~20,000 m³/d MBR municipal wastewater treatment system

Proposed continuous municipal MBR treatment based on the client-supplied wastewater design basis, subject to confirmation of flow definitions and water quality.

Project Background

The client seeks a continuous MBR wastewater treatment system for municipal sewage, with no stated land constraint. The client-supplied design basis includes BOD 320 mg/L, TSS 230 mg/L and ammonia nitrogen 40 mg/L. Client targets are cBOD 5 mg/L, TSS 12 mg/L, ammonia nitrogen 2 mg/L and dissolved oxygen above 5 mg/L. The AADF and P2HF abbreviations, flow basis and applicable discharge standard remain to be confirmed.

Our Solution

The proposed solution combines preliminary solids screening, flow equalisation, biological treatment and flat-sheet MBR filtration. Mechanical screening protects downstream equipment, equalisation smooths hydraulic and load variation, and the bioreactor is sized to reduce the client-supplied BOD and ammonia load before membrane separation. MBR stages provide the required suspended-solids separation, while tertiary polishing and disinfection address the proposed effluent targets and microbial requirements. Returned sludge is thickened and dewatered by plate-and-frame filtration, with residual sludge routed to the final disposal route to be confirmed. The final configuration, membrane area, equipment sizing and disinfection method will be revised after the flow definitions, complete water analysis, temperature and local permit requirements are confirmed.

What We Asked First

Please confirm the project country, actual use and procurement identity; the meaning and units of AADF and P2HF; peak duration and treatment interfaces; pH, COD, water temperature and complete water quality; discharge requirements; power supply; delivery, installation and commissioning scope.

Proposed Process Train

  1. 1Rotary mechanical bar screen
  2. 2grit and flow equalisation
  3. 3equalisation tank
  4. 4extended aeration bioreactor
  5. 5flat-sheet MBR filtration
  6. 6chemical disinfection
  7. 7tertiary polishing and disinfection
  8. 8sludge thickening
  9. 9plate-and-frame dewatering
  10. 10controlled sludge disposal

For Similar Projects

Prepare the complete wastewater profile, flow definitions, treatment interfaces, discharge standard, power information, delivery location and required installation scope before final equipment selection and engineering design.

Ref. A-012. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).

How We Deliver

Projects of this type are delivered in the nine stages below. Installation, commissioning and other on-site stages follow each contract's scope. Every stage within our scope produces a written record that we keep on file.

  1. 1 Design basis confirmationAverage and peak flow, influent or gas data, discharge or reuse target Record producedDesign basis sheet
  2. 2 Process & mechanical designProcess calculations, equipment selection, layout and piping Record producedCalculation book, P&ID, general arrangement
  3. 3 Manufacturing & quality controlMaterial and in-process inspection of the main equipment Record producedMaterial & QC records
  4. 4 Factory acceptance test (FAT)Trial run against the design parameters before dispatch Record producedFAT record
  5. 5 Packing & dispatchPacked, marked and shipped against the equipment list Record producedPacking list
  6. 6 Installation or supervisionPer contract scope Record producedInstallation record
  7. 7 CommissioningStart-up, parameter tuning and interlocks Record producedCommissioning log
  8. 8 Performance verificationEffluent or emission checked against the design basis Record producedPerformance test record
  9. 9 Training, handover & after-salesOperator training, document handover, after-sales support Record producedO&M manual, training record

Planning a similar project? Start with these six parameters

  1. FlowDaily average and peak (m³/day and m³/h)
  2. Influent qualityCOD, BOD₅, TSS, pH and anything unusual
  3. Discharge targetThe standard you must meet, or the reuse purpose
  4. Operating hoursContinuous or batch; seasonal changes
  5. Site & civil scopeFootprint, power supply, who builds the tanks
  6. Project stageBudgeting, tender, or ready to order

Send your parameters — initial process recommendation within 24 hours

Frequently Asked Questions

This project is listed in the ~20,000 m³/d capacity class: the design value rounded up to the next 5 at its second significant digit. Exact design values are not published.
The process train under assessment is: Rotary mechanical bar screen → grit and flow equalisation → equalisation tank → extended aeration bioreactor → flat-sheet MBR filtration → chemical disinfection → tertiary polishing and disinfection → sludge thickening → plate-and-frame dewatering → controlled sludge disposal.
Yes. Send us your daily and peak flow, influent quality, discharge or reuse target, operating hours and site constraints, and our engineers will reply with an initial process recommendation within 24 hours.

Planning a similar project?

Share your flow, influent quality and discharge target — our engineers respond within 24 hours.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us