Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Textile wastewater.
A connected global library.

Explore country guides, wet processes and treatment research. Follow a connection to understand what it means — and where it comes from.

45 countries116 textile-tagged guide associations2 research dossiers · snapshot 2026-10-13

Latest sourced developments

Source record updated: 2026-11-20T07:23:28+00:00

AI briefs of source reports; these do not replace measured influent or applicable discharge permits.

Pakistan

The study examines the characterization and treatment of wastewater from Pakistan’s sapphire textile industry.

Published in our library: · Original report ↗

Source excerpt
Characterization and Treatment of Wastewater from Sapphire Textile Industry, Pakistan
HydropureWater ↗

Engineering and regulatory facts require separate verification.

China

Research in China examined how textile dyeing exporters around Lake Tai adapted to tighter wastewater standards in Jiangsu.

Published in our library: · Original report ↗

Source excerpt
I studied how Chinese textile exporters responded when environmental regulations became more stringent, using a change in wastewater standards in Jiangsu province as a natural experiment.. The setting was Lake Tai, one of China’s largest freshwater lakes and the centre of the country’s dyeing industry. Textile dyeing produces heavily polluted wastewater, and by the 2000s the lake was extremely polluted.. In 2005, Jiangsu province responded by tightening the wastewater standard for dyeing firms around the lake.
HydropureWater ↗

Engineering and regulatory facts require separate verification.

China

China's GB 4287-2026 standard requires certain dyeing and finishing facilities to pass a fish embryo toxicity test on treated wastewater, effective Sept. 1 for new facilities and Jan. 1, 2028 for existing ones.

Published in our library: · Original report ↗

Source excerpt
The country’s new textile discharge standard adds a requirement for certain dyeing and finishing operations to demonstrate that fish embryos can survive exposure to their treated wastewater, introducing a biological check alongside existing chemical limits.. The standard, GB 4287-2026, took effect Sept. 1 for new, rebuilt and expanded facilities. Existing facilities must comply from Jan. 1, 2028, though provincial governments may approve an earlier rollout. Published jointly by China’s Ministry of Ecology and Environment and the State Administration for Market Regulation, it replaces four 2012 standards covering dyeing and finishing, silk reeling, wool and hemp.. The test uses newly fertilized zebrafish eggs exposed for 48 hours to a sample diluted to one-sixth of the test solution. At least 90 percent must survive at approximately 79 degrees Fahrenheit, according to the standard.
HydropureWater ↗

Engineering and regulatory facts require separate verification.

Textile solutions ↗
COUNTRY LIBRARIESWET PROCESSESWASTEWATERTREATMENT RESEARCHDesizing is a wet-processing step of textile manufacturingBleaching is a wet-processing step of textile manufacturingMercerizing is a wet-processing step of textile manufacturingDyeing is a wet-processing step of textile manufacturingPrinting is a wet-processing step of textile manufacturingDyeing effluent carries residual dyestuff and visible colourDyeing effluent carries high COD loadAdvanced oxidation removes colour and COD from dyeing effluentAdvanced oxidation reduces COD in dyeing effluent20 textile-tagged guides in the country library10 textile-tagged guides in the country library5 textile-tagged guides in the country library5 textile-tagged guides in the country library5 textile-tagged guides in the country library4 textile-tagged guides in the country library4 textile-tagged guides in the country library4 textile-tagged guides in the country library4 textile-tagged guides in the country library3 textile-tagged guides in the country library3 textile-tagged guides in the country library3 textile-tagged guides in the country libraryTextile & dyeingTextile & dyeingINDUSTRYDesizingDesizingWET PROCESSBleachingBleachingWET PROCESSMercerizingMercerizingWET PROCESSDyeingDyeingWET PROCESSPrintingPrintingWET PROCESSColour & dyesColour & dyesWASTEWATERCOD loadCOD loadWASTEWATERAdvanced oxidationOzone / FentonRESEARCHIndiaIndia20PakistanPakistan10BangladeshBangladesh5MoroccoMorocco5NigeriaNigeria5IndonesiaIndonesia4IranIran4PeruPeru4UgandaUganda4MexicoMexico3ThailandThailand3TurkeyTurkey3
Guide coverageResearch relationshipsClick a node or connection

What the evidence says.

These results belong to a laboratory study on real textile dyeing effluent. They are shared research references, not national wastewater values or equipment performance guarantees.

ParameterReported valueConditions
Colour removal89.17 %RSM-optimised ozonation-Fenton on real textile dyeing effluent (lab)
COD removal82.52 %Same experiment as colour removal
COD and color removal from real textile dyeing effluent using ...

…optimum RSM-predicted color and COD removal efficiencies of 89.17%, and 82.52%…

Same experiment: COD removal 82.52%

Read original source ↗

Reviewed 2026-10-13

From research to equipment.

Catalogue links and delivered records provide engineering context. Selection requires your actual flow, water quality and discharge target.

All 45 country libraries · direct links
India 20 guidesPakistan 10 guidesBangladesh 5 guidesMorocco 5 guidesNigeria 5 guidesIndonesia 4 guidesIran 4 guidesPeru 4 guidesUganda 4 guidesMexico 3 guidesThailand 3 guidesTurkey 3 guidesVietnam 3 guidesAngola 2 guidesEcuador 2 guidesEgypt 2 guidesEthiopia 2 guidesGhana 2 guidesPanama 2 guidesPhilippines 2 guidesSri Lanka 2 guidesTanzania 2 guidesTurkmenistan 2 guidesUzbekistan 2 guidesArgentina 1 guidesAustralia 1 guidesBolivia 1 guidesCambodia 1 guidesCameroon 1 guidesDominican Republic 1 guidesIsrael 1 guidesJordan 1 guidesKenya 1 guidesKuwait 1 guidesMozambique 1 guidesMyanmar 1 guidesNepal 1 guidesNew Zealand 1 guidesPortugal 1 guidesQatar 1 guidesRwanda 1 guidesSouth Africa 1 guidesSouth Korea 1 guidesUnited Arab Emirates 1 guidesUnited States 1 guides

Library snapshot 2026-10-13 · Research release 20261014T184750-fff2d02345ed

Compare country evidence

Different sites and study years; not a ranking of national water quality.

Observed rangePakistan →Bangladesh →
pH6.86–6.947.48–8.75
COD189–287 mg/L972–1420 mg/L
BOD5No value reported276–425 mg/L
TSS119–376 mg/L115–262 mg/L
TDS1834–1923 mg/L2774–4228 mg/L

Ranges use central reported sample values; uncertainty is shown in each dossier. Documentation, not a plant design basis.

Pakistan: Sampling date not reported; study 2015

Bangladesh: 2017-07 (mid-July); study 2018

Textile — water evidence database

Public guides, reported developments and reviewed evidence. Counts describe this library’s coverage.

Explore relationships
Partial: confirmed material onlyPartial coveragePublic snapshot · UTC+8

Related guides
353
Reported events
3
Reviewed facts
38
Published dossiers
2
Independent sources
5

Guides are article candidates, events are source-supported reports, and facts are reviewed records. Countries and industries overlap; grouped counts cannot be added into a global total.

Country × industry coverage

Select a cell to inspect its records. Coverage measures published material, never market size, factories or local project volume.

Related guides · more published material
Select a cell to inspect its records. Coverage measures published material, never market size, factories or local project volume.
CountryTextileFood & BeverageChemical ManufacturingPharmaceutical ManufacturingOil & GasMunicipal Wastewater
Algeria13—116
Angola33—115
Argentina1511—5
Australia24—1121
Azerbaijan———1——
Bahrain1111—6
Bangladesh101—2—5
Bolivia1—————
Brazil1511119
Burkina Faso—1————
Cambodia22—1—6
Cameroon23—1—4
Canada252——27
Chile13—1—6
China5111—1
Colombia14—1—7
Costa Rica11—1—2
Cyprus—————1
Czech Republic—1———2
Denmark—2—1—1
Dominican Republic2211—4
Ecuador1321—5
Egypt420108
El Salvador—————1
Ethiopia33—1—1
Fiji—1———1
Finland—1———1
France1311—8
Germany13—3—7
Ghana23—1—6
Greece—1———1
Hungary—2————
India341745—51
Indonesia11641—15
Iran645118
Iraq131128
Ireland—3———2
Israel11———5
Italy13—1—4
Ivory Coast11—1—4
Japan1111—1
Jordan21—1—6
Kazakhstan11—115
Kenya43—113
Kuwait133—27
Lebanon————1—
Malaysia16—3—16
Mexico4513—17
Mongolia11———1
Montenegro—1————
Morocco6311—9
Mozambique31—1—6
Myanmar2111—5
Namibia—————1
Nepal32—1—1
Netherlands12———2
New Zealand—2———2
Nigeria553117
Norway11———2
Oman223136
Pakistan12330—12
Panama342115
Peru54—1—6
Philippines3321—14
Poland11—1—3
Portugal12———1
Qatar2321—6
Romania—1———2
Russia—211—1
Rwanda2211—3
Saudi Arabia1741215
Senegal2111—4
Singapore11—1—2
South Africa23—1—13
South Korea21———5
Spain13—1—3
Sri Lanka321——2
Sweden11—1—1
Syria—————1
Tajikistan—————1
Tanzania14—1—1
Thailand47—1—10
Turkey4211—1
Turkmenistan31—1—3
Uganda55—1—5
Ukraine—————1
United Arab Emirates232119
United Kingdom1311—20
United States212984213824864
Uzbekistan41—1—4
Vietnam5313—13

A dash means coverage is unknown or unconnected. A verified zero is shown only when the metric scope is known.

Daily public additions

First verified public appearance in this library, by UTC+8 day. Source publication dates do not create historical growth.

Reported eventsReviewed factsPublished dossiersRelated guides
—
—
—
—
—
—
—
—

History is accumulating. Missing or failed days remain gaps; a single snapshot cannot establish a trend. Historical baseline and backfill are labelled separately.

Inspect recorded days and changes
Day (UTC+8)Coverage statusnew recordsHistorical backfillRevisedWithdrawnRestored
2026-10-15Partial: confirmed material only—0000
2026-10-16Partial: confirmed material only20000
2026-10-17Partial: confirmed material only60000
2026-10-18Partial: confirmed material only10000
2026-10-19Partial: confirmed material only—0000
2026-10-20Partial: confirmed material only40000
2026-10-21Partial: confirmed material only10000
2026-10-22Partial: confirmed material only—0000
2026-10-23Partial: confirmed material only—0000
2026-10-24Partial: confirmed material only—0000
2026-10-25Partial: confirmed material only10000
2026-10-26Partial: confirmed material only21100
2026-10-27Partial: confirmed material only10000
2026-10-28Partial: confirmed material only40000
2026-10-29Partial: confirmed material only30000
2026-10-30Partial: confirmed material only20000
2026-10-31Partial: confirmed material only10000
2026-11-01Partial: confirmed material only20000
2026-11-02Partial: confirmed material only10000
2026-11-03Partial: confirmed material only20000
2026-11-04Partial: confirmed material only—0000
2026-11-05Partial: confirmed material only10000
2026-11-06Partial: confirmed material only—0000
2026-11-07Partial: confirmed material only—0000
2026-11-08Partial: confirmed material only—0000
2026-11-09Partial: confirmed material only10000
2026-11-10Partial: confirmed material only10000
2026-11-11Partial: confirmed material only10000
2026-11-12Partial: confirmed material only—0000
2026-11-13Partial: confirmed material only10000
2026-11-14Partial: confirmed material only10000
2026-11-15Partial: confirmed material only10000
2026-11-16Partial: confirmed material only—0000
2026-11-17Partial: confirmed material only10000
2026-11-18Partial: confirmed material only40000
2026-11-19Partial: confirmed material only40000
2026-11-20Partial: confirmed material only31000
2026-11-21Partial: confirmed material only20000
2026-11-22Partial: confirmed material only—0000
2026-11-23Partial: confirmed material only—0000

Current sources and reviewed facts

Two separate stocks at the published watermark. No historical stock line is reconstructed from article dates.

Current snapshot only
Independent sources5
Reviewed facts38

Record explorer

Inspect the records behind the selected coverage or day. Source links open the original publisher.

Record typeRecordCountryFirst public verificationEvidence
Guide candidateTextile Park Sewage Treatment: Package Plant or MBR?English source titleEthiopia2026-11-21 15:32Open the record for its evidence
Guide candidateMBR for Printing and Dyeing Wastewater: Treatment Train DecisionsEnglish source titleCountry scope not reported2026-11-21 15:32Open the record for its evidence
Guide candidateTextile Wastewater Treatment in Costa Rica: 2026 GuideEnglish source titleCosta Rica2026-11-20 15:24Open the record for its evidence
Guide candidateTextile Wastewater Treatment in Pakistan: Equipment Selection GuideEnglish source titlePakistan2026-11-20 15:24Open the record for its evidence
Guide candidatePlate Frame Filter Press for Textiles: Selection CriteriaEnglish source titleCountry scope not reported2026-11-19 15:35Open the record for its evidence
Guide candidateBelt Filter Press Selection for Textile Wastewater SludgeEnglish source titleCountry scope not reported2026-11-19 15:35Open the record for its evidence
Guide candidateScrew Press Dewatering for Textiles: Equipment Selection GuideEnglish source titleCountry scope not reported2026-11-19 15:35Open the record for its evidence
Guide candidateTextile Wastewater Treatment Equipment for Bangladesh FactoriesEnglish source titleBangladesh2026-11-19 15:35Open the record for its evidence
Guide candidateTextile Wastewater Pretreatment for Auburn Sewer ComplianceEnglish source titleUnited States2026-11-18 16:36Open the record for its evidence
Guide candidateTextile Wastewater Treatment in the Dominican Republic: 2026 GuideEnglish source titleDominican Republic2026-11-18 16:36Open the record for its evidence
Guide candidateDAF Systems for Printing and Dyeing Wastewater: 2026 GuideEnglish source titleCountry scope not reported2026-11-18 16:36Open the record for its evidence
Guide candidateFilter Press for Printing and Dyeing Wastewater: 2026 GuideEnglish source titleCountry scope not reported2026-11-18 16:36Open the record for its evidence

Related guides

Technical and news articles provide reading paths and candidate associations; they do not prove a local project or reviewed fact.

More country-specific reading is available through the country links in the coverage table.

Recent reported developments

Source publication and first public verification are separate dates. Reported developments remain observations.

Source published

The study examines the characterization and treatment of wastewater from Pakistan’s sapphire textile industry.

Inspect original excerpt
Characterization and Treatment of Wastewater from Sapphire Textile Industry, Pakistan
Original source

First public verification: 2026-11-20 15:24

Source published

Research in China examined how textile dyeing exporters around Lake Tai adapted to tighter wastewater standards in Jiangsu.

Inspect original excerpt
I studied how Chinese textile exporters responded when environmental regulations became more stringent, using a change in wastewater standards in Jiangsu province as a natural experiment.. The setting was Lake Tai, one of China’s largest freshwater lakes and the centre of the country’s dyeing industry. Textile dyeing produces heavily polluted wastewater, and by the 2000s the lake was extremely polluted.. In 2005, Jiangsu province responded by tightening the wastewater standard for dyeing firms around the lake.
Original source

First public verification: 2026-10-26 15:04

Source published

China's GB 4287-2026 standard requires certain dyeing and finishing facilities to pass a fish embryo toxicity test on treated wastewater, effective Sept. 1 for new facilities and Jan. 1, 2028 for existing ones.

Inspect original excerpt
The country’s new textile discharge standard adds a requirement for certain dyeing and finishing operations to demonstrate that fish embryos can survive exposure to their treated wastewater, introducing a biological check alongside existing chemical limits.. The standard, GB 4287-2026, took effect Sept. 1 for new, rebuilt and expanded facilities. Existing facilities must comply from Jan. 1, 2028, though provincial governments may approve an earlier rollout. Published jointly by China’s Ministry of Ecology and Environment and the State Administration for Market Regulation, it replaces four 2012 standards covering dyeing and finishing, silk reeling, wool and hemp.. The test uses newly fertilized zebrafish eggs exposed for 48 hours to a sample diluted to one-sixth of the test solution. At least 90 percent must survive at approximately 79 degrees Fahrenheit, according to the standard.
Original source

First public verification: Not reported

Comparable water samples

Compare only matching parameter, unit, water stage and scope. Individual facility samples never represent a national average or a continuous water-quality trend.

No group of at least two comparable, reviewed samples is available. Read individual evidence in the published dossiers.

Move from evidence to a treatment discussion

Carry the selected country and industry into your enquiry. Confirm influent conditions, discharge destination and operating scope with the engineering team.

Snapshot scope and provenance
Version
6889d751e1e7198767137ede85034e787f2a1257a51e3d0c0dbe40b87dea5d5f
Industry classification version
2026-10-15.1
Reviewed foundation version
20261015T105811-e19facf957c3
Observation version
ec4063e1203c11f4cde1b0b0cd605ff1e4a88de125a6bddfeabba96dafe156a0
Public coverage watermark
b13e9e980ea1373beb87c0d4c5b5337690ad0b30d73553a4a0e8129d8ec1d961
Historical baseline cutoff
Not reported

Only caller-frozen public records are counted. Language versions and revisions share a record identity; source versions share the independent source identity.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us