)
2026 engineering guide to handling semiconductor and data hall process wastewater in Amman, Jordan — water-stress context, treatment train, ZLD options and compliance.
How to Choose a Packaged MBR STP for a Hotel in Amman, Jordan (2026 Buyer's Guide)
2026 buyer's guide to packaged MBR STP sizing, compliance and supplier selection for hotels in Amman, Jordan — capacity, reuse and ROI.
Data Center Wastewater & Cooling Blowdown Treatment in Amman, Jordan (2026 Guide)
2026 engineering guide to data center wastewater and cooling blowdown treatment in Amman, Jordan — TDS limits, RO recovery, and ZLD design.
What Wastewater Treatment System Does an Amman Hotel Need in 2026?
Amman hotel wastewater treatment in 2026: process train, Jordan reuse standards, MBR vs activated sludge, costs and a buyer-ready spec sheet for resorts.
Pharmaceutical Wastewater Treatment in Jordan: 2026 Engineering Guide
Pharmaceutical wastewater treatment in Jordan: 2026 process train, JISM discharge limits, MBR/RO costs, and equipment checklist for API and finished-dose plants.
Textile Wastewater Treatment in Jordan (2026 Engineering Guide)
2026 guide to textile wastewater treatment in Jordan: JS 893/2024 limits, DAF+MBR process train, MENA cost benchmarks, and supplier selection criteria.
Residential Wastewater Treatment in Jordan (2026 Engineering Guide)
Residential wastewater treatment in Jordan: 2026 process design, As-Samra reuse model, packaged plant selection, and compliance for off-grid housing.
Hospital Sewage Treatment Plant in Amman, Jordan: 2026 Clinic Buyer's Guide
Choosing a hospital sewage treatment plant for clinics in Amman, Jordan? Compare MBR, ozone and SBR systems against 2026 JISM standards and As-Samra effluent limits.