Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation
HYDROPUREWATER · Wastewater research dossier

Ethiopia
Food & Beverage

Local study records, kept in their original context.

Measurements & sampling context

Published study measurements are not national averages, current factory design inputs or discharge limits.

St George brewery, Addis Ababa; university pilot

Brewery research separates organic-load reduction from the remaining nutrient and polishing needs.

Year (basis shown below)
2018 · Publication year
Sampling period
2016-05/2016-11

Research scale: Pilot: three planted units and one control; 5-day HRT, 0.15 m³/day per unit.

Sample / stageParameterReported valueUnitConditions & statisticOriginal study
HPT inlet after primary settling

Intermediate process water

BOD51214 ± 380.61mg/LMay–November 2016; pilot inlet

Reported mean ± SD

Original study ↗
HPT inlet after primary settling

Intermediate process water

COD2012 ± 595.66mg/LMay–November 2016; pilot inlet

Reported mean ± SD

Original study ↗
HPT inlet after primary settling

Intermediate process water

TKN33 ± 8.46mg N/LMay–November 2016; pilot inlet

Reported mean ± SD

Original study ↗
HPT inlet after primary settling

Intermediate process water

NH4-N24 ± 4.32mg N/LMay–November 2016; pilot inlet

Reported mean ± SD

Original study ↗
HPT inlet after primary settling

Intermediate process water

NO3-N13 ± 3.12mg N/LMay–November 2016; pilot inlet

Reported mean ± SD

Original study ↗
HPT inlet after primary settling

Intermediate process water

PO4-P15 ± 5mg P/LMay–November 2016; pilot inlet

Reported mean ± SD

Original study ↗
Planted HPT outlet

Treated effluent

BOD5527 ± 257.89mg/LSame pilot period; 5-day HRT

Reported mean ± SD

Original study ↗
Planted HPT outlet

Treated effluent

COD1111 ± 461.09mg/LTable 1 mean; contradictory published range excluded

Reported mean ± SD

Original study ↗
Planted HPT outlet

Treated effluent

TKN19 ± 2.24mg N/LSame pilot period; 5-day HRT

Reported mean ± SD

Original study ↗
Planted HPT outlet

Treated effluent

NH4-N15 ± 1.93mg N/LSame pilot period; 5-day HRT

Reported mean ± SD

Original study ↗
Planted HPT outlet

Treated effluent

NO3-N7 ± 2.49mg N/LSame pilot period; 5-day HRT

Reported mean ± SD

Original study ↗
Planted HPT outlet

Treated effluent

PO4-P7 ± 2mg P/LSame pilot period; 5-day HRT

Reported mean ± SD

Original study ↗

Treatment studied

Primary settling followed by vetiver hydroponics; compare the planted outlet with the pilot inlet.

Study limitations

Pilot results; inlet already settled. COD outlet range contradicts its mean; only mean±SD retained. No compliance claim.

Bioremediation of brewery wastewater using hydroponics planted with vetiver grass in Addis Ababa, Ethiopia

Bioresources and Bioprocessing · Springer Nature

Methods: sampling and operation; Results: Table 1 · PDF pp. 3–5; Table 1 on p. 5

Original study ↗

Latest source-linked developments

News is refreshed with the public library. Historical study measurements above retain their sampling period and original conditions.

No verified report currently matches this country and industry.

Open the industry dashboard →

Applicable discharge requirements

These studies do not establish a currently applicable discharge permit. Confirm the receiving route, local authority, effective legal text and permit before selecting a limit. No unverified limit is reproduced as law.

Using these records

What do these measurements represent?

Published study measurements are not national averages, current factory design inputs or discharge limits.

Are these values legal discharge limits?

These studies do not establish a currently applicable discharge permit. Confirm the receiving route, local authority, effective legal text and permit before selecting a limit. No unverified limit is reproduced as law.

What information is needed to select equipment?

Share a current water analysis, flow, production schedule and intended discharge or reuse route.

Discuss your site conditions

Share a current water analysis, flow, production schedule and intended discharge or reuse route.

Discuss your site conditions →
AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us