Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Blog & Industry Insights

Looking for guides for a specific country? Browse wastewater treatment guides by country →

Morocco sets 1.8 billion m³ desalination target for 2031

Published: Nov 18, 2026

Morocco announced a national water-security strategy on 11 November 2026 targeting nearly 1.8 billion cubic meters of annual desalination capacity by 2031, intended to cover 60% of the country’s drinking-water needs. The program includes plants in Nador, Driouch, Tangier, Tiznit, Tan-Tan, Guelmim and Rabat, plus an expansion of Chtouka Aït Baha. It also targets more treated wastewater for reuse, but the report provides no site-level wastewater flows, treatment specifications, procurement packages or delivery schedules. Plant buyers must therefore obtain flow and quality data before defining treatment scope.

Morocco sets 1.8 billion m³ desalination target for 2031

Malaysia targets 87.8% sewerage coverage in 13 cities, Nov 2026

Published: Nov 18, 2026

Malaysia’s Energy Transition and Water Transformation Ministry set a target on 17 November 2026 for 87.8 per cent connected sewerage coverage across 13 major cities. The government also plans to rationalise 418 ageing and small-scale public sewage treatment plants into modern regional systems. Its public sewerage asset portfolio was valued at RM22.69 billion as of October 2026, while RM16.19 billion in project costs has been allocated under Rolling Plan 1 of the 13th Malaysia Plan. For plant operators and equipment buyers, the programme points to demand for rehabilitation, capacity expansion, treatment upgrades, regional consolidation, stronger effluent monitoring and preventive maintenance.

Malaysia targets 87.8% sewerage coverage in 13 cities, Nov 2026

EPA reports daily raw sewage in 11 Irish towns, Nov 2026

Published: Nov 18, 2026

On 4 November 2026, Ireland’s Environmental Protection Agency reported that raw sewage was being discharged daily from 11 towns and villages because their sewers were not connected to treatment plants, affecting a population equivalent of around 15,000. The EPA also found that 55% of 505 licensed plants failed pollution-prevention standards. Treatment projects were under construction at two sites, due to begin shortly at a third, and remained in design and planning at eight. Operators and buyers should assess site-specific flow, effluent requirements, deployment schedules and the balance between infrastructure renewal and operational controls.

EPA reports daily raw sewage in 11 Irish towns, Nov 2026

EPA finds over half of Irish wastewater plants fail standards

Published: Nov 18, 2026

On 4 November 2026, Ireland’s Environmental Protection Agency reported that some 55% of the country’s wastewater treatment plants failed regulatory standards. The EPA attributed half of the failures to inadequate operation and maintenance, identified 72 priority areas requiring urgent action, and reported continuing harm to rivers, estuaries, lakes and coastal waters. Eleven towns and villages continued discharging raw sewage daily in 2025. For plant operators and buyers, the findings indicate immediate pressure to address maintenance, operational controls and infrastructure deficiencies, while site-specific flow, load and capacity data will be needed to scope corrective works.

EPA finds over half of Irish wastewater plants fail standards

Google funds RM651M Negeri Sembilan water project, Nov 2026

Published: Nov 18, 2026

In a report published on 4 November 2026, Google committed $160 million, approximately RM651 million, to shared water infrastructure in Malaysia’s Negeri Sembilan state. The project includes an off-river reservoir and a treatment plant designed to supply 65 million litres of potable water daily for local users and Google’s planned Port Dickson data centre. Gamuda Berhad will construct the facilities, which are to be owned by MBINS. For plant operators and buyers, the capacity, public-supply allocation, treatment configuration and delivery timetable are the key scoping inputs; the supplied reports do not provide all of those details.

Google funds RM651M Negeri Sembilan water project, Nov 2026

TSMC Texas Fab Wastewater: Compliance and Treatment Guide

Published: Nov 18, 2026

A 2026 engineering guide to handling wastewater for a TSMC Texas fab, covering permits, stream segregation, pretreatment, audit readiness, and reuse.

TSMC Texas Fab Wastewater: Compliance and Treatment Guide

Pharmaceutical Wastewater Treatment in Germany: 2026 Guide

Published: Nov 18, 2026

Compare biological, membrane, oxidation and reuse systems for pharmaceutical wastewater treatment in Germany, with a seven-step site selection framework.

Pharmaceutical Wastewater Treatment in Germany: 2026 Guide

Data Center Wastewater Treatment in Binh Thanh: 2026 Guide

Published: Nov 18, 2026

Engineering guidance for treating cooling blowdown, commissioning wastewater and sanitary flow at a Binh Thanh data center, with equipment and compliance steps.

Data Center Wastewater Treatment in Binh Thanh: 2026 Guide

Pulp and Paper Pretreatment for Houston Sewer Discharges

Published: Nov 18, 2026

Learn how Houston-area pulp and paper mills reduce solids, BOD, color and other pollutants before indirect discharge to a municipal sewer.

Pulp and Paper Pretreatment for Houston Sewer Discharges

DAF vs. Clarifier for Food & Beverage Wastewater in 2026

Published: Nov 18, 2026

Compare DAF and clarifiers for food and beverage wastewater, including FOG removal, energy use, sizing, pilot testing, and supplier selection.

DAF vs. Clarifier for Food & Beverage Wastewater in 2026

High-COD Trade Wastewater Treatment in Almaty: 2026 Guide

Published: Nov 18, 2026

Learn how Almaty manufacturers treat high-COD trade waste using DAF, biological treatment and MBR, with 2026 discharge limits, costs and design guidance.

High-COD Trade Wastewater Treatment in Almaty: 2026 Guide

Belt Filter Presses for Airport Wastewater: 2026 Guide

Published: Nov 18, 2026

Compare belt filter presses for airport wastewater sludge, covering process fit, pretreatment, sizing inputs, operation, maintenance and procurement decisions.

Belt Filter Presses for Airport Wastewater: 2026 Guide

TSMC Hungary Fab Wastewater Treatment and ETP Guide

Published: Nov 18, 2026

Learn how TSMC should handle wastewater when expanding a fab in Hungary under IED, BAT-AEL, PFAS and Danube Basin requirements.

TSMC Hungary Fab Wastewater Treatment and ETP Guide

Rural Sewage Treatment Equipment for Germany: 2026 Guide

Published: Nov 18, 2026

Compare package sewage treatment systems and MBR options for rural Germany, including process selection, sizing, compliance and procurement questions.

Rural Sewage Treatment Equipment for Germany: 2026 Guide

Data Center Wastewater Treatment in Muntinlupa: 2026 Guide

Published: Nov 18, 2026

Engineering guide for cooling blowdown and wastewater treatment in Muntinlupa, Philippines, covering streams, treatment trains, permits, reuse, and costs.

Data Center Wastewater Treatment in Muntinlupa: 2026 Guide

Fabricated Metals Wastewater Pretreatment: 2026 Compliance Guide

Published: Nov 18, 2026

Learn how fabricated metals plants near Cranberry Township meet sewer pretreatment limits through pretreatment, monitoring, sampling, and engineered treatment systems.

Fabricated Metals Wastewater Pretreatment: 2026 Compliance Guide

DAF vs. Lamella Clarifier for Mining Wastewater in 2026

Published: Nov 18, 2026

Compare DAF and lamella clarifiers for Cleveland mining and metals plants, with a stream-by-stream selection framework for 2026.

DAF vs. Lamella Clarifier for Mining Wastewater in 2026

Amman Trade Wastewater Treatment for High-COD Effluent

Published: Nov 18, 2026

See how Amman manufacturers characterize, pretreat and reduce high-COD trade waste in 2026, with practical DAF and biological treatment guidance.

Amman Trade Wastewater Treatment for High-COD Effluent

Belt Filter Presses for Hotel Wastewater: 2026 Selection Guide

Published: Nov 18, 2026

Learn how belt filter presses dewater hotel wastewater sludge, compare equipment options, size the system, and plan for operation, maintenance, and disposal.

Belt Filter Presses for Hotel Wastewater: 2026 Selection Guide

TSMC Germany Fab Wastewater Treatment: 2026 ETP Guide

Published: Nov 18, 2026

A practical 2026 guide to wastewater treatment for TSMC's German fab expansion, covering permits, pretreatment, sewer limits and reuse design.

TSMC Germany Fab Wastewater Treatment: 2026 ETP Guide

Hotel and Resort Wastewater Treatment Systems in Germany

Published: Nov 18, 2026

Compare decentralized wastewater treatment systems for German hotels and resorts, including MBR, WSZ, treatment flows, sizing inputs, compliance and reuse considerations.

Hotel and Resort Wastewater Treatment Systems in Germany

Cooling Blowdown Treatment for Data Centers in Balbala

Published: Nov 18, 2026

Learn how a Balbala data center should treat cooling blowdown, sanitary wastewater, oily wash water and generator coolant in 2026.

Cooling Blowdown Treatment for Data Centers in Balbala

Mining and Metals Wastewater Pretreatment for Sewer Discharge

Published: Nov 18, 2026

Learn how mining and metals plants near Hammondville establish pretreatment limits and design compliant wastewater treatment before sewer discharge.

Mining and Metals Wastewater Pretreatment for Sewer Discharge

DAF vs. Clarifiers for Mining Wastewater: 2026 Guide

Published: Nov 18, 2026

Compare DAF and clarifiers for mining and metals wastewater in Fallon, including solids separation, chemical conditioning, sizing and treatment-train selection.

DAF vs. Clarifiers for Mining Wastewater: 2026 Guide

Tokyo High-COD Trade Waste Treatment: 2026 Equipment Guide

Published: Nov 18, 2026

See how Tokyo manufacturers treat high-COD trade waste in 2026 using DAF, MBR, biological and membrane-based treatment trains.

Tokyo High-COD Trade Waste Treatment: 2026 Equipment Guide

Belt Filter Press for Hospital Wastewater: 2026 Sizing, Compliance & Technology Guide

Published: Nov 18, 2026

Engineering guide to selecting belt filter presses for hospital wastewater sludge — sizing, polymer dosing, pathogen kill, footprint constraints, and plate & frame alternatives.

Belt Filter Press for Hospital Wastewater: 2026 Sizing, Compliance & Technology Guide

TSMC Mexico Fab Wastewater Treatment: 2026 Engineering Guide

Published: Nov 18, 2026

How should TSMC handle wastewater for a new Mexican fab? Compare pretreatment, reclamation, reuse and compliance strategies for semiconductor facilities.

TSMC Mexico Fab Wastewater Treatment: 2026 Engineering Guide

Domestic Sewage Treatment Equipment for Germany: 2026 Guide

Published: Nov 18, 2026

Compare package plants, MBR systems and decentralized sewage treatment equipment for German projects, with capacity, process and compliance guidance.

Domestic Sewage Treatment Equipment for Germany: 2026 Guide

Benguela Data Center Wastewater Treatment: 2026 Guide

Published: Nov 18, 2026

Engineering guide for Benguela data centers: segregate, treat and discharge cooling blowdown, sanitary wastewater and other site-specific water streams.

Benguela Data Center Wastewater Treatment: 2026 Guide

Metal Finishing Wastewater Pretreatment Limits in Seattle, 2026

Published: Nov 18, 2026

See how Seattle-area metal fabricators meet sewer pretreatment limits through pretreatment design, treatment steps, monitoring, and permit review.

Metal Finishing Wastewater Pretreatment Limits in Seattle, 2026
AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us