Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation
HYDROPUREWATER · Wastewater research dossier

Pakistan
Pharmaceutical Manufacturing

Local study records, kept in their original context.

Measurements & sampling context

Published study measurements are not national averages, current factory design inputs or discharge limits.

National Industrial Zone, Rawat · production units S1 and S9

Separate factory records expose variability that a single national pharmaceutical average would conceal.

Year (basis shown below)
2023 · Publication year
Sampling period
Not reported

Research scale: Field characterization: selected untreated samples from a 14-factory survey; triplicate analyses.

Sample / stageParameterReported valueUnitConditions & statisticOriginal study
MB-1 · S1 untreated industrial effluent

Untreated influent

pH7.36 ± 0.3n=3; sampling date not reported

Reported mean ± SD

Original study ↗
MB-1 · S1 untreated industrial effluent

Untreated influent

COD233.3 ± 0.5mg/Ln=3; sampling date not reported

Reported mean ± SD

Original study ↗
MB-1 · S1 untreated industrial effluent

Untreated influent

TDS513 ± 1mg/Ln=3; sampling date not reported

Reported mean ± SD

Original study ↗
MB-1 · S1 untreated industrial effluent

Untreated influent

TSS55.3 ± 3.5mg/Ln=3; sampling date not reported

Reported mean ± SD

Original study ↗
MB-1 · S1 untreated industrial effluent

Untreated influent

DO1.47 ± 0.03mg/Ln=3; sampling date not reported

Reported mean ± SD

Original study ↗
MB-1 · S1 untreated industrial effluent

Untreated influent

Sulfate10.9 ± 0.04mg/Ln=3; sampling date not reported

Reported mean ± SD

Original study ↗
MB-12 · S9 untreated industrial effluent

Untreated influent

pH7.43 ± 0.2n=3; distinct factory from MB-1

Reported mean ± SD

Original study ↗
MB-12 · S9 untreated industrial effluent

Untreated influent

COD1407 ± 3mg/Ln=3; distinct factory from MB-1

Reported mean ± SD

Original study ↗
MB-12 · S9 untreated industrial effluent

Untreated influent

TDS768.3 ± 0.5mg/Ln=3; distinct factory from MB-1

Reported mean ± SD

Original study ↗
MB-12 · S9 untreated industrial effluent

Untreated influent

TSS150.3 ± 1.1mg/Ln=3; distinct factory from MB-1

Reported mean ± SD

Original study ↗
MB-12 · S9 untreated industrial effluent

Untreated influent

DO0.11 ± 0.06mg/Ln=3; distinct factory from MB-1

Reported mean ± SD

Original study ↗
MB-12 · S9 untreated industrial effluent

Untreated influent

Sulfate30.78 ± 1.2mg/Ln=3; distinct factory from MB-1

Reported mean ± SD

Original study ↗

Treatment studied

Characterization survey, not a treatment trial. Selected MB-1 and MB-12 are untreated factory discharges.

Study limitations

Two distinct factories, not before/after pairs. No dated sampling campaign, treatment efficiency or permit applicability inferred.

Physicochemical analysis and detection of exceptionally high diclofenac concentration in the pharmaceutical wastewaters collected from the production units of national industrial zone, Rawat, Pakistan

Applied Water Science · Springer Nature

Methodology: pharmaceutical wastewater collection; Table 1, MB-1 and MB-12 rows · PDF pp. 3–5; Table 1 on p. 4

Original study ↗

Latest source-linked developments

News is refreshed with the public library. Historical study measurements above retain their sampling period and original conditions.

No verified report currently matches this country and industry.

Open the industry dashboard →

Applicable discharge requirements

These studies do not establish a currently applicable discharge permit. Confirm the receiving route, local authority, effective legal text and permit before selecting a limit. No unverified limit is reproduced as law.

Using these records

What do these measurements represent?

Published study measurements are not national averages, current factory design inputs or discharge limits.

Are these values legal discharge limits?

These studies do not establish a currently applicable discharge permit. Confirm the receiving route, local authority, effective legal text and permit before selecting a limit. No unverified limit is reproduced as law.

What information is needed to select equipment?

Share a current water analysis, flow, production schedule and intended discharge or reuse route.

Discuss your site conditions

Share a current water analysis, flow, production schedule and intended discharge or reuse route.

Discuss your site conditions →
AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us