Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Textile wastewater
in Bangladesh.

A country guide library connected to local research samples, published standards, treatment evidence and equipment.

5 textile guidesWithin 54 country guidesExplore textile across countries →

Latest sourced developments

Source record updated: —

AI briefs of source reports; these do not replace measured influent or applicable discharge permits.

No source-bound news updates are available for this country and industry.

Process. Problem. Treatment.

Select a process or connection to inspect its meaning and the limits of the evidence.

WET PROCESSESWASTEWATERTREATMENT RESEARCHDesizing is a wet-processing step of textile manufacturingBleaching is a wet-processing step of textile manufacturingMercerizing is a wet-processing step of textile manufacturingDyeing is a wet-processing step of textile manufacturingPrinting is a wet-processing step of textile manufacturingDyeing effluent carries residual dyestuff and visible colourDyeing effluent carries high COD loadAdvanced oxidation removes colour and COD from dyeing effluentAdvanced oxidation reduces COD in dyeing effluentTextile & dyeingTextile & dyeingINDUSTRYDesizingDesizingWET PROCESSBleachingBleachingWET PROCESSMercerizingMercerizingWET PROCESSDyeingDyeingWET PROCESSPrintingPrintingWET PROCESSColour & dyesColour & dyesWASTEWATERCOD loadCOD loadWASTEWATERAdvanced oxidationOzone / FentonRESEARCH
Reviewed research relationshipsNot a site-specific treatment design

Observed raw wastewater

Published study samples, not national design ranges.

Sample / locationpHCODBOD5TSSTDS
RMG-1Kashimpur, Gazipur8.56 ± 0.031130 ± 26.65340 ± 14.42244 ± 17.783845 ± 30.41
RMG-2Shreepur, Gazipur7.94 ± 0.031044 ± 17.78336 ± 6.65146 ± 5.54228 ± 26.68
RMG-3Nabinagar, Savar8.75 ± 0.031315 ± 18.14425 ± 6.02158 ± 6.023228 ± 36.85
RMG-4Nabinagar, Savar8.05 ± 0.011420 ± 20.29316 ± 9.07262 ± 11.713928 ± 32.14
RMG-5Fatullah, Narayanganj7.48 ± 0.03972 ± 7.21298 ± 14.57115 ± 7.022774 ± 24.33
RMG-6Fatullah, Narayanganj7.84 ± 0.061200 ± 8.14276 ± 19.85180 ± 9.713450 ± 31.62

mg/L except pH. Sampling: 2017-07 (mid-July). Publication year: 2018.

Reported value ± an undefined uncertainty term; SD/SE and field replicate count not specified

Investigation of Waste Water Quality Parameters Discharged from Textile Manufacturing Industries of Bangladesh

Original source table: RMG-1; pH = 8.56 ± 0.03

Original source table: RMG-1; BOD5 = 340 ± 14.42

Original source table: RMG-1; COD = 1130 ± 26.65

Original source table: RMG-1; TDS = 3845 ± 30.41

Original source table: RMG-1; TSS = 244 ± 17.78

Original source table: RMG-2; pH = 7.94 ± 0.03

Original source table: RMG-2; BOD5 = 336 ± 6.65

Original source table: RMG-2; COD = 1044 ± 17.78

Original source table: RMG-2; TDS = 4228 ± 26.68

Original source table: RMG-2; TSS = 146 ± 5.5

Original source table: RMG-3; pH = 8.75 ± 0.03

Original source table: RMG-3; BOD5 = 425 ± 6.02

Original source table: RMG-3; COD = 1315 ± 18.14

Original source table: RMG-3; TDS = 3228 ± 36.85

Original source table: RMG-3; TSS = 158 ± 6.02

Original source table: RMG-4; pH = 8.05 ± 0.01

Original source table: RMG-4; BOD5 = 316 ± 9.07

Original source table: RMG-4; COD = 1420 ± 20.29

Original source table: RMG-4; TDS = 3928 ± 32.14

Original source table: RMG-4; TSS = 262 ± 11.71

Original source table: RMG-5; pH = 7.48 ± 0.03

Original source table: RMG-5; BOD5 = 298 ± 14.57

Original source table: RMG-5; COD = 972 ± 7.21

Original source table: RMG-5; TDS = 2774 ± 24.33

Original source table: RMG-5; TSS = 115 ± 7.02

Original source table: RMG-6; pH = 7.84 ± 0.06

Original source table: RMG-6; BOD5 = 276 ± 19.85

Original source table: RMG-6; COD = 1200 ± 8.14

Original source table: RMG-6; TDS = 3450 ± 31.62

Original source table: RMG-6; TSS = 180 ± 9.71

Read original source ↗

Reviewed 2026-10-14

Country-specific measurements; verify your own influent before design.

Published standards reference

Bangladesh ECR 2023 · Schedule 5 §2

Textile washing, dyeing and printing. Schedule 5 sector-specific values; do not substitute the Schedule 4 general industrial table.

ParameterTextile industrial effluent
BOD5≤ 30 mg/L
COD≤ 200 mg/L
Colour≤ 150 Hazen (Pt-Co)
Oil and grease≤ 10 mg/L
TDS≤ 2100 mg/L
TSS≤ 100 mg/L
pH6–9

TDS limit does not apply to discharge to sea water.

Rule 40 repeals the 1997 Rules subject to savings; the study's 1997 comparison column is not used as the current standard.

Gazette publication date: 2023-03-05. Rule 1(2): immediate commencement; date anchor not adjudicated.

Published reference values; confirm your local permit and discharge route.

Bangladesh Environmental Conservation Rules 2023, official Gazette

Schedule 5 §2 Textile, Gazette pp3071–3072/PDF pp63–64; Rules 1(2),32,40

Read original source ↗

Reported results,
with their conditions.

Ozonation–Fenton treatment in an optimised laboratory experiment on real textile dyeing effluent.

Shared global literature. These results are not local full-scale performance guarantees.

ParameterReported valueConditions
Colour removal89.17 %RSM-optimised ozonation-Fenton on real textile dyeing effluent (lab)
COD removal82.52 %Same experiment as colour removal
COD and color removal from real textile dyeing effluent using ...

…optimum RSM-predicted color and COD removal efficiencies of 89.17%, and 82.52%…

Same experiment: COD removal 82.52%

Read original source ↗

Reviewed 2026-10-13

Explore the equipment.

Catalogue equipment is engineering context, not a site-specific selection. Provide your actual flow and influent.

Before you specify
a treatment system.

Discuss your wastewater →

All Bangladesh guides →

Which local textile wastewater samples are documented?

Six factory ETP-inlet samples from Gazipur, Savar and Narayanganj were collected in mid-July 2017 and published in 2018. Only before-treatment values are shown. The reported uncertainty term is preserved without assuming SD or SE.

Which discharge standard is shown?

The page shows the textile washing, dyeing and printing table in Bangladesh Environmental Conservation Rules 2023, Schedule 5 section 2. The TDS footnote excludes discharge to sea water. The Gazette was published on 5 March 2023; Rule 1(2) states immediate commencement.

Can these sample values determine my equipment size?

No. Published samples establish context, not your site design basis. Provide actual flow, measured influent, operating variability and the applicable discharge or reuse target.

Library snapshot 2026-10-13 · Research release 20261014T184750-fff2d02345ed

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us