Integrated Water Purification System (JY Series)
JY series all-in-one water purification system integrates coagulation, flocculation, sedimentation, filtration, and automatic backwash in a single compact unit. Fully automatic operation treats surface water with turbidity up to 3,000 mg/L to below 3 mg/L. Ideal for rural water supply, small towns, industrial process water, and mine water treatment with capacities from 10 to 200 m³/h.
Multi-Media Filter for Water Treatment
HydropureWater multi-media filters remove suspended solids, turbidity, and colloidal matter from raw water, achieving SDI values suitable for downstream RO membrane protection. Robust, low-maintenance vessels with long-life filter media and automated backwash.