Egypt
Chemical Manufacturing

Local study records, kept in their original context.

Measurements & sampling context

Published study measurements are not national averages, current factory design inputs or discharge limits.

Borg El Arab, Alexandria · polyester resin wastewater

Polyester resin research connects soluble organic loading to staged anaerobic–aerobic treatment.

Year (basis shown below)
2024 · Publication year
Sampling period
Not reported

Research scale: Pilot: 41-L UASR plus 9.54-L sponge medium; feed 11.5 L/day.

Sample / stageParameterReported valueUnitConditions & statisticOriginal study
DPIE · 70:30 prepared pilot feed

Prepared experimental feed

pH7.1470:30 industrial:domestic wastewater by volume

Original table average

Original study ↗
DPIE · 70:30 prepared pilot feed

Prepared experimental feed

COD3291mg/L70:30 industrial:domestic wastewater by volume

Original table average

Original study ↗
DPIE · 70:30 prepared pilot feed

Prepared experimental feed

Soluble COD2899mg/L70:30 feed; soluble fraction after 0.45-µm filtration

Original table average

Original study ↗
DPIE · 70:30 prepared pilot feed

Prepared experimental feed

TOC1021mg/L70:30 industrial:domestic wastewater by volume

Original table average

Original study ↗
DPIE · 70:30 prepared pilot feed

Prepared experimental feed

Ammonia16mg/LTable 1 label retained; 70:30 prepared feed

Original table average

Original study ↗
DPIE · 70:30 prepared pilot feed

Prepared experimental feed

TKN34.5mg/L70:30 industrial:domestic wastewater by volume

Original table average

Original study ↗
DPIE · 70:30 prepared pilot feed

Prepared experimental feed

TSS336mg/L70:30 industrial:domestic wastewater by volume

Original table average

Original study ↗
DPIE · 70:30 prepared pilot feed

Prepared experimental feed

VSS264mg/L70:30 industrial:domestic wastewater by volume

Original table average

Original study ↗

Treatment studied

UASR anaerobic stage followed by an auto-aerated sponge biomass reactor and settling.

Study limitations

Prepared 70:30 feed, not undiluted factory wastewater. Pilot results; sampling dates not reported.

Performance assessment of up-flow anaerobic multi-staged reactor followed by auto-aerated immobilized biomass unit for treating polyester wastewater, with biogas production

Applied Water Science · Springer Nature

Materials and methods: Characteristics of wastewater; Table 1 · Table 1; Methods: experimental set-up and operational condition

Original study ↗

Latest source-linked developments

News is refreshed with the public library. Historical study measurements above retain their sampling period and original conditions.

No verified report currently matches this country and industry.

Open the industry dashboard →

Applicable discharge requirements

These studies do not establish a currently applicable discharge permit. Confirm the receiving route, local authority, effective legal text and permit before selecting a limit. No unverified limit is reproduced as law.

Using these records

What do these measurements represent?

Published study measurements are not national averages, current factory design inputs or discharge limits.

Are these values legal discharge limits?

These studies do not establish a currently applicable discharge permit. Confirm the receiving route, local authority, effective legal text and permit before selecting a limit. No unverified limit is reproduced as law.

What information is needed to select equipment?

Share a current water analysis, flow, production schedule and intended discharge or reuse route.

Discuss your site conditions

Share a current water analysis, flow, production schedule and intended discharge or reuse route.

Discuss your site conditions →