Saudi Arabia is covered by 141 guides on this site — most recently updated Nov 20, 2026. Each guide combines local discharge standards, engineering specs and cost benchmarks for industrial and municipal wastewater projects.
NuRain wastewater unit reaches full scale in Saudi Arabia, Nov 2026
On 17 November 2026, TechRound reported that Saudi Arabian startup NuRain had installed its mobile, modular wastewater treatment unit at the National Water Company’s Rabigh plant. The system combines…
Saudi desalination order cancelled as water gap narrows, Nov 2026
A report published on 19 November 2026 found that Saudi Arabia narrowed its national water deficit from 18,458 million cubic meters in 2014 to 8,127 million cubic meters in 2023, supported by desalin…
SHARAKAT advances Saudi PPP water procurement, November 2026
In a report published 16 November 2026, SHARAKAT described Saudi Arabia’s shift toward competitive public-private partnerships for water infrastructure, covering wastewater treatment, transmission, s…
MBR Plant Cost in Saudi Arabia: What Drives the Quotation?
Compare MBR and centralized wastewater options in Saudi Arabia and learn which design, capacity and site inputs to include in your supplier RFQ.
Wastewater and Cooling Blowdown Treatment for Ha'il Data Centers
Engineering guidance for Ha'il data centers comparing wastewater, cooling-blowdown, UF and RO treatment, reuse, sizing and discharge risks.
What Wastewater System Does a Riyadh Hotel Need in 2026?
Compare A/O package plants, MBR systems and wastewater pretreatment for Riyadh hotels and resorts, with sizing, discharge and procurement guidance.
What Wastewater System Does a Jeddah Hotel Need in 2026?
Compare A/O package plants, MBR systems and pretreatment for Jeddah hotels and resorts, with sizing inputs, reuse options and 2026 guidance.
Hotel Wastewater Treatment System in Dammam: 2026 Guide
Find the right wastewater treatment system for a Dammam hotel or resort in 2026, with sizing, pretreatment, reuse and compliance guidance.
What Wastewater and Cooling Blowdown Treatment Does a Data Center in Tabuk, Saudi Arabia Need? 2026
Engineering guide for Tabuk data center cooling blowdown & wastewater treatment: Saudi regulations, water scarcity constraints, equipment sizing, and ROI with 2027 tariff impacts.
Saudi Arabia awards Package 12 sewage scheme, October 2026
A MEED report published on 31 October 2026 says Saudi Arabia’s National Water Company awarded local contractor Al-Yamama Package 12 of its long-term operations and maintenance sewage programme. The w…
Saudi Arabia sets wastewater tariffs from January 2027
Saudi Arabia’s National Water Company announced revised residential, non-residential and government wastewater tariffs on 31 October, ahead of their scheduled implementation on 1 January 2027. Consum…
What Wastewater and Cooling Blowdown Treatment Does a Ta'if Data Center Need? 2026
2026 engineering guide for wastewater and cooling blowdown treatment at a Ta'if data center, covering process trains, sizing inputs, reuse and compliance.
Data Center Wastewater Treatment in Buraydah: 2026 Guide
Learn what wastewater and cooling-blowdown treatment a Buraydah data center needs in 2026, including process design, reuse options and compliance steps.
Industrial ETP or DAF System for Riyadh Factories: 2026 Guide
Determine whether a Riyadh factory needs DAF or a full ETP using wastewater data, discharge limits, reuse targets and process-duty criteria.
Industrial ETP or DAF System for a Jeddah Factory: 2026 Guide
Choose an industrial ETP or DAF system for a Jeddah factory using wastewater data, peak flow, discharge targets and treatment-scope criteria.
What Industrial ETP or DAF System Does a Dammam Factory Need? 2026
Select an industrial ETP or DAF system for a Dammam factory using effluent data, Saudi discharge targets, reuse goals and process-fit criteria.
What Packaged Sewage Treatment Plant Fits Riyadh Housing? 2026
Compare A/O, MBR and septic package plants for Riyadh housing developments, with 2026 sizing, site, compliance and supplier-selection guidance.
What Packaged Sewage Treatment Plant Fits Jeddah Housing? 2026
Compare packaged sewage treatment plants for Jeddah housing developments using flow, process, site, sludge and discharge-selection criteria for 2026.
What Packaged Sewage Treatment Plant Fits Dammam Housing? 2026
Compare packaged sewage treatment options for Dammam housing developments using capacity, treatment process, site constraints and reuse requirements.
What Wastewater and Cooling Blowdown Treatment Does Sultanah Need?
Learn what a Sultanah data center needs for wastewater and cooling blowdown treatment, including reuse, process selection and compliance steps.
Sharakat receives bids for $150m Riyadh East sewage plant, Sept 2026
A report published 27 September by MEED says Saudi state water offtaker Sharakat received bids on 28 September for the $150m Riyadh East independent sewage treatment plant, with five consortiums offe…
Jeddah industrial wastewater plant upgrade lifts capacity 60%, October 2026
On 4 October 2026, Bluewater Bio was awarded the technology package to upgrade the MODON Industrial Wastewater Treatment Plant at Jeddah 1st Industrial City, lifting capacity by 60 per cent from 25 M…
PWT Wasser–Al-Masar Al-Hadeeth JV wins Jizan sewage plant deal, Oct 2026
Reporting on 14 October 2026, MEED said Germany-headquartered PWT Wasser and Saudi Arabia's Al-Masar Al-Hadeeth signed a contract to build a wastewater treatment plant in Jizan, southwestern Saudi Ar…
How to Size a Containerized MBR STP for a Riyadh Residential or Camp Project (2026 Guide)
2026 engineering guide to sizing a containerized MBR STP in Riyadh. Saudi flow rates, peak factors, MBR capacity steps, and reuse options for residential and camp projects.
How to Size a Containerized MBR STP in Jeddah (2026 Engineering Guide)
Sizing a containerized MBR STP in Jeddah for residential or camp projects — flow criteria, peak factors, membrane selection, and Saudi compliance.
Sizing a Containerized MBR STP in Dammam 2026: Engineering Guide
How to size a containerized MBR STP in Dammam for residential or camp projects in 2026 — flow rates, container format, membrane specs and Saudi climate factors.
Data Center Cooling Blowdown Treatment in Makkah, Saudi Arabia (2026 Guide)
2026 engineering guide to data center cooling blowdown treatment in Makkah: TDS limits, cycles of concentration, RO reuse, and KSA discharge compliance.
Effluent Treatment Plant in Hail 2026: Process, Capacity & Compliance
2026 guide to effluent treatment plants in Hail, Saudi Arabia — process design, capacity sizing, NCEC/PDPL compliance, and supplier selection for industrial buyers.
Domestic Sewage Treatment in Hail 2026: Process, Capacity & Compliance
2026 engineering guide to domestic sewage treatment in Hail — process design, sizing, Saudi regulations, and HydropureWater package STP options for arid-zone projects.
Domestic Sewage Treatment in Jazan 2026: Process, Capacity & Compliance
2026 engineering guide to domestic sewage treatment in Jazan — process design, capacity sizing, and Saudi regulatory compliance for municipal and camp projects.