Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Compliance & Regulations

Looking for guides for a specific country? Browse wastewater treatment guides by country →

Oil and Grease Discharge Limit in UAE: 2026 Compliance & Treatment Guide

Published: Jul 27, 2026

Oil and grease discharge limit in UAE for 2026 — Federal Decree-Law 12/2026 thresholds, sector-specific limits, DAF & MBR treatment, and step-by-step compliance.

Oil and Grease Discharge Limit in UAE: 2026 Compliance & Treatment Guide

Coking Wastewater Reuse Compliance 2026: Standards, Treatment & Zero-Discharge Design

Published: Jul 26, 2026

Coking wastewater reuse compliance 2026: GB 50050 limits, multi-stage treatment train, RO recovery design, near-zero discharge economics, and a 2026 engineering checklist.

Coking Wastewater Reuse Compliance 2026: Standards, Treatment & Zero-Discharge Design

Petrochemical Wastewater Discharge Standard 2026: Limits, Treatment & Compliance

Published: Jul 26, 2026

Petrochemical wastewater discharge standard 2026 — China GB 31573, US EPA, EU limits for COD, oil, ammonia, and how to meet them with proven treatment trains.

Petrochemical Wastewater Discharge Standard 2026: Limits, Treatment & Compliance

Sulfide Discharge Standard 2026: Global Limits, Treatment & Compliance Guide

Published: Jul 26, 2026

2026 sulfide discharge standard limits for industrial wastewater — China, US EPA, EU and India thresholds, treatment technologies, and compliance engineering guide.

Sulfide Discharge Standard 2026: Global Limits, Treatment & Compliance Guide

Sulfide Discharge Limit South Africa 2026: SANS, NEMWA & Industry Compliance

Published: Jul 26, 2026

South Africa sulfide discharge limit 2026: SANS 241, NEMWA Section 21, DWS norms, and industry-specific caps (1–50 mg/L) for wastewater compliance and treatment design.

Sulfide Discharge Limit South Africa 2026: SANS, NEMWA & Industry Compliance

Nickel Discharge Limit South Africa 2026: Standards, Compliance & Treatment Guide

Published: Jul 26, 2026

Complete 2026 guide to South Africa's nickel discharge limits under DWAF, NEM:WA, and SANS. Includes engineering specs, treatment tech, and compliance costs.

Nickel Discharge Limit South Africa 2026: Standards, Compliance & Treatment Guide

Ammonia Nitrogen Discharge Limit Vietnam 2026: QCVN Compliance Guide

Published: Jul 26, 2026

Vietnam ammonia nitrogen discharge limits in 2026 under QCVN 14 & QCVN 40. Covers NH3 caps by industry, treatment process selection, and compliance roadmap.

Ammonia Nitrogen Discharge Limit Vietnam 2026: QCVN Compliance Guide

Fluoride Discharge Standard 2026: Global Limits & Treatment Guide

Published: Jul 25, 2026

2026 fluoride discharge standard for industrial wastewater — China 10 mg/L, US EPA 4 mg/L, EU 5–50 mg/L. Treatment tech, compliance, and removal data.

Fluoride Discharge Standard 2026: Global Limits & Treatment Guide

Total Nitrogen Discharge Limit in Vietnam 2026: QCVN Compliance Guide

Published: Jul 25, 2026

Complete 2026 guide to Vietnam total nitrogen discharge limits under QCVN 40:2011/BTNMT and QCVN 14:2008. Effluent values, industrial categories, and treatment design.

Total Nitrogen Discharge Limit in Vietnam 2026: QCVN Compliance Guide

Kenya Wastewater Discharge Regulations 2026: NEMA Standards & Limits

Published: Jul 25, 2026

NEMA enforces Kenya industrial effluent limits under EMCA Cap 387 and LN 120/2006, with 2020 discharge guidelines adding nutrients, pathogens, and metals. Design baselines remain BOD ≤ 50 mg/L, COD ≤ 100 mg/L, and TSS ≤ 50 mg/L, plus TN ≤ 20 mg/L and TP ≤ 5 mg/L. Permit work typically needs an EIA license, NEMA discharge permit, WRA abstraction permit, and a county trade-effluent agreement before commissioning.

Kenya Wastewater Discharge Regulations 2026: NEMA Standards & Limits

Cyanide Discharge Limit in Indonesia 2026: PP 22/2021 Compliance Guide

Published: Jul 25, 2026

Cyanide discharge limit in Indonesia 2026 under PP 22/2021 and Permen LHK P.68. Total CN 0.05 mg/L, WAD CN 0.5 mg/L — full compliance guide.

Cyanide Discharge Limit in Indonesia 2026: PP 22/2021 Compliance Guide

Ammonia Nitrogen Discharge Limit Philippines 2026: DAO 2021-19 Compliance Guide

Published: Jul 25, 2026

Ammonia nitrogen discharge limit Philippines 2026 under DAO 2021-19: effluent standards, BOD/NH3-N compliance, treatment tech and engineering checklist.

Ammonia Nitrogen Discharge Limit Philippines 2026: DAO 2021-19 Compliance Guide

BOD Discharge Limit in Indonesia 2026: Baku Mutu PP 22/2021 Compliance Guide

Published: Jul 24, 2026

Indonesia's industrial BOD5 discharge limit is 50 mg/L under PP 22/2021 Lampiran VI, with 30 mg/L for Class I–II receiving waters and 100 mg/L for selected domestic and agro-industrial categories. Permen LHK sector decrees and provincial Pergub can tighten the national ceiling. Most plants hit compliance with equalization, A/O or MBR biology, and DAF polishing.

BOD Discharge Limit in Indonesia 2026: Baku Mutu PP 22/2021 Compliance Guide

Ammonia Nitrogen Discharge Limit South Africa 2026: NEMWA & SANS Standards

Published: Jul 24, 2026

South Africa ammonia nitrogen discharge limit in 2026 under NEMWA, SANS 241, and DWS: numeric thresholds, sector rules, treatment tech & compliance.

Ammonia Nitrogen Discharge Limit South Africa 2026: NEMWA & SANS Standards

Chromium Discharge Limit Malaysia 2026: EQA 1974 Standards & Compliance Guide

Published: Jul 24, 2026

Malaysia's 2026 chromium discharge limits under EQA 1974: 0.05 mg/L Cr(VI) & 0.20 mg/L Cr(III) for Standard A. Process design, treatment tech, and DOE compliance.

Chromium Discharge Limit Malaysia 2026: EQA 1974 Standards & Compliance Guide

Suspended Solids Discharge Limit in Brazil 2026: CONAMA 430/2011 Compliance & Treatment Design Guide

Published: Jul 24, 2026

Brazil suspended solids discharge limit under CONAMA 430/2011 — industrial effluent standards, state variations (CETESB), DAF/MBR design specs, and 2026 compliance steps.

Suspended Solids Discharge Limit in Brazil 2026: CONAMA 430/2011 Compliance & Treatment Design Guide

Lead Discharge Limit Vietnam 2026: QCVN Standards & Compliance Guide

Published: Jul 24, 2026

Lead discharge limit Vietnam 2026: QCVN 40:2011/BTNMT and QCVN 24:2016/BTNMT set 0.1–0.5 mg/L for industrial effluent. Engineering guide with treatment options.

Lead Discharge Limit Vietnam 2026: QCVN Standards & Compliance Guide

Chromium Discharge Standard 2026: Global Limits, Treatment Tech & Compliance

Published: Jul 24, 2026

2026 chromium discharge standard for industrial wastewater — Cr(VI) ≤0.05–1 mg/L and total Cr limits by region, plus removal tech and compliance steps.

Chromium Discharge Standard 2026: Global Limits, Treatment Tech & Compliance

Oil and Grease Discharge Limit in Indonesia 2026: Baku Mutu & Compliance Guide

Published: Jul 23, 2026

Oil and grease discharge limit in Indonesia 2026 under PP 22/2021 and Permen LHK 68/2016. Full baku mutu table, treatment design, and DAF sizing.

Oil and Grease Discharge Limit in Indonesia 2026: Baku Mutu & Compliance Guide

Zinc Discharge Limit South Africa 2026: NEMWA Standards & Compliance

Published: Jul 23, 2026

Zinc discharge limit South Africa 2026: NEMWA total Zn ≤5 mg/L into water, ≤25 mg/L irrigation, with treatment technology and engineering specs.

Zinc Discharge Limit South Africa 2026: NEMWA Standards & Compliance

Ammonia Nitrogen Discharge Limit Indonesia 2026: Standards & Compliance

Published: Jul 23, 2026

Complete 2026 guide to ammonia nitrogen discharge limits in Indonesia. Covers PP No. 22/2021, effluent thresholds by industry, and compliance engineering.

Ammonia Nitrogen Discharge Limit Indonesia 2026: Standards & Compliance

Fluoride Discharge Limit Vietnam 2026: QCVN Standards & Compliance

Published: Jul 23, 2026

Vietnam fluoride discharge limit in 2026 — QCVN 40:2011/BTNMT F⁻ thresholds by industry, monitoring requirements, and treatment options for compliance.

Fluoride Discharge Limit Vietnam 2026: QCVN Standards & Compliance

Paper Mill Wastewater Reuse Compliance 2026: Standards, Process & Cost Guide

Published: Jul 23, 2026

2026 guide to paper mill wastewater reuse compliance — EPA, EU and China discharge limits, treatment process design, CAPEX/OPEX data, and reuse strategies for pulp & paper mills.

Paper Mill Wastewater Reuse Compliance 2026: Standards, Process & Cost Guide

Chromium Discharge Limit 2026: EPA, EU & China Standards with Zero-Risk Compliance Guide

Published: Jul 22, 2026

2026 chromium discharge limits for industrial wastewater: EPA 0.1 mg/L total Cr, 0.05 mg/L Cr(VI); EU BAT-AEL 0.05–0.2 mg/L; China GB 21900-2008 0.5 mg/L. Avoid fines with engineering specs, cost models, and treatment process selection.

Chromium Discharge Limit 2026: EPA, EU & China Standards with Zero-Risk Compliance Guide

Vietnam QCVN Industrial Wastewater Standards: 2026 Compliance Guide

Published: Jul 22, 2026

QCVN 40:2011/BTNMT remains Vietnam's operative industrial wastewater table in 2026, with Column A COD/BOD₅/TSS at 50/10/50 mg/L and Column B at 100/50/100 mg/L. The 2020 Law and Decree 08/2022/ND-CP changed permits and monitoring around those ceilings. Sector overlays such as QCVN 13:2015 (textile) and QCVN 12:2015 (plating) still apply on top.

Vietnam QCVN Industrial Wastewater Standards: 2026 Compliance Guide

Meat Processing Effluent Discharge Permit Requirements: 2026 Compliance Guide

Published: Jul 22, 2026

2026 guide to meat processing effluent discharge permit requirements — EPA ELG update, FOG/BOD limits, sampling rules, and treatment equipment specs for compliance.

Meat Processing Effluent Discharge Permit Requirements: 2026 Compliance Guide

India CPCB Effluent Discharge Norms 2026: Engineering Guide

Published: Jul 22, 2026

India CPCB effluent discharge norms for 2026 set inland BOD ≤ 30 mg/L, COD ≤ 250 mg/L, TSS ≤ 100 mg/L, and oil & grease ≤ 10 mg/L under Schedule VI of the EPA Rules 1986. This engineering guide covers STP/ETP reuse bars, sector schedules, Cd/Ni caps, OCEMS uptime rules, consent timelines, and treatment-train design from DAF to MBR.

India CPCB Effluent Discharge Norms 2026: Engineering Guide

Petrochemical Wastewater Reuse Compliance in 2026: Standards, Treatment Trains & Engineering Checklist

Published: Jul 22, 2026

Petrochemical wastewater reuse compliance in 2026 — EPA, EU and China GB limits, MBR+RO treatment train design, recovery targets and zero-discharge engineering.

Petrochemical Wastewater Reuse Compliance in 2026: Standards, Treatment Trains & Engineering Checklist

Battery Manufacturing Wastewater Discharge Standard: 2026 Engineering Guide

Published: Jul 22, 2026

Complete 2026 guide to battery manufacturing wastewater discharge standards: US 40 CFR 461, EU BAT, China GB effluent limits, and lithium-ion process wastewater treatment design.

Battery Manufacturing Wastewater Discharge Standard: 2026 Engineering Guide

Oil and Grease Discharge Limit 2026: EPA, EU & China Standards

Published: Jul 21, 2026

Oil and grease discharge limits for 2026: EPA, EU, China GB and POTW thresholds, FOG pretreatment methods, DAF design specs, and compliance checklist.

Oil and Grease Discharge Limit 2026: EPA, EU & China Standards
AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us