Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Municipal Wastewater — water evidence database

Public guides, reported developments and reviewed evidence. Counts describe this library’s coverage.

Explore relationships
Partial: confirmed material onlyPartial coveragePublic snapshot · UTC+8

Related guides
548
Reported events
2
Reviewed facts
0
Published dossiers
0
Independent sources
2

Guides are article candidates, events are source-supported reports, and facts are reviewed records. Countries and industries overlap; grouped counts cannot be added into a global total.

Country × industry coverage

Select a cell to inspect its records. Coverage measures published material, never market size, factories or local project volume.

Related guides · more published material
Select a cell to inspect its records. Coverage measures published material, never market size, factories or local project volume.
CountryTextileFood & BeverageChemical ManufacturingPharmaceutical ManufacturingOil & GasMunicipal Wastewater
Algeria13—116
Angola33—115
Argentina1511—1
Australia24—1121
Azerbaijan———1——
Bahrain1111—6
Bangladesh81—2—1
Bolivia1—————
Brazil141119
Cambodia22—1—2
Cameroon23—1—4
Canada252——26
Chile13—1—1
China5111—1
Colombia13———1
Costa Rica—1———1
Cyprus—————1
Czech Republic—1———2
Denmark—2—1—1
Dominican Republic121——1
Ecuador1321—1
Egypt42—1—8
Ethiopia23—1—1
Fiji—————1
Finland—1———1
France131——4
Germany13—2—1
Ghana23—1—6
Greece—1———1
Hungary—2————
India341745—50
Indonesia11631—15
Iran645118
Iraq131128
Ireland—3———2
Israel11———5
Italy12—1—3
Ivory Coast11—1—4
Japan1111—1
Jordan21—1—6
Kazakhstan11—115
Kenya43—113
Kuwait133—27
Malaysia16—3—6
Mexico3413—16
Mongolia11———1
Montenegro—1————
Morocco6311—9
Mozambique31—1—6
Myanmar1111—1
Namibia—————1
Nepal32—1—1
Netherlands12———2
New Zealand—2———2
Nigeria543117
Norway11———2
Oman223136
Pakistan1133——6
Panama242——2
Peru44—1—1
Philippines322——5
Poland11—1—3
Portugal12———1
Qatar2321—6
Romania—1———2
Russia—211—1
Rwanda2211—3
Saudi Arabia1741215
Senegal2111—4
Singapore11—1—1
South Africa23—1—13
South Korea21———5
Spain13—1—2
Sri Lanka321——1
Sweden11—1—1
Syria—————1
Tajikistan—————1
Tanzania14—1—1
Thailand37—1—1
Turkey4211—1
Turkmenistan31—1—3
Uganda55—1—5
Ukraine—————1
United Arab Emirates232119
United Kingdom1311—20
United States202463773221564
Uzbekistan41—1—4
Vietnam5313—10

A dash means coverage is unknown or unconnected. A verified zero is shown only when the metric scope is known.

Daily public additions

First verified public appearance in this library, by UTC+8 day. Source publication dates do not create historical growth.

Reported eventsReviewed factsPublished dossiersRelated guides
—
—
—
—
—
—
—
—
—
—

History is accumulating. Missing or failed days remain gaps; a single snapshot cannot establish a trend. Historical baseline and backfill are labelled separately.

Inspect recorded days and changes
Day (UTC+8)Coverage statusnew recordsHistorical backfillRevisedWithdrawnRestored
2026-10-15Partial: confirmed material only—0000
2026-10-16Partial: confirmed material only100000
2026-10-17Partial: confirmed material only20000
2026-10-18Partial: confirmed material only80000
2026-10-19Partial: confirmed material only80000
2026-10-20Partial: confirmed material only90000
2026-10-21Partial: confirmed material only50000
2026-10-22Partial: confirmed material only50000
2026-10-23Partial: confirmed material only80000
2026-10-24Partial: confirmed material only60010
2026-10-25Partial: confirmed material only61000
2026-10-26Partial: confirmed material only70000
2026-10-27Partial: confirmed material only60000
2026-10-28Partial: confirmed material only70000
2026-10-29Partial: confirmed material only90000
2026-10-30Partial: confirmed material only70000
2026-10-31Partial: confirmed material only80000
2026-11-01Partial: confirmed material only50000
2026-11-02Partial: confirmed material only91000
2026-11-03Partial: confirmed material only50000
2026-11-04Partial: confirmed material only110000
2026-11-05Partial: confirmed material only—0000

Current sources and reviewed facts

Two separate stocks at the published watermark. No historical stock line is reconstructed from article dates.

Current snapshot only
Independent sources2
Reviewed facts0

Record explorer

Inspect the records behind the selected coverage or day. Source links open the original publisher.

Record typeRecordCountryFirst public verificationEvidence
Guide candidateDomestic Sewage Treatment in Hai Phong: 2026 Equipment GuideEnglish source titleVietnam2026-11-04 15:07Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Mexico City: 2026 Buyer’s GuideEnglish source titleMexico2026-11-04 15:07Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Guadalajara: 2026 GuideEnglish source titleMexico2026-11-04 15:07Open the record for its evidence
Guide candidateIFAS for Municipal Sewage Wastewater: 2026 Design GuideEnglish source titleCountry scope not reported2026-11-04 15:07Open the record for its evidence
Guide candidateIFAS for Domestic Sewage: 2026 Engineering GuideEnglish source titleCountry scope not reported2026-11-04 15:07Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Monterrey: 2026 Equipment GuideEnglish source titleMexico2026-11-04 15:07Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Puebla: 2026 Equipment GuideEnglish source titleMexico2026-11-04 15:07Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Tijuana: 2026 Equipment GuideEnglish source titleMexico2026-11-04 15:07Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Leon: 2026 Equipment GuideEnglish source titleMexico2026-11-04 15:07Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Cancun: 2026 Buyer’s GuideEnglish source titleMexico2026-11-04 15:07Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Mérida: 2026 Equipment GuideEnglish source titleMexico2026-11-04 15:07Open the record for its evidence
Guide candidateDomestic Sewage Treatment in Bukhara: 2026 Equipment GuideEnglish source titleUzbekistan2026-11-03 16:00Open the record for its evidence

Related guides

Technical and news articles provide reading paths and candidate associations; they do not prove a local project or reviewed fact.

More country-specific reading is available through the country links in the coverage table.

Recent reported developments

Source publication and first public verification are separate dates. Reported developments remain observations.

Source published

Ireland regulates domestic wastewater treatment systems and provides national inspection arrangements to protect human health and the environment from septic tank risks.

Inspect original excerpt
Domestic waste water treatment systems (DWWTS) are used by householders to treat sewage. There are nearly half a million systems in Ireland, mostly septic tanks. DWWTS can contaminate household wells with harmful bacteria and viruses if not built and operated properly. Excessive releases of nutrients such as nitrogen and phosphorus can cause pollution in rivers, lakes and coastal waters.
Original source

First public verification: 2026-11-02 14:40

Source published

United States regulations set discharge limits and conditions for municipal wastewater treatment facilities.

Inspect original excerpt
NPDES permits establish discharge limits and conditions for discharges from municipal wastewater treatment facilities to waters of the United States.
Original source

First public verification: 2026-10-25 14:57

Comparable water samples

Compare only matching parameter, unit, water stage and scope. Individual facility samples never represent a national average or a continuous water-quality trend.

No group of at least two comparable, reviewed samples is available. Read individual evidence in the published dossiers.

Move from evidence to a treatment discussion

Carry the selected country and industry into your enquiry. Confirm influent conditions, discharge destination and operating scope with the engineering team.

Snapshot scope and provenance
Version
387280b49b0b646ef95693edc7516e84534bb276271d43b038b0e1db94636a24
Industry classification version
2026-10-15.1
Reviewed foundation version
20261015T105811-e19facf957c3
Observation version
f3b00185eebc1d279f1e637dd9480f751c990bf8c4e90d345a292783595b70f3
Public coverage watermark
41c426f3069a97fb4eb5d9e555dc6073cacc4fd3aff7fa1a7fa3cccc7034a022
Historical baseline cutoff
Not reported

Only caller-frozen public records are counted. Language versions and revisions share a record identity; source versions share the independent source identity.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us