Hospital Wastewater Treatment for a 60-Bed Dialysis Centre: 30 m³/day MBR Case Study (2026)
Delivered project, West Africa: 30 m³/day dialysis-centre wastewater, 3.75 m³/h peak, up to 5 mg/L residual chlorine. MBR with equalisation and dechlorination.
Containerised MBR for a 5,000 PE Residential Development: Capacity, Container Count and Power (2026)
Delivered project, Middle East: containerised MBR for ~2,000 households (~5,000 PE). Design flow, biology, 1,740 m² membrane area, containers and power derived.
Emergency DAF for an Overloaded Truck-Stop Lagoon: 10,000 GPD FOG Interception (2026)
Delivered project, North America: DAF upstream of an overloaded truck-stop lagoon, ~10,000 US gal/day (~40 m³/day class). Why the lagoon was kept in service.
Baghouse for 900 °C Incinerator Gas at ~50 m³/min: Cooling Strategy and Media Selection (2026)
Delivered project, Southeast Asia: pulse-jet baghouse for 900 °C incinerator gas, ~50 m³/min class. Quench to ~180 °C, PTFE-membrane media, ~29 m² filter.
Packaged Plant for a 25,000 GPD Rural Subdivision: Peak Factors, I&I and State Permit Compliance (2026)
Delivered project, North America: packaged plant for a ~100-home rural subdivision, 25,000 GPD (~95 m³/day class). Peak-hour, I&I and state-permit design.