Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation
Industry News

Shanghai QILEE to showcase containerized wastewater systems at Aquatech China 2026

Shanghai QILEE to showcase containerized wastewater systems at Aquatech China 2026

Shanghai QILEE Environmental Protection Equipment Co., Ltd. announced on 28 September 2026 that it will exhibit its containerized water treatment systems at Aquatech China 2026, scheduled for 28-30 October 2026 at the Shanghai New International Expo Centre in Pudong New Area, Shanghai (FinancialContent; StreetInsider). The company will operate from Booth E6B33 in Halls E5-E7, presenting modular systems aimed at municipal and industrial wastewater buyers.

Key takeaways

  • Aquatech China 2026 runs 28-30 October 2026 at the Shanghai New International Expo Centre, 2345 Longyang Road, Pudong (FinancialContent).
  • QILEE will staff Booth E6B33, targeting municipal and industrial wastewater buyers plus overseas project managers in Southeast Asia, the Middle East, South Asia and Africa (StreetInsider).
  • Featured systems include containerized UF, containerized RO, seawater desalination, integrated MBR sewage treatment, and a containerized industrial wastewater treatment plant (FinancialContent).
  • QILEE markets its systems as plug-and-play, factory-pre-integrated units that require no complex civil works and can begin operation immediately on delivery (StreetInsider).
  • The company reports 20 years of operation, 34 industry patents and more than 5,000 completed projects across more than 50 countries (FinancialContent).

What happened

Booth and audience

The Shanghai-based manufacturer will present engineered and modular water treatment equipment to domestic professionals in municipal and industrial environmental protection, alongside international buyers focused on Southeast Asia, the Middle East, South Asia and Africa (FinancialContent). The booth programme mirrors that brief: containerized UF and RO skids, a seawater desalination unit, an integrated boiler demineralized water system, an integrated deammoniation system and an integrated sewage treatment system using MBR (StreetInsider).

Heavy-industry and component displays

For complex duty, QILEE will highlight a containerized industrial wastewater treatment plant and a containerized physico-chemical integrated water treatment system (FinancialContent). Component-level exhibits will include tubular membranes, bio-media and fillers, dissolved air flotation (DAF) units, fully automatic chemical dosing systems, evaporators, and fluid separation equipment (StreetInsider).

Delivery model and company track record

The pitch to operators is speed: factory-pre-integrated, tested and containerized systems intended to cut on-site construction time and start up without complex civil works (FinancialContent). QILEE positions itself as a turnkey provider covering R&D, custom design, factory assembly and on-site commissioning, citing 20 years in operation, 34 patents and more than 5,000 completed projects across more than 50 countries (StreetInsider).

Specification read

The supplied sources do not report a flow rate, BOD or COD figure, or a population-equivalent for any of the systems QILEE is bringing to Aquatech China 2026, so the plant-scale buyer input that would normally anchor a sizing read is not available; the relevant scale signal in the source is project count, with the company reporting more than 5,000 completed projects worldwide over 20 years (FinancialContent). For a containerized industrial wastewater treatment plant of this class, the expected treatment train runs screening and equalization, primary clarification or DAF for oil and suspended solids reduction, biological treatment (MBBR, SBR or A2O depending on influent), MBR or tertiary filtration for solids polishing, and RO or physico-chemical polishing where reuse or discharge limits demand it; the systems QILEE lists map to the MBR biological stage, the RO and UF membrane stages, and the DAF physico-chemical stage, so the Aquatech booth covers the biological, tertiary and reuse ends of the train in a single skid (StreetInsider). If your plant needs a packaged biological and membrane step that can be lifted into place on an industrial or remote site without major civil works, this booth is the procurement event to attend in person; the Water Purification and Municipal product lines sit closest to the MBR and RO skids on show, while a packaged industrial train selection can be cross-checked against our Package Wastewater Treatment Plants in Ethiopia: 2026 Engineering Guide with Costs, Compliance & Local Supplier Checklist and the lifecycle-cost comparison in Off-Site Membrane Cleaning vs Replacement: 2026 Cost Guide. For decentralized lift or pump skids that often feed a containerized treatment line, see Packaged vs Custom Municipal Wastewater Lift Station: 2026 Selection Guide.

FAQ

When and where is QILEE exhibiting at Aquatech China 2026?

Booth E6B33 at the Shanghai New International Expo Centre, Halls E5-E7, 2345 Longyang Road, Pudong New Area, from 28 to 30 October 2026 (FinancialContent).

Which QILEE systems are aimed at industrial wastewater duty?

The containerized industrial wastewater treatment plant and the containerized physico-chemical integrated water treatment system, supported by DAF units, tubular membranes, chemical dosing, evaporators and fluid separation equipment (StreetInsider).

How fast can a QILEE system be deployed on site?

The supplied sources describe the systems as factory-pre-integrated, tested, containerized units that avoid complex civil works and can begin operation immediately on delivery; the announcements do not report a specific installation lead time in days or weeks (FinancialContent).

What track record does QILEE cite for buyers shortlisting the supplier?

More than 20 years of operation, 34 industry patents and more than 5,000 completed projects across more than 50 countries (StreetInsider).

References

  1. Shanghai QILEE to Present Containerized Water Treatment Systems at Aquatech China 2026
  2. Shanghai QILEE to Present Containerized Water Treatment Systems at Aquatech China 2026

Related Articles

Packaged vs Custom Municipal Wastewater Lift Station: 2026 Selection Guide
Oct 6, 2026

Packaged vs Custom Municipal Wastewater Lift Station: 2026 Selection Guide

Packaged vs custom municipal wastewater lift station: 7 engineering factors — flow, head, solids, b…

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us