Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Wastewater Treatment in India

India is covered by 531 guides on this site — most recently updated Nov 3, 2026. Each guide combines local discharge standards, engineering specs and cost benchmarks for industrial and municipal wastewater projects.

Industrial Wastewater Treatment in Ahmedabad: 2026 Process, Cost & Compliance Guide

Published: Aug 11, 2026

2026 industrial wastewater treatment in Ahmedabad — GPCB discharge limits, treatment process selection, CAPEX/OPEX benchmarks, and equipment checklist for Gujarat factories.

Industrial Wastewater Treatment in Ahmedabad: 2026 Process, Cost & Compliance Guide

Cyanide Discharge Limit in India 2026: CPCB & SPCB Standards Guide

Published: Aug 10, 2026

Complete 2026 guide to cyanide discharge limits in India — CPCB/EPA 1986 norms, total vs free cyanide, industry-specific SPCB standards, and treatment solutions.

Cyanide Discharge Limit in India 2026: CPCB & SPCB Standards Guide

Microplastics Discharge Limit in India: 2026 CPCB & BIS Standards

Published: Aug 7, 2026

India has no numerical microplastics discharge limit in particles/L or mg/L for industrial effluent as of 2026. BIS IS 4707 (Part 2):2017 Amendment No. 2 bans plastic microbeads in rinse-off cosmetic…

Microplastics Discharge Limit in India: 2026 CPCB & BIS Standards

Sewage Treatment Equipment Supplier in Uttar Pradesh, India: 2026 Buyer's Guide

Published: Aug 7, 2026

Find a sewage treatment equipment supplier in Uttar Pradesh, India for 2026. Compare Indian vs Chinese OEMs, CPCB costs (₹12L–₹4.5Cr), MBR/SBR/DAF specs, and NMCG compliance.

Sewage Treatment Equipment Supplier in Uttar Pradesh, India: 2026 Buyer's Guide

Hospital Wastewater Treatment in Faridabad: 2026 Compliance & Process Guide

Published: Aug 7, 2026

Hospital wastewater treatment in Faridabad for 2026 — CPCB effluent limits, MBR+ClO₂ process design, costs, and how to meet BMW discharge rules.

Hospital Wastewater Treatment in Faridabad: 2026 Compliance & Process Guide

Phenol Discharge Limit in India: 2026 CPCB Compliance & Treatment Guide

Published: Aug 6, 2026

Phenol discharge limit in India for 2026: CPCB effluent standards (1.0–5.0 mg/L), sector-specific norms, and proven treatment technologies explained for ETP designers.

Phenol Discharge Limit in India: 2026 CPCB Compliance & Treatment Guide

Industrial Wastewater Treatment in India 2026: Costs, CPCB Rules & Equipment Guide

Published: Aug 4, 2026

Industrial wastewater treatment in India 2026: CPCB discharge limits, ZLD mandates, CAPEX/OPEX by industry, and equipment selection for textile, pharma, and chemical plants.

Industrial Wastewater Treatment in India 2026: Costs, CPCB Rules & Equipment Guide

BOD Discharge Limit in India CPCB 2026: Compliance Guide

Published: Aug 2, 2026

India's inland surface water BOD discharge limit remains 30 mg/L BOD₅ at 20°C under Schedule-I of the EP Rules, 1986, with 350 mg/L for public sewers and 100 mg/L for marine and land disposal. CPCB s…

BOD Discharge Limit in India CPCB 2026: Compliance Guide

Oil and Grease Discharge Limit in India: 2026 CPCB/SPCB Standards & Compliance Guide

Published: Aug 2, 2026

Oil and grease discharge limits in India for 2026 — CPCB effluent standards, SPCB state variations, industry-specific norms, and DAF treatment specs.

Oil and Grease Discharge Limit in India: 2026 CPCB/SPCB Standards & Compliance Guide

Municipal Sewage Treatment Plant in Punjab India: 2026 Engineering Guide

Published: Aug 1, 2026

Municipal sewage treatment plant in Punjab India: 2026 CPCB/PPCB effluent norms, MBR vs SBR vs ASP design specs, CAPEX benchmarks, and supplier selection guide.

Municipal Sewage Treatment Plant in Punjab India: 2026 Engineering Guide

Hospital Wastewater Treatment in Delhi: 2026 Compliance & Process Guide

Published: Aug 1, 2026

Hospital wastewater treatment in Delhi for 2026 — CPCB discharge limits, process train design, costs, and equipment selection for hospitals and clinics.

Hospital Wastewater Treatment in Delhi: 2026 Compliance & Process Guide

Municipal Sewage Treatment Plant in Maharashtra India: 2026 Compliance & Engineering Guide

Published: Jul 30, 2026

Municipal sewage treatment plant in Maharashtra India — 2026 MPCB/CPCB discharge limits, STP process design, costs, and supplier selection framework for engineers.

Municipal Sewage Treatment Plant in Maharashtra India: 2026 Compliance & Engineering Guide

Total Nitrogen Discharge Limit in India 2026: CPCB Standards & Treatment Guide

Published: Jul 30, 2026

Total nitrogen discharge limit in India 2026 — CPCB & State PCB standards (10–100 mg/L TN), industry-specific limits, MBBR/MBR treatment design, and compliance costs.

Total Nitrogen Discharge Limit in India 2026: CPCB Standards & Treatment Guide

Color Discharge Limit in India: 2026 CPCB Standards & Treatment Guide

Published: Jul 29, 2026

Color discharge limit in India under CPCB Schedule VI Part A is 400 Pt-Co for inland surface water unless a sector or CTO sets a tighter value. Textile CTOs commonly require 100–150 Pt-Co; CETP inlet…

Color Discharge Limit in India: 2026 CPCB Standards & Treatment Guide

Hospital Wastewater Treatment in Gujarat India: 2026 Compliance & Process Guide

Published: Jul 27, 2026

Hospital wastewater treatment in Gujarat India: 2026 GPCB discharge limits, MBR vs ozone vs MBBR process comparison, and equipment costs for 200-2,000 bed hospitals.

Hospital Wastewater Treatment in Gujarat India: 2026 Compliance & Process Guide

Industrial Wastewater Treatment in Pune 2026: Process, Cost & Compliance Guide

Published: Jul 22, 2026

Industrial wastewater treatment in Pune for 2026: MPCB discharge limits, treatment process selection, CAPEX/OPEX benchmarks, and vetted equipment supplier checklist.

Industrial Wastewater Treatment in Pune 2026: Process, Cost & Compliance Guide

India CPCB Effluent Discharge Norms 2026: Engineering Guide

Published: Jul 22, 2026

India CPCB effluent discharge norms for 2026 set inland BOD ≤ 30 mg/L, COD ≤ 250 mg/L, TSS ≤ 100 mg/L, and oil & grease ≤ 10 mg/L under Schedule VI of the EPA Rules 1986. This engineering guide cover…

India CPCB Effluent Discharge Norms 2026: Engineering Guide

Industrial Wastewater Treatment in Hyderabad: 2026 Engineering Guide

Published: Jul 22, 2026

Industrial wastewater treatment in Hyderabad for 2026: TSPCB/CPCB discharge limits, process design, equipment specs, and CAPEX/OPEX benchmarks for pharma, textile, and food sectors.

Industrial Wastewater Treatment in Hyderabad: 2026 Engineering Guide

Municipal Sewage Treatment Plant in Jharkhand India: 2026 Engineering & Compliance Guide

Published: Jul 21, 2026

Engineering guide to municipal sewage treatment plants in Jharkhand, India — 2026 capacity gap, NMCG/NGT compliance, CAPEX/OPEX benchmarks, and STP technology selection.

Municipal Sewage Treatment Plant in Jharkhand India: 2026 Engineering & Compliance Guide

Total Phosphorus Discharge Limit in India: 2026 CPCB & State PCB Compliance Guide

Published: Jul 20, 2026

India's 2026 total phosphorus discharge limits by CPCB, state PCB, industry sector & consent category. Effluent values, analytical methods & treatment guidance.

Total Phosphorus Discharge Limit in India: 2026 CPCB & State PCB Compliance Guide

Industrial Wastewater Treatment in Noida 2026: Process, Cost & Compliance Guide

Published: Jul 19, 2026

Industrial wastewater treatment in Noida 2026: UPPCB effluent norms, process selection, CAPEX/OPEX data, and equipment checklist for plant owners.

Industrial Wastewater Treatment in Noida 2026: Process, Cost & Compliance Guide

Hospital Wastewater Treatment in Punjab, India: 2026 Compliance & Equipment Guide

Published: Jul 15, 2026

Complete 2026 guide to hospital wastewater treatment in Punjab, India. Covers PCB consent limits, MBR vs SBR design, CAPEX, and HydropureWater equipment specs.

Hospital Wastewater Treatment in Punjab, India: 2026 Compliance & Equipment Guide

CPCB Effluent Discharge Limits India: 2026 COD BOD Guide

Published: Jul 15, 2026

COD and BOD discharge limit standards cap organic strength in treated effluent before release. This guide compares the five binding frameworks — EPA 40 CFR Part 133, EU Directive 91/271/EEC, China GB…

CPCB Effluent Discharge Limits India: 2026 COD BOD Guide

Industrial Wastewater Treatment in Nagpur: 2026 Buyer's Guide

Published: Jul 14, 2026

Industrial wastewater treatment in Nagpur: 2026 MPCB consent limits, CAPEX ranges, technology selection, and zero-risk equipment specs for Vidarbha industries.

Industrial Wastewater Treatment in Nagpur: 2026 Buyer's Guide

Industrial Wastewater Treatment in Jharkhand 2026: Engineering Specs, Costs & Zero-Risk Compliance Guide

Published: Jul 11, 2026

Discover 2026 engineering specs, CAPEX (₹80L–₹12Cr), and zero-risk compliance strategies for industrial wastewater treatment in Jharkhand—tailored for steel, textile, and mining sectors.

Industrial Wastewater Treatment in Jharkhand 2026: Engineering Specs, Costs & Zero-Risk Compliance Guide

Wastewater Treatment Plant Cost in Kochi 2026: Tech-Specific CAPEX, OPEX & KSPCB-Compliant Design Guide

Published: Jul 10, 2026

Discover 2026 wastewater treatment plant costs in Kochi—detailed CAPEX (₹1.2L–₹4.8Cr), OPEX (₹12–₹18/m³), tech-specific breakdowns (MBBR, MBR, SBR), and KSPCB-compliant design parameters for industri…

Wastewater Treatment Plant Cost in Kochi 2026: Tech-Specific CAPEX, OPEX & KSPCB-Compliant Design Guide

Industrial Wastewater Treatment Plant Cost Faridabad: 2026 CAPEX OPEX Guide

Published: Jul 10, 2026

Wastewater treatment plant cost in Faridabad runs ₹1.2–₹4.5 crore CAPEX for a 500 m³/day industrial plant, with OPEX of ₹8–₹25/m³ treated. MBBR suits auto effluents (TSS 800–1,200 mg/L), UASB fits 2,…

Industrial Wastewater Treatment Plant Cost Faridabad: 2026 CAPEX OPEX Guide

Top Sewage Treatment Equipment Suppliers in Thiruvananthapuram: 2026 Engineering Specs, Costs & Zero-Risk Selection Guide

Published: Jul 9, 2026

Discover 2026 engineering specs, CAPEX (₹12L–₹4.5Cr), and zero-risk supplier selection for sewage treatment equipment in Thiruvananthapuram—MBR vs SBR, compliance with KSPCB, and ROI models.

Top Sewage Treatment Equipment Suppliers in Thiruvananthapuram: 2026 Engineering Specs, Costs & Zero-Risk Selection Guide

Wastewater Treatment Plant Cost in Nagpur 2026: CAPEX, OPEX & Tech-Specific Breakdown for Industrial Buyers

Published: Jul 9, 2026

Discover 2026 wastewater treatment plant costs in Nagpur—detailed CAPEX (₹1.2L–₹195Cr), OPEX (₹3.4–₹9.6/m³), and tech-specific breakdowns for MBBR, MBR, and conventional STPs. Zero-risk compliance gu…

Wastewater Treatment Plant Cost in Nagpur 2026: CAPEX, OPEX & Tech-Specific Breakdown for Industrial Buyers

Industrial Wastewater Treatment in Ludhiana: Specs, Costs & Compliance

Published: Jul 8, 2026

Ludhiana industrial ETPs are sized to PPCB consent limits such as COD ≤ 250 mg/L, TSS ≤ 100 mg/L, and electroplating Cr(VI) ≤ 0.1 mg/L. CAPEX benchmarks for 2026 runs are about ₹15–25L per KLD for DA…

Industrial Wastewater Treatment in Ludhiana: Specs, Costs & Compliance
Request a Wastewater Treatment Quote
AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us