Confirm the discharge route before selecting equipment
Domestic sewage treatment in Toulouse should begin with a site-specific decision: confirm whether a lawful public-sewer connection is physically available, then compare that route with an onsite A/O package plant or membrane bioreactor if it is not. The decision depends on average and peak flow, wastewater characteristics, available space, reuse objectives and maintenance access. Equipment capacity alone cannot establish Toulouse compliance. Sewer availability, connection conditions, discharge requirements and prices were not supplied in the research and must be checked with the responsible local service provider or authority.
Ask the authority or service provider for written confirmation of the applicable discharge route, network availability, connection requirements, required pre-treatment, approval pathway and any contribution or connection charges. Do not assume that proximity to a sewer implies a usable connection. Record whether the project objective is lawful discharge, reuse, water recovery or preservation of a future connection route.
The US EPA explains the hydraulic distinction between sewer types as a general flow-control lesson: combined sewers collect sanitary sewage and stormwater in one pipe, while separate sanitary sewers are intended to collect wastewater but can receive infiltration and inflow during wet weather through cracks, faulty seals or improper connections (US EPA, Municipal Wastewater, current source accessed 2026). Wet-weather flow can therefore affect either the receiving system or an onsite plant, even where stormwater is excluded from the design sewage flow.
| Route | Evidence-based screen | Local information required |
|---|---|---|
| Public-sewer discharge | Use where a confirmed connection route exists and the sewer authority accepts the proposed discharge. | Network availability, connection specifications, pre-treatment requirements, charges and approval conditions. |
| Onsite A/O package plant | Use where biological treatment, sedimentation and disinfection can be packaged within the available footprint and operating regime. | Design flow, wastewater character, excavation and access constraints, effluent route and maintenance responsibilities. |
| Onsite MBR system | Use where membrane separation, reuse potential or a smaller treatment footprint materially affects the project decision. | Effluent and reuse requirements, membrane operation, solids handling, utilities, service scope and authority acceptance. |
Build the flow and wastewater design brief
A domestic wastewater sizing brief must distinguish average daily flow from the flow the selected equipment must handle under peak conditions. Collect measured or reliably estimated average daily flow, peak flow, seasonal variation, occupancy and staffing schedules, toilet count, and any kitchen, laundry, medical or industrial inflows. The supplied research contains no Toulouse-specific unit-loading factors, occupancies or peak-factor values, so the brief should request the project’s actual operating data rather than introduce unsupported assumptions.
Exclude roof runoff, stormwater and other clean-water inflows from the sewage design flow. The US EPA notes that wet-weather infiltration and inflow can cause sanitary-sewer overflows and treatment-plant operating problems; significant flow increases can also adversely affect treatment efficiency, reliability and control of unit processes (US EPA, Municipal Wastewater, current source accessed 2026). Include any unavoidable flow or load that a sewer or treatment system must accommodate and identify whether it is derived from wastewater use or from ingress.
Request laboratory and process information rather than sizing from flow alone. Relevant project inputs include suspended solids, nutrients, temperature, pH and regulated contaminants, plus any kitchen grease, laundry effluent or medical streams. Identify whether the proposed treatment train includes preliminary screening, equalisation, biological treatment, clarification, disinfection and solids handling, and who is responsible for each stage.
The verified equipment-screening ranges are 1–80 m³/h for the WSZ A/O package sewage treatment plant and 10–2,000 m³/day for the MBR sewage treatment system (HydropureWater verified product catalog, 2026). These are manufacturer ranges for screening suppliers, not evidence that a particular model covers the site load. Convert the project basis to the units used by each supplier and require a manufacturer duty check.
| Brief field | Evidence or input to obtain | Why it affects route selection |
|---|---|---|
| Average daily flow | Measured flow, water-use records or a documented occupancy-based estimate. | Establishes the baseline treatment and equipment-sizing duty. |
| Peak flow | Observed peak, seasonal variation, occupancy schedule and contributing wastewater streams. | Tests hydraulic capacity, equalisation needs and overflow risk. |
| Wastewater character | Laboratory results, solids and nutrient data, pH, temperature and regulated contaminants. | Determines biological loading, pretreatment and effluent treatment requirements. |
| Equipment screening range | WSZ: 1–80 m³/h; MBR: 10–2,000 m³/day (HydropureWater verified product catalog, 2026). | Identifies which architecture can enter detailed sizing; it does not replace a duty check. |
Match the site constraints to an onsite treatment route

Footprint, ground conditions and maintenance access can eliminate an onsite route before equipment is selected. The WSZ A/O package sewage treatment plant combines anoxic/aerobic biological contact oxidation, sedimentation and disinfection in one buried package unit; it can be installed below grade with landscaping above or mounted on a trailer for mobile deployment (HydropureWater verified product catalog, 2026). Confirm excavation depth, ground conditions, lifting access, ventilation needs, controls access and local installation constraints rather than treating the packaged arrangement as a turnkey site solution.
The MBR route has a different design emphasis. The supplier states filtration below 1 μm, a capacity range of 10–2,000 m³/day and a 60% footprint reduction compared with conventional systems (HydropureWater verified product catalog, 2026). Those specifications make MBR relevant when footprint or membrane-grade separation is central, but they do not establish suitability for a particular effluent quality or reuse scheme. The comparison must be made on the same daily-load basis, followed by a duty check against each manufacturer’s curve.
Where reuse requires advanced solids separation or disinfection, evaluate ultrafiltration as a possible downstream stage. The supplied catalogue identifies a UF range of 2,000–40,000 L/h and 0.03 μm PVDF membranes (HydropureWater verified product catalog, 2026). That equipment performs membrane filtration; it should not be substituted for the core biological sewage process without defining the complete treatment train.
| Constraint | A/O package plant screen | MBR screen |
|---|---|---|
| Verified capacity range | 1–80 m³/h (HydropureWater verified product catalog, 2026). | 10–2,000 m³/day (HydropureWater verified product catalog, 2026). |
| Installation | Buried package unit with landscaping above, or trailer-mounted for mobile deployment. | Footprint is stated as 60% smaller than conventional systems; installation arrangements require supplier confirmation. |
| Separation quality | Sedimentation is part of the packaged process; filtration performance was not stated in the supplied source. | Filtration below 1 μm is stated by the supplier. |
| Site checks | Excavation, access, controls, odour, power and maintenance routes. | Footprint, membrane access, sludge or reject handling, utilities and cleaning requirements. |
Compare A/O package plants and MBR systems
An A/O package plant is the direct choice when a compact biological treatment train with sedimentation and disinfection is appropriate and the verified duty falls within the WSZ range of 1–80 m³/h. The MBR route becomes more compelling when membrane separation, reuse potential or footprint reduction is central and the project basis falls within the stated 10–2,000 m³/day range (HydropureWater verified product catalog, 2026). Neither range replaces a design check against the actual flow and wastewater profile.
The comparison must extend beyond treatment stages. Require each supplier to describe mechanical complexity, operator involvement, sludge handling, membrane replacement strategy, power demand, alarms, remote control, routine maintenance and access requirements. The supplied sources do not quantify life-cycle cost, energy consumption, membrane life or operator hours for Toulouse. Obtain comparable written proposals with the same design duty, effluent targets, installation boundary, service scope and acceptance conditions.
Use the EPA overview as an operational-resilience test. Wet-weather peak flows can create operating challenges and adversely affect treatment efficiency, reliability and control of unit-process operations (US EPA, Municipal Wastewater, current source accessed 2026). The supplier brief should therefore address peak-flow treatment, equalisation, bypass or overflow provisions, redundancy, power-loss response and maintenance access. The more detailed MBR sewage design criteria provides a useful basis for comparing process requirements with the site brief.
| Decision criterion | A/O package plant | MBR system |
|---|---|---|
| Primary architecture | Anoxic/aerobic biological contact oxidation, sedimentation and disinfection in a buried package unit. | Biological treatment with membrane separation; filtration below 1 μm is stated by the supplier. |
| Verified range | 1–80 m³/h (HydropureWater verified product catalog, 2026). | 10–2,000 m³/day (HydropureWater verified product catalog, 2026). |
| Strongest selection case | Compact packaged treatment where biological contact oxidation, clarification and disinfection are required. | Projects prioritising membrane separation, reuse potential or reduced footprint. |
| Supplier evidence still required | Duty curve, effluent guarantee, sludge handling, controls, utilities, installation scope and maintenance plan. | Duty curve, membrane system, cleaning and replacement plan, reject handling, utilities, controls and service scope. |
Prepare a supplier-ready compliance and acceptance brief

Convert the selected route into a common technical schedule so quotations can be compared without hidden assumptions. Require each supplier to state its design basis, guaranteed flow envelope, process stages, effluent targets, controls, utilities, installation boundary, commissioning scope and routine maintenance tasks. Include the treatment duty, wastewater character, available footprint and reuse objective in the same schedule; do not accept a headline capacity range as the guarantee.
Ask the responsible Toulouse authority to verify the applicable discharge or reuse requirements, approval pathway and any connection or pre-treatment conditions. No Toulouse numerical discharge limit, permit condition, sewer tariff or soil criterion was supported by the supplied evidence. These remain explicit local verification items, not assumptions to be filled in by the equipment supplier.
| Acceptance item | Required written response |
|---|---|
| Design compliance | Design flow, peak condition, wastewater basis, process stages and applicable authority requirements. |
| Performance | Stated effluent targets, guarantees, test method, sampling points and acceptance period. |
| Installation | Excavation, foundations, access, power, controls, noise, odour, landscaping and site restoration. |
| Operations | Sludge removal, consumables, cleaning, membrane replacement, routine tasks and service responsibilities. |
| Commissioning | Testing, training, documentation, operating data and handover criteria. |
Frequently Asked Questions
How should domestic sewage treatment in Toulouse be sized?
Base sizing on verified average daily flow, peak flow, seasonal variation and wastewater characteristics. Use the WSZ range of 1–80 m³/h or MBR range of 10–2,000 m³/day only for initial screening (HydropureWater verified product catalog, 2026), then require the manufacturer to check the specific duty against its curve.
Which route should be chosen for a non-sewered property?
Choose an A/O package plant where a compact biological treatment, sedimentation and disinfection train fits the site and operating requirements. Consider MBR where membrane separation, reuse potential or reduced footprint is the defining project constraint. A sewer route remains preferable where a confirmed lawful connection is available.
How should an A/O plant and MBR supplier be compared?
Request equivalent written proposals covering the same design flow and effluent targets. Compare included process stages, controls, utilities, installation, sludge or reject handling, maintenance, replacement strategy, service scope and guarantees. The supplied sources do not provide comparable life-cycle costs, so pricing should not be inferred from capacity.
What should be confirmed before ordering equipment?
Obtain written confirmation from the relevant Toulouse authority of the applicable discharge or reuse route, approval pathway and connection or pre-treatment conditions. Before accepting a supplier’s price, check that it includes the stated treatment duty, installation boundary, commissioning, routine maintenance, documentation and defined acceptance tests.