The European Bank for Reconstruction and Development and the European Union are financing the rehabilitation, upgrade and expansion of the Shallala wastewater treatment plant in northern Jordan, according to an EBRD report published 20 November 2026. The package includes an EBRD sovereign loan of up to $ 55 million (€ 48.9 million) and an EU investment grant of up to €11.4 million.
Key takeaways
- The financing will support a new treatment line, rehabilitation of existing facilities, sludge-management improvements and restoration of compliance with national wastewater-discharge and reuse standards at the Shallala plant EBRD.
- Upgraded treatment capacity is expected to reach 30,500 m³ per day, serving projected wastewater-treatment needs of up to 242,000 people through 2050 EBRD.
- The completed plant is expected to treat approximately 11 million m³ of wastewater annually for agricultural reuse, while its recommissioned biogas-recovery facility is expected to generate approximately 4,000 MWh of renewable energy each year EBRD.
- Veolia separately said its performance-based management contract with the Water Authority of Jordan covers 2026–2030 and is intended to improve water and wastewater network efficiency and service reliability for approximately three million people Fana News -.
What happened
The financing agreement was signed at the Jordan–EU Investment Conference and will support the expansion of the Shallala wastewater treatment plant in northern Jordan EBRD. The sovereign loan will go to the Water Authority of Jordan, while the EU grant will be provided through its Neighbourhood Investment Platform EBRD.
Construction is to be phased to maintain uninterrupted wastewater services during implementation EBRD. Once complete, the upgraded facility is expected to increase treatment capacity to 30,500 m³ per day and meet wastewater-treatment needs for up to 242,000 people through 2050 EBRD.
The work also includes improvements to sludge management, recommissioning of the biogas-recovery facility and restoration of compliance with national discharge and reuse standards EBRD. The plant is expected to treat approximately 11 million m³ of wastewater annually for agricultural reuse; the recommissioned biogas facility is expected to produce approximately 4,000 MWh of renewable energy annually EBRD.
European Commissioner for the Mediterranean Dubravka Suiča said: “Once upgraded, the plant is expected to produce around 8.1 million cubic metres of treated water a year that could be reused in agriculture” EBRD.
Jordan’s wider operating context
Veolia’s performance-based management contract with the Water Authority of Jordan, signed in cooperation with Yarmouk Water Company for 2026–2030, is intended to improve network efficiency and service reliability for approximately three million people Fana News -. The company said its work includes monitoring water losses, detecting leaks and conducting repairs through a dedicated team of more than 45 trained and fully equipped technicians Fana News -.
Philippe Bourdeaux, Veolia’s Senior Executive Vice President for Africa and the Middle East, said long-term investment, public-private cooperation and innovative solutions were needed for efficient use of available resources Fana News -. He also emphasized digital technologies, advanced monitoring and data-driven solutions for detecting operational irregularities and improving operational and energy efficiency Fana News -.
Specification read
The reported post-upgrade capacity is 30,500 m³ per day, or 30.5 MLD, with a stated population equivalent of up to 242,000 people through 2050 EBRD. The reported annual wastewater volume is approximately 11 million m³, while the commissioner separately described expected reusable treated-water production as around 8.1 million cubic metres a year EBRD. The sources do not report the existing flow, design process or current influent and effluent quality values needed to size a plant-specific treatment train.
The project bears directly on capacity expansion and rehabilitation, as well as sludge management, biogas recovery and reuse compliance EBRD. For an equivalent municipal wastewater scope, the evaluation sequence normally moves from screening and primary treatment to biological treatment—such as A2O, MBR, MBBR, SBR or UASB—followed by tertiary treatment and disinfection where required by the reuse standard; DAF or ZLD would depend on the specified solids and water-reuse requirements, which the sources do not report. Operators comparing membrane and municipal wastewater treatment systems can also review Mbr Membrane Systems, while the reported sludge-management work points to the need to assess Sludge Treatment.
If your plant looks like a 30.5 MLD municipal wastewater facility serving up to 242,000 people through 2050, with agricultural reuse, national discharge-and-reuse compliance, sludge handling and biogas recovery in scope, this project shows the importance of matching new treatment capacity, reuse quality and energy recovery to an operating strategy that can maintain service during phased construction.
FAQ
What is the reported capacity and population served by the upgraded Shallala plant?
The upgraded plant is expected to have 30,500 m³ per day of treatment capacity and meet wastewater-treatment needs for up to 242,000 people through 2050 EBRD. The source also reports expected annual treatment of approximately 11 million m³ for agricultural reuse EBRD.
How much funding is available for the Shallala wastewater upgrade?
The package comprises an EBRD sovereign loan of up to $ 55 million (€ 48.9 million) for the Water Authority of Jordan and an EU investment grant of up to €11.4 million through the Neighbourhood Investment Platform EBRD. The sources do not break this funding down by equipment, construction contract or procurement package.
What should a supplier demonstrate for a wastewater expansion involving reuse and sludge?
At minimum, the enquiry should establish the intended treatment capacity, design flow, influent and effluent BOD/COD values, reuse standard, sludge characteristics and energy-recovery arrangement. Those design inputs are not reported for Shallala, so the sources do not support selecting a specific process class or equipment size EBRD.
What delivery and operating conditions are planned?
Construction will be phased to maintain uninterrupted wastewater services, and the technical cooperation package is intended to support project implementation, delivery and human-capital development EBRD. Separately, Veolia’s 2026–2030 performance-based contract focuses on network efficiency, leak detection, repairs and service reliability for approximately three million people Fana News -.