Start with the site's sewer and wastewater constraints
For domestic sewage treatment in Lyon, first determine whether the site can connect to Greater Lyon's public sewer network; otherwise, evaluate an on-site treatment plant. Lyon has substantial public treatment capacity: the Saint-Fons plant serves a population equivalent of one million, while a six-year modernization and management contract is valued at 100 million euros (Veolia, source S3). For a non-domestic project, compare the public-sewer route with an underground WSZ A/O package plant handling 1–80 m³/h or an MBR system from 10 to 2,000 m³/day. Final selection requires verified flows, wastewater characteristics, land availability, discharge conditions and local authority requirements.
The wastewater source and its operating pattern dictate the equipment sizing. Establish the daily wastewater flow, average and peak flows, seasonal variation, retention requirements and whether the non-domestic site is residential, hospitality, healthcare or industrial. A generic domestic-sewage flow rate is insufficient to size an installation when the site includes kitchens, laundry, laboratories, food preparation or other process discharges.
Greater Lyon's Saint-Fons wastewater treatment plant treats wastewater from the left bank of the Rhône and some regional industrial groups, equivalent to one million inhabitants. Veolia's 2023 announcement also identifies heavy-rainfall management as an operational issue for the plant (Veolia, 2023). This confirms the metropolitan area's extensive wastewater infrastructure, but it does not establish that a particular site has a usable sewer connection.
Wet-weather peak flow, infiltration and inflow must be accounted for in the design. The US EPA states that significant flow increases caused by wet weather can adversely affect treatment efficiency, reliability and control of unit processes. Faulty connections, damaged pipes and unsuitable surface-water entry can add flow that is not reflected in the nominal wastewater balance.
Do not infer site-specific approval, discharge limits or connection cost from the Saint-Fons operation. Obtain the applicable requirements from the responsible authority or network operator before selecting equipment. The public sewer versus package-plant decision framework provides a useful structure for recording that evidence, but the municipal conditions must come from Lyon.
Compare public sewer, A/O package plant and MBR
A confirmed sewer connection is the primary criterion for selecting the public-sewer route, as the receiving network must accept the proposed flow and wastewater characteristics. The Saint-Fons contract demonstrates substantial metropolitan treatment and asset-management activity, but it is not evidence of automatic connection approval (Veolia, 2023). Use the table to record route selection against five decision fields: sewer access, design flow range, effluent quality, footprint and discharge or reuse destination.
| Decision field | Public sewer | WSZ A/O package plant | MBR |
|---|---|---|---|
| Network access | Select when the authority confirms a feasible connection | Use when no acceptable public-sewer route is available | Use when no acceptable public-sewer route is available |
| Documented flow range | Subject to confirmation for the specific site | 1–80 m³/h (HydropureWater verified product catalog) | 10–2,000 m³/day (HydropureWater product catalog) |
| Process configuration | Network and central treatment; site-side connection works still require definition | A/O biological contact oxidation, sedimentation and disinfection in one buried unit | Membrane bioreactor with filtration below 1 μm stated in the product catalog |
| Installation and reuse considerations | Connection route and works must be established with the authority | Below grade with landscaping above, or trailer-mounted for mobile deployment | Evaluate reuse requirements and the catalog's stated 60% footprint reduction against conventional systems |
| Decision status | Preferred only after written network confirmation | Compact on-site route if the verified duty falls within the documented range | Alternative where filtration or reuse objectives justify the added assessment |
Selecting the correct technology requires matching site constraints to process capabilities. The underground A/O package sewage treatment plant integrates anoxic/aerobic contact oxidation, sedimentation and disinfection in one fully automated unit. The HydropureWater verified product catalog states that it requires no operator and covers 1–80 m³/h for applications including hotels, hospitals, factories and rural communities.
Evaluate an MBR wastewater treatment system where membrane filtration below 1 μm or a defined water-reuse objective is required. Its documented catalog range is 10–2,000 m³/day, and the catalog states a footprint 60% smaller than conventional systems. Those claims must still be checked against the proposed layout, treatment duty and local compliance conditions.
Match the treatment process to the application

The WSZ process combines biological treatment with solids separation and disinfection, suitable for sites requiring compact package treatment. The HydropureWater verified product catalog describes the complete train as anoxic/aerobic biological contact oxidation followed by sedimentation and disinfection.
Characterize the wastewater before defining treatment objectives. InTech eBooks reports that organic pollution originates from domestic sewage, urban runoff, industrial effluent and agricultural wastewater; decomposition can consume dissolved oxygen faster than it is replenished and severely affect receiving-water biota (S2). That evidence supports identifying organic loading, but it does not provide a Lyon-specific discharge standard.
The application determines which contaminants require attention. Hospitality and residential flows may produce relatively stable organic loads, while healthcare and industrial sites can introduce intermittent discharges, disinfectants or compounds that alter biological treatment. For mixed commercial or industrial waste, require a wastewater characterization rather than treating a generic domestic-sewage flow rate as sufficient design data.
Vermifiltration is described as an efficient, viable and decentralizable option for domestic sewage in an IntechOpen study, but the supplied excerpt contains no Lyon performance record (S5). It therefore remains an alternative requiring local verification. The A/O package plant versus MBR comparison is useful for understanding the process distinctions; the application assessment must still use the Lyon's verified effluent and reuse requirements.
Build the procurement specification before selecting a supplier
A defensible equipment selection starts with a signed wastewater balance and a site-specific duty definition. Request average flow, peak flow, seasonal variation, retention requirements, effluent destination and any anticipated wet-weather inflow. The US EPA identifies infiltration and inflow as a cause of sewer overflows and treatment-facility operating problems, so uncertainty in this balance cannot be treated as spare capacity without project evidence (US EPA, source S4).
Require each supplier to map the proposed process against the verified duty, controls, installation method, maintenance access and commissioning acceptance tests. The procurement brief should identify who owns each activity, including civil works, electrical supply, sampling, operator training, remote monitoring and maintenance. Supplier statements about automation or footprint should be tied to the actual installation constraints rather than accepted as general site assumptions.
| Procurement field | Evidence the buyer must obtain | Equipment check |
|---|---|---|
| Hydraulic duty | Signed wastewater balance with average, peak, seasonal and wet-weather conditions | WSZ: confirm the duty is within 1–80 m³/h; MBR: confirm it is within 10–2,000 m³/day |
| Installation | Survey, geology, access, utilities, landscaping and maintenance-space requirements | Verify below-grade feasibility for WSZ and the proposed MBR arrangement |
| Performance | Applicable discharge or reuse criteria and sampling requirements | Define guaranteed duty points, effluent parameters and acceptance tests |
| Legal interface | Sewer-entry conditions, discharge authorization and construction or environmental approvals | Assign responsibility and include the requirements in the contractual scope |
| Operations | Service access, staffing assumptions, spare parts and maintenance responsibilities | Confirm controls, alarms, access clearances and commissioning handover |
Technical specifications provide the baseline for comparing system performance. For the WSZ, verify whether the 1–80 m³/h envelope covers the design duty and whether below-grade installation fits the site's geology, access, landscaping and maintenance plan. For MBR, define what filtration below 1 μm and the stated 60% footprint reduction mean for the proposed layout; neither statement substitutes for a site-specific duty check.
Obtain local compliance evidence separately from product claims. The responsible project parties must identify sewer-entry conditions, discharge authorization, sampling requirements and applicable construction or environmental approvals. The industrial effluent treatment buyer's decision guide offers a broader procurement structure, but local approvals must be confirmed for the Lyon site.
Frequently Asked Questions
What will domestic sewage treatment in Lyon cost for a non-domestic site?
No defensible project price can be calculated from the supplied evidence because site flow, sewer-connection conditions, treatment objectives, excavation requirements and approval scope are missing. Request a written quotation that separates equipment, civil works, electrical installation, network connection or discharge infrastructure, commissioning, maintenance and authority charges. Also request the basis for any exclusions and the assumptions attached to the quoted flow range.
Should the site use a WSZ A/O package plant or an MBR?
Use the WSZ A/O route when the verified duty falls within its 1–80 m³/h range, an on-site biological package treatment solution is appropriate and the applicable effluent requirements can be met (HydropureWater verified product catalog). Evaluate MBR when its 10–2,000 m³/day range covers the duty and the required filtration or reuse performance justifies the technology. This is a screening decision; final selection also requires wastewater characterization, footprint verification and acceptance criteria.
How should a supplier be selected?
Require a duty-based process proposal rather than a model recommendation alone. Ask each supplier to define the design flow points, process treatment capacity, controls, installation scope, maintenance access, commissioning tests and site-specific performance guarantees. Require references for comparable applications and a contractual procedure for resolving any failure to meet the agreed acceptance criteria.
What approvals apply before selecting treatment equipment?
Identify the receiving route and responsible authority first: public sewer, authorized discharge or water reuse. Veolia's 2023 Saint-Fons announcement confirms regional treatment capacity, but it does not establish a site's legal discharge conditions or sewer-entry approval. Obtain the applicable connection conditions, discharge authorization, sampling requirements and construction or environmental approvals before ordering equipment.
What lead time should the buyer plan for?
Request a project schedule from the selected supplier because the supplied sources provide no verified manufacturing or delivery range for Lyon. The schedule should separate design approval, manufacturing, civil works, utility connections, installation, commissioning and discharge authorization. Treat any date offered by the supplier as a proposal until supported by the agreed scope and current project schedule.