Zhongsheng Environmental industrial RO systems deliver ultra-pure permeate at recovery rates up to 95%, serving pharmaceutical, semiconductor, food & beverage, and power generation applications worldwide. Fully automated PLC-controlled operation with continuous output and minimal chemical consumption.
Reverse osmosis (RO) is a pressure-driven membrane separation process that forces feedwater through semi-permeable membranes, rejecting dissolved salts, organics, colloids, and micro-organisms to produce high-purity permeate. Zhongsheng Environmental's industrial RO water treatment systems are engineered for continuous, unattended operation across a wide range of capacities — from compact skid-mounted units for small facilities to large-scale multi-train configurations for municipal and heavy-industrial applications. Every system ships factory-tested and ready for rapid commissioning.
Feedwater is first pre-treated (typically via multi-media filtration, activated carbon adsorption, and antiscalant dosing) to protect downstream membranes. A high-pressure pump then forces the pre-treated water through spiral-wound polyamide thin-film composite (TFC) membrane elements. Water molecules pass through the membrane while dissolved salts, heavy metals, bacteria, and organic compounds are rejected and discharged as concentrate. The permeate is collected, post-treated (pH adjustment, remineralization, or EDI polishing as required), and delivered to the point of use. An integrated CIP (Clean-in-Place) system automates periodic membrane cleaning to maintain flux and rejection performance over the membrane's service life.
| Parameter | Specification |
|---|---|
| Permeate Capacity Range | 0.25 – 200 m³/h (custom capacities available) |
| Salt Rejection Rate | ≥ 97% (single pass); ≥ 99.5% (double pass) |
| Recovery Rate | 50% – 95% (application dependent) |
| Feedwater TDS | ≤ 2,000 mg/L (brackish); ≤ 35,000 mg/L (seawater series) |
| Operating Pressure | 1.0 – 6.5 MPa (brackish / seawater) |
| Membrane Type | Spiral-wound TFC polyamide (DOW FILMTEC / Hydranautics / Toray compatible) |
| Membrane Housing | FRP pressure vessels, 4" / 8" diameter |
| Frame & Piping | SS304 / SS316L frame; Schedule 80 PVC or SS piping |
| Power Supply | 380V / 50Hz / 3-phase (customizable) |
| Control System | Siemens / Mitsubishi PLC with 7" or 10" HMI touchscreen |
| Permeate Quality | Conductivity ≤ 10 μS/cm (single pass); ≤ 1 μS/cm (double pass + EDI) |
| Compliance | WHO Drinking Water Guidelines; EU Directive 2020/2184; US EPA SDWA; Pharmacopoeia-grade available |
Zhongsheng Environmental has delivered hundreds of industrial RO installations across Asia, the Middle East, and Africa. Our systems are built around premium membrane elements and corrosion-resistant materials, backed by in-house process engineering that optimises recovery, energy consumption, and membrane life for your specific feedwater chemistry. From initial water analysis through commissioning and long-term membrane management, our team provides a single point of responsibility — so you get reliable, specification-grade water with the lowest total cost of ownership.
Up to 95%, minimizing raw water consumption and concentrate discharge.
Drinking water purification, mineral/spring water production, food & beverage processing, pharmaceutical ultra-pure water, electronics manufacturing, industrial boiler feed water, seawater desalination, and brackish water treatment.
No, unlike ion exchange systems, RO operates continuously without acid/alkali regeneration cycles.
Multi-media filtration, activated carbon adsorption, and antiscalant dosing to protect membrane elements.
Get a free consultation and customized quote from our engineering team.