Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Wastewater Treatment in China

China is covered by 104 guides on this site — most recently updated Nov 21, 2026. Each guide combines local discharge standards, engineering specs and cost benchmarks for industrial and municipal wastewater projects.

Semiconductor & Data Hall Process Wastewater in Hong Kong (2026 Engineering Guide)

Published: Oct 4, 2026

2026 engineering guide to handling semiconductor and data hall process wastewater in Hong Kong — water volumes, contaminants, compliance, and treatment train design.

Semiconductor & Data Hall Process Wastewater in Hong Kong (2026 Engineering Guide)

Small Community Wastewater System in Taiwan: 2026 Engineering Guide

Published: Oct 3, 2026

2026 engineering guide to small community wastewater systems in Taiwan: EPA effluent limits, WSZ vs MBR sizing, typhoon-ready design, and compliance costs.

Small Community Wastewater System in Taiwan: 2026 Engineering Guide

How to Choose a Packaged MBR STP for a Hotel in Taipei (2026 Guide)

Published: Sep 29, 2026

2026 buyer's guide to packaged MBR STP for Taipei hotels: Taiwan EPA limits, sizing for occupancy, MBR vs SBR, costs, and supplier checklist.

How to Choose a Packaged MBR STP for a Hotel in Taipei (2026 Guide)

How to Choose a Packaged MBR STP for a Hotel in Kaohsiung, Taiwan (2026 Guide)

Published: Sep 29, 2026

Pick the right packaged MBR STP for a Kaohsiung hotel: sizing, Taiwan EPA effluent rules, membrane choice, and 2026 cost benchmarks for 50–500-key properties.

How to Choose a Packaged MBR STP for a Hotel in Kaohsiung, Taiwan (2026 Guide)

Data Center Cooling Blowdown Treatment in Taipei: 2026 Engineering Guide

Published: Sep 27, 2026

Taipei data center cooling blowdown treatment in 2026 — process train, equipment selection, Taiwan EPA permit limits, and ZLD economics for tropical high-density sites.

Data Center Cooling Blowdown Treatment in Taipei: 2026 Engineering Guide

Data Center Wastewater & Cooling Blowdown Treatment in Kaohsiung, Taiwan (2026 Guide)

Published: Sep 27, 2026

2026 engineering guide for data center cooling blowdown and wastewater treatment in Kaohsiung, Taiwan — process trains, permit limits, and reuse options.

Data Center Wastewater & Cooling Blowdown Treatment in Kaohsiung, Taiwan (2026 Guide)

How to Choose a Packaged MBR STP for a Hong Kong Hotel (2026 Guide)

Published: Sep 23, 2026

2026 buyer's guide to packaged MBR STP for Hong Kong hotels: sizing, discharge limits, PVDF vs hollow fiber, and reuse options explained.

How to Choose a Packaged MBR STP for a Hong Kong Hotel (2026 Guide)

Data Center Cooling Blowdown Treatment in Hong Kong: 2026 Engineering Guide

Published: Sep 21, 2026

How Hong Kong data centers treat cooling tower blowdown in 2026: cycles of concentration, discharge rules, RO reuse trains and ZLD options for water-scarce sites.

Data Center Cooling Blowdown Treatment in Hong Kong: 2026 Engineering Guide

Sinou launches CO₂-carbonation wastewater system for concrete batching plants in Zhejiang, Sept 2026

Published: Sep 15, 2026

On 8 September 2026, Zhejiang Sinou Environmental Protection Equipment Co., Ltd. released details of its fully automated CO₂-carbonation wastewater treatment system for concrete batching plants, with…

Sinou launches CO₂-carbonation wastewater system for concrete batching plants in Zhejiang, Sept 2026

Does WuXi AppTec's CDMO Campus Expansion Trigger ZLD or High-Recovery RO? (2026 Analysis)

Published: Sep 1, 2026

2026 engineering analysis of whether WuXi AppTec's CDMO expansion forces ZLD vs high-recovery RO — covers API strength, brine volumes, and hybrid MLD options.

Does WuXi AppTec's CDMO Campus Expansion Trigger ZLD or High-Recovery RO? (2026 Analysis)

CASS Process Capacity & Sizing: 2026 Design Guide with Parameter Tables & China Standards

Published: Aug 30, 2026

Master CASS process sizing with 2026 design parameters, hydraulic/organic loading tables, cycle-time calculations, and GB 18918-2002 Grade 1A compliance data for 2,000–100,000 m³/d plants.

CASS Process Capacity & Sizing: 2026 Design Guide with Parameter Tables & China Standards

Pharmaceutical Wastewater Treatment in Taiwan: 2026 Regulatory Guide & Technology Selection

Published: Aug 30, 2026

Engineering guide to Taiwan's pharmaceutical wastewater regulations, treatment technologies, and equipment selection for 2026 compliance. Includes effluent standards, process flows, and CAPEX/OPEX be…

Pharmaceutical Wastewater Treatment in Taiwan: 2026 Regulatory Guide & Technology Selection

Textile Wastewater Treatment in Taiwan: 2026 Technology Guide & Compliance Roadmap

Published: Aug 30, 2026

Engineering guide to textile wastewater treatment in Taiwan: MBR vs DAF vs RO selection, EPA discharge standards, water reuse drivers, and equipment sizing for dyeing/finishing plants.

Textile Wastewater Treatment in Taiwan: 2026 Technology Guide & Compliance Roadmap

Residential Wastewater Treatment in Taiwan 2026: Regulations, Technologies & Equipment Selection Guide

Published: Aug 30, 2026

Complete 2026 engineering guide to residential wastewater treatment in Taiwan: EPA discharge standards, septic-to-sewer transition, MBR vs package plant comparison, and equipment specs for developers.

Residential Wastewater Treatment in Taiwan 2026: Regulations, Technologies & Equipment Selection Guide

AOP System for Pesticide Wastewater: 2026 Selection Guide, Process Train & China Compliance

Published: Aug 30, 2026

Engineering guide to selecting AOP systems for pesticide wastewater: technology comparison by compound class, process flow with DAF/MBR/RO, pilot protocols, and GB discharge standards.

AOP System for Pesticide Wastewater: 2026 Selection Guide, Process Train & China Compliance

What Wastewater System Does a Kaohsiung Hotel Need in 2026?

Published: Aug 27, 2026

2026 engineering guide to wastewater treatment for Kaohsiung hotels and resorts — Taiwan EPA discharge limits, system sizing, costs, and MBR vs package plant comparison.

What Wastewater System Does a Kaohsiung Hotel Need in 2026?

What Wastewater Treatment System Does a Hong Kong Hotel Need in 2026?

Published: Aug 24, 2026

Complete 2026 engineering guide to hotel & resort wastewater treatment in Hong Kong — process selection, compliance with the T·PARK sludge chain, and packaged plant specs.

What Wastewater Treatment System Does a Hong Kong Hotel Need in 2026?

BYD EV Plant Expansion: ZLD or High-Recovery RO in 2026?

Published: Aug 19, 2026

Does BYD's 2026 EV plant expansion trigger ZLD or high-recovery RO? Engineering criteria, recovery rates, and discharge rules explained for gigafactory water reuse.

BYD EV Plant Expansion: ZLD or High-Recovery RO in 2026?

How TSMC Treats Wastewater at Its Fab Plants (2026 Process Guide)

Published: Aug 19, 2026

Inside TSMC's fab wastewater treatment: 67,000-ton Tainan reuse plant, fab water sources, treatment train, and the recovery numbers behind chipmaking.

How TSMC Treats Wastewater at Its Fab Plants (2026 Process Guide)

Pollutant Discharge Permit (排污许可) Amendments for Dyeing Capacity Expansion in China: 2026 Compliance Guide

Published: Aug 13, 2026

Step-by-step guide to 2026 排污许可 (pollutant discharge permit) amendments required when a Chinese listed manufacturer expands dyeing and finishing capacity.

Pollutant Discharge Permit (排污许可) Amendments for Dyeing Capacity Expansion in China: 2026 Compliance Guide

GB 8978 Effluent Standard: 2026 Compliance & Treatment Guide

Published: Aug 11, 2026

GB 8978 effluent standard explained for 2026: class 1/2/3 limits, 69 pollutant parameters, supersession status, and how to engineer treatment trains to meet them.

GB 8978 Effluent Standard: 2026 Compliance & Treatment Guide

Chinese Wastewater Equipment Manufacturer Reliability: 2026 Buyer's Guide

Published: Aug 6, 2026

How reliable are Chinese wastewater equipment manufacturers in 2026? Compare ISO/CE certifications, MTBF data, QA processes, and red flags before you buy.

Chinese Wastewater Equipment Manufacturer Reliability: 2026 Buyer's Guide

Hospital Wastewater Treatment in Kaohsiung: 2026 Compliance & Engineering Guide

Published: Jul 29, 2026

Hospital wastewater treatment in Kaohsiung — Taiwan EPA effluent limits, MBR + ClO2 process design, 2026 cost data, and equipment selection for medical facilities.

Hospital Wastewater Treatment in Kaohsiung: 2026 Compliance & Engineering Guide

Chromium Discharge Limit 2026: EPA, EU & China Standards with Zero-Risk Compliance Guide

Published: Jul 22, 2026

2026 chromium discharge limits for industrial wastewater: EPA 0.1 mg/L total Cr, 0.05 mg/L Cr(VI); EU BAT-AEL 0.05–0.2 mg/L; China GB 21900-2008 0.5 mg/L. Avoid fines with engineering specs, cost mod…

Chromium Discharge Limit 2026: EPA, EU & China Standards with Zero-Risk Compliance Guide

Oil and Grease Discharge Limit 2026: EPA, EU & China Standards

Published: Jul 21, 2026

Oil and grease discharge limits for 2026: EPA, EU, China GB and POTW thresholds, FOG pretreatment methods, DAF design specs, and compliance checklist.

Oil and Grease Discharge Limit 2026: EPA, EU & China Standards

Kaohsiung Wastewater Treatment Plant Cost 2026: CAPEX, OPEX & Tech-Specific Breakdown for Industrial Buyers

Published: Jul 7, 2026

Discover 2026 wastewater treatment plant costs in Kaohsiung—detailed CAPEX (NT$50M–NT$2B), OPEX (NT$0.8–NT$3.5/m³), and tech-specific cost drivers for industrial buyers.

Kaohsiung Wastewater Treatment Plant Cost 2026: CAPEX, OPEX & Tech-Specific Breakdown for Industrial Buyers

Taichung Industrial Wastewater Engineering Specs 2026

Published: Jul 5, 2026

Taichung factory wastewater systems often design to COD <100 mg/L, BOD <30 mg/L, and TSS <30 mg/L under MOENV industry tables amended 18 Dec 2024. CAPEX runs about $50K for a 20 m³/day DAF unit to $1…

Taichung Industrial Wastewater Engineering Specs 2026

Wastewater Treatment Plant Cost in Taiwan 2026: CAPEX, OPEX & Tech-Specific Breakdown for Industrial Buyers

Published: Jul 2, 2026

Discover 2025 wastewater treatment plant costs in Taiwan—detailed CAPEX (NT$15M–NT$500M), OPEX (NT$1.8–11.46/m³), and tech-specific cost models for MBR, DAF, and RO systems.

Wastewater Treatment Plant Cost in Taiwan 2026: CAPEX, OPEX & Tech-Specific Breakdown for Industrial Buyers

Electroplating Wastewater Treatment System: 2026 Engineering Specs, Zero-Discharge Designs & China Compliance Guide

Published: Jul 1, 2026

Discover 2025 engineering specs for electroplating wastewater treatment systems: hybrid DAF-RO-MBR designs, heavy metal removal rates, China's 13th Five-Year Plan compliance, and zero-discharge CAPEX…

Electroplating Wastewater Treatment System: 2026 Engineering Specs, Zero-Discharge Designs & China Compliance Guide

Kaohsiung Industrial Wastewater Treatment: Specs, Costs & Compliance

Published: Jun 29, 2026

Kaohsiung factories sizing treatment trains for 2026 still design to COD <100 mg/L, BOD <30 mg/L, TSS <30 mg/L, and pH 6–9 for many cases under Taiwan’s Effluent Standards (amended 18 Dec 2024). EDR …

Kaohsiung Industrial Wastewater Treatment: Specs, Costs & Compliance
Request a Wastewater Treatment Quote
AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us