Suez Canal area · saline refinery stream after API oil separation
A saline refinery study shows why oil separation, biological treatment and salt management require separate evidence.
- Year (basis shown below)
- 2024 · Publication year
- Sampling period
- Not reported
Research scale: Laboratory activated-sludge columns; B1 saline run at 20–25 °C.
| Sample / stage | Parameter | Reported value | Unit | Conditions & statistic | Original study |
|---|---|---|---|---|---|
| B1 · after API separator, before ASP Intermediate process water | pH | 7.5 | Saline B1 run; 20–25 °C Original table value | Original study ↗ | |
| B1 · after API separator, before ASP Intermediate process water | TDS | 14320 | mg/L | B1 feed TDS; no outlet TDS reported in Table 3 Original table value | Original study ↗ |
| B1 · after API separator, before ASP Intermediate process water | TSS | 111 | mg/L | Saline B1 run; 20–25 °C Original table value | Original study ↗ |
| B1 · after API separator, before ASP Intermediate process water | COD | 409 | mg/L | Saline B1 run; 20–25 °C Original table value | Original study ↗ |
| B1 · after API separator, before ASP Intermediate process water | BOD | 218 | mg/L | Table 3 BOD label retained Original table value | Original study ↗ |
| B1 · after API separator, before ASP Intermediate process water | Oil and grease | 70.6 | mg/L | Saline B1 run; 20–25 °C Original table value | Original study ↗ |
| B1 · after API separator, before ASP Intermediate process water | Phenol | 2.5 | mg/L | Outlet reported ND; not converted to zero Original table value | Original study ↗ |
| B1 · laboratory ASP outlet Treated effluent | pH | 7.7 | Saline B1 run; 20–25 °C; after settling Original table value | Original study ↗ | |
| B1 · laboratory ASP outlet Treated effluent | TSS | 7.6 | mg/L | Saline B1 run; 20–25 °C; after settling Original table value | Original study ↗ |
| B1 · laboratory ASP outlet Treated effluent | COD | 98 | mg/L | Saline B1 run; 20–25 °C; after settling Original table value | Original study ↗ |
| B1 · laboratory ASP outlet Treated effluent | BOD | 32 | mg/L | Table 3 BOD label retained Original table value | Original study ↗ |
| B1 · laboratory ASP outlet Treated effluent | Oil and grease | 8.8 | mg/L | Saline B1 run; 20–25 °C; after settling Original table value | Original study ↗ |
Treatment studied
API oil separation precedes the tested activated-sludge columns; nutrients were supplemented and effluent settled.
Study limitations
Post-API intermediate water, not raw refinery wastewater. One saline temperature condition; no desalination or full-scale compliance inferred.
Effect of temperature and total dissolved solids on the performance of activated sludge process for oil refinery wastewater: Case Study
Egyptian Journal of Chemistry · National Research Centre
Abstract; Methods §§2.1–2.3; Table 3, B1 influent and effluent columns · Journal pp. 435–436 and 439; PDF pp. 1–2 and 5
Original study ↗This copy supports access to the same study; it is not another independent source.