China is covered by 104 guides on this site — most recently updated Nov 21, 2026. Each guide combines local discharge standards, engineering specs and cost benchmarks for industrial and municipal wastewater projects.
Kowloon Hotel Wastewater: A/O, MBR or DAF?
Choose A/O, MBR or DAF treatment for a Kowloon hotel using room count, peak flow, FOG load, reuse needs and sludge requirements.
Taichung Hotel Wastewater: A/O Package Plant vs. MBR
Compare A/O package plants and MBR systems for a Taichung hotel using flow, footprint, reuse, automation and sizing inputs.
WSZ, MBR or DAF-MBR for a New Territories Hotel?
Choose and size a compliant wastewater treatment train for a New Territories hotel using room count, flow, FOG, reuse and discharge criteria.
A/O Package Plant or MBR for a New Taipei Hotel?
Compare A/O package plants and MBR systems for a New Taipei hotel using flow, pretreatment, footprint and reuse criteria.
Banqiao Data Center Blowdown Treatment: UF–RO Sizing Guide
Select and size UF, RO and optional polishing for Banqiao cooling blowdown using a site-data, treatment-train and compliance decision matrix.
Hong Kong High-COD Trade Wastewater Treatment Guide 2026
Learn how Hong Kong manufacturers characterize, pretreat and reduce high-COD trade effluent while managing trade effluent surcharge and compliance risk.
How Semiconductor Plants Near Tianjin Meet Sewer Limits in 2026
See how Tianjin semiconductor plants characterize wastewater, control arsenic and fluoride, and verify pretreatment before sewer discharge in 2026.
China’s water technology exports advance in November 2026
Chinese water-technology exports gained momentum in a report published on 12 November 2026, with exports of water-filtering and purifying machinery reaching approximately $2.05 billion in 2025, aroun…
What Wastewater Treatment System Does a Taipei Hotel Need in 2026?
Compare A/O package plants, MBR systems, pretreatment and disinfection for Taipei hotels and resorts, with capacity, process and compliance guidance.
What Wastewater and Cooling Blowdown Treatment Does a Macau Data Center Need?
A 2026 engineering guide to wastewater and cooling blowdown treatment for Macau data centers, covering streams, pretreatment, reuse and compliance risks.
What Industrial ETP or DAF System Does a Taipei Factory Need? 2026
Determine whether a Taipei factory needs an ETP, DAF, or combined wastewater system using flow, wastewater, reuse, and compliance criteria in this 2026 guide.
What Industrial ETP or DAF System Does a Kaohsiung Factory Need? 2026
Determine whether your Kaohsiung factory needs an ETP or DAF system, including process fit, sizing inputs, compliance checks and equipment selection.
What Packaged Sewage Treatment Plant Fits Taipei Housing? 2026
Compare buried A/O, MBR and modular package plants for Taipei housing developments, including capacity, effluent, site and compliance considerations.
What Packaged Sewage Treatment Plant Fits Kaohsiung Housing? 2026
Compare buried A/O, MBR, and packaged sewage plants for Kaohsiung housing developments, with sizing, siting, reuse, and compliance guidance.
China tightens textile wastewater rules, Oct 2026
In a report published on 19 October 2026, Knitting Industry reported that China’s GB 4287-2026 standard requires applicable textile dyeing and finishing plants to test treated effluent for fish embry…
What Industrial ETP or DAF System Does a Hong Kong Factory Need? 2026
Determine the right industrial ETP or DAF system for a Hong Kong factory using wastewater characteristics, peak flow, treatment goals and compliance risks.
What Packaged Sewage Treatment Plant Fits a Hong Kong Housing Development?
Find the packaged sewage treatment plant for a Hong Kong housing development using flow, population, site, discharge and phased-occupancy criteria.
Hong Kong Island Data Center Wastewater & Cooling Blowdown Treatment 2026
2026 engineering guide to data center wastewater and cooling tower blowdown treatment on Hong Kong Island — water profile, RO sizing and reuse options.
How to Size a Containerized MBR STP in Taipei, Taiwan (2026 Guide)
2026 engineering guide to sizing a containerized MBR STP for residential or camp projects in Taipei, covering flow, peak factor, and ISO container capacity.
How to Size a Containerized MBR STP in Kaohsiung, Taiwan (2026 Guide)
Step-by-step 2026 engineering guide to sizing a containerized MBR STP in Kaohsiung for residential and camp projects — flow, peak factor, footprint, and compliance.
Chinese textile wastewater crackdown cut COD limit to 100 mg/L, study shows, Oct 2026
On 7 October 2026, The Conversation published an analysis of how Chinese textile exporters in Jiangsu responded to two rounds of tighter wastewater standards around Lake Tai. The 2005 rule cut the pe…
China study: advanced wastewater polishing raises anti-androgen activity, October 2026
On 7 October 2026, Bioengineer.org reported a study from the Chinese Academy of Sciences showing that UV, ozone and biological activated carbon polishing at a Tianjin wastewater plant suppressed estr…
China adds fish embryo toxicity test to textile wastewater standard, Oct 2026
A report published 8 October 2026 says China has folded a fish embryo survival test into its new textile wastewater discharge standard, GB 4287-2026, which took effect 1 September for new, rebuilt an…
Data Center Wastewater & Cooling Blowdown Treatment in Tainan, Taiwan (2026 Guide)
2026 engineering guide to Tainan data center wastewater and cooling blowdown treatment: climate sizing, COC, RO/MVC trains, CAPEX/OPEX, and EIA consent.
Data Center Wastewater & Cooling Blowdown Treatment in Kowloon, Hong Kong (2026 Guide)
2026 engineering guide to wastewater and cooling blowdown treatment for data centers in Kowloon, Hong Kong — treatment trains, reuse, and compliance.
Sizing a Containerized MBR STP for Hong Kong Residential & Camp Projects (2026 Guide)
2026 engineering guide to sizing a containerized MBR STP for Hong Kong residential estates and camps — flows, peaks, container selection and compliance.
Data Center Cooling Blowdown Treatment in Taichung, Taiwan: 2026 Engineering Guide
2026 engineering guide to data center cooling blowdown and wastewater treatment in Taichung, Taiwan — climate-driven sizing, consent limits, process train, and reuse train.
Data Center Cooling Blowdown Treatment in New Territories, Hong Kong (2026 Engineering Guide)
2026 engineering guide to data center cooling blowdown and wastewater treatment in the New Territories: cycles of concentration, discharge limits, reuse train and supplier checklist.
Data Center Cooling Blowdown Treatment in New Taipei City 2026
2026 engineering guide to data center cooling blowdown and wastewater treatment in New Taipei City, Taiwan — process train, Taiwan EPA rules, costs, and reuse targets.
Shanghai QILEE to showcase containerized wastewater systems at Aquatech China 2026
Shanghai QILEE Environmental Protection Equipment Co., Ltd. announced on 28 September 2026 that it will exhibit containerized water treatment systems at Aquatech China 2026 from 28 to 30 October 2026…