Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation
HYDROPUREWATER · Wastewater research dossier

South Africa
Municipal Wastewater

Local study records, kept in their original context.

Measurements & sampling context

Published study measurements are not national averages, current factory design inputs or discharge limits.

Leeuwkuil WWTW, Vereeniging · industrially influenced municipal sewage

Municipal treatment evidence must retain industrial inputs and seasonal variability instead of assuming domestic-only sewage.

Year (basis shown below)
2020 · Publication year
Sampling period
2017-01/2017-09

Research scale: Full-scale municipal plant; field monitoring across three seasons, January–September 2017.

Sample / stageParameterReported valueUnitConditions & statisticOriginal study
Leeuwkuil WWTP influent

Untreated influent

Temperature21.6 ± 4°CJanuary–September 2017; industrial inputs present

Reported mean ± SD

Original study ↗
Leeuwkuil WWTP influent

Untreated influent

pH8.3 ± 0.6January–September 2017; industrial inputs present

Reported mean ± SD

Original study ↗
Leeuwkuil WWTP influent

Untreated influent

BOD3.3 ± 1.2mg/LReported BOD, not relabelled BOD5

Reported mean ± SD

Original study ↗
Leeuwkuil WWTP influent

Untreated influent

DO1.4 ± 0.3mg/LJanuary–September 2017; industrial inputs present

Reported mean ± SD

Original study ↗
Leeuwkuil WWTP influent

Untreated influent

COD434 ± 50mg/LJanuary–September 2017; industrial inputs present

Reported mean ± SD

Original study ↗
Leeuwkuil WWTP influent

Untreated influent

TDS335 ± 14mg/LJanuary–September 2017; industrial inputs present

Reported mean ± SD

Original study ↗
Leeuwkuil WWTP final effluent

Treated effluent

Temperature22.7 ± 5°CJanuary–September 2017; after plant treatment

Reported mean ± SD

Original study ↗
Leeuwkuil WWTP final effluent

Treated effluent

pH8 ± 0.3January–September 2017; after plant treatment

Reported mean ± SD

Original study ↗
Leeuwkuil WWTP final effluent

Treated effluent

BOD3.8 ± 0.7mg/LReported mean exceeds inlet; no BOD-removal claim

Reported mean ± SD

Original study ↗
Leeuwkuil WWTP final effluent

Treated effluent

DO2.7 ± 0.4mg/LJanuary–September 2017; after plant treatment

Reported mean ± SD

Original study ↗
Leeuwkuil WWTP final effluent

Treated effluent

COD36 ± 67mg/LTable 1 reports mean±SD; no negative concentration implied

Reported mean ± SD

Original study ↗
Leeuwkuil WWTP final effluent

Treated effluent

TDS258 ± 21mg/LJanuary–September 2017; after plant treatment

Reported mean ± SD

Original study ↗

Treatment studied

Screening and primary clarification precede biological treatment and chlorination; measured inlet and final effluent remain distinct.

Study limitations

Industrially influenced sewage. BOD retained as labelled; suspect EC units omitted. Historical observations, not current compliance or national averages.

Investigating Industrial Effluent Impact on Municipal Wastewater Treatment Plant in Vaal, South Africa

International Journal of Environmental Research and Public Health · MDPI

Methods §§2.1–2.3; Results §3.1, Table 1, WWTP influent and effluent rows · Table 1; journal article 17(3), 1096

Original study ↗

Same study: full-text copy ↗

This copy supports access to the same study; it is not another independent source.

Latest source-linked developments

News is refreshed with the public library. Historical study measurements above retain their sampling period and original conditions.

No verified report currently matches this country and industry.

Open the industry dashboard →

Applicable discharge requirements

These studies do not establish a currently applicable discharge permit. Confirm the receiving route, local authority, effective legal text and permit before selecting a limit. No unverified limit is reproduced as law.

Using these records

What do these measurements represent?

Published study measurements are not national averages, current factory design inputs or discharge limits.

Are these values legal discharge limits?

These studies do not establish a currently applicable discharge permit. Confirm the receiving route, local authority, effective legal text and permit before selecting a limit. No unverified limit is reproduced as law.

What information is needed to select equipment?

Share a current water analysis, flow, production schedule and intended discharge or reuse route.

Discuss your site conditions

Share a current water analysis, flow, production schedule and intended discharge or reuse route.

Discuss your site conditions →
AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us