Mechanical bar screens, rotary drum screens, and pretreatment equipment for removing large debris from wastewater.
Screening & Pretreatment — Equipment
The GX Series Rotary Mechanical Bar Screen is a continuous-duty fine screening system for municipal and industrial wastewater headworks. Featuring stainless steel rake teeth, dual overload protection, and a self-cleaning brush discharge mechanism, it reliably removes suspended solids, rags, plastics, and fibrous debris — protecting downstream pumps, valves, and biological treatment processes.
Bar Screen Aperture, Grit Removal & Channel Hydraulics
Headworks mechanical screening protects downstream pumps, aerators, and membranes from rags, plastics, and abrasive grit. Coarse bar screens (10–25 mm spacing) intercept large debris at 0.6–1.0 m/s channel velocity; fine rotary drum or step screens (1–5 mm) are mandatory ahead of MBBR/MBR systems; aerated grit chambers or vortex separators capture ≥95% of sand ≥0.2 mm.
Applications & Sizing Checklist
Installed at municipal inlets, slaughterhouses, textile dyeing mills, and paper plants. Specify peak wet-weather flow, channel width/depth, discharge height for screenings compactors, and SS304/SS316L corrosion-grade construction.