Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Equipment & Technology Guide

Looking for guides for a specific country? Browse wastewater treatment guides by country →

Belt Filter Press for Domestic Sewage Wastewater: 2026 Engineering Guide

Published: Sep 8, 2026

Belt filter press for domestic sewage wastewater: 2026 process design, polymer dosing, cake dryness targets, and where BFPs fit in municipal WWTPs.

Belt Filter Press for Domestic Sewage Wastewater: 2026 Engineering Guide

Belt Filter Press for Citric Acid Wastewater: 2026 Engineering Guide

Published: Sep 8, 2026

Belt filter press for citric acid wastewater — 2026 engineering guide on cake dryness, polymer dose, pH conditioning, and ROI for food-grade plants.

Belt Filter Press for Citric Acid Wastewater: 2026 Engineering Guide

Filter Press for Amino Acid Fermentation Wastewater: 2026 Engineering Guide

Published: Sep 8, 2026

How filter presses dewater amino acid fermentation wastewater in 2026 — process design, polymer conditioning, cake solids, and ROI for B2B plants.

Filter Press for Amino Acid Fermentation Wastewater: 2026 Engineering Guide

Filter Press for Palm Oil Mill Wastewater: 2026 Engineering Guide

Published: Sep 8, 2026

Filter press for palm oil mill wastewater (POME) — 2026 guide covering sludge dewatering, plate-frame vs belt press, methane reduction, and ROI.

Filter Press for Palm Oil Mill Wastewater: 2026 Engineering Guide

UASB Reactor for Low C/N Ratio Wastewater: 2026 Engineering Guide

Published: Sep 8, 2026

UASB reactor for low C/N ratio wastewater — 2026 design rules, HRT/OLR limits, two-stage configurations, and when to add Anammox or post-aerobic polishing.

UASB Reactor for Low C/N Ratio Wastewater: 2026 Engineering Guide

Activated Carbon Filter for High Color Wastewater: 2026 Engineering Guide

Published: Sep 8, 2026

An activated carbon filter removes true color (ADMI/Pt-Co per Standard Methods 2120) from textile, dye, and pulp & paper wastewater by adsorbing high-molecular-weight chromophores. Choose PAC (5–200 mg/L) for intermittent spikes and GAC (EBCT 10–30 min) for continuous discharge below 50 ADMI Pt-Co. Size beds at 1.5–3.0 m depth with multimedia pre-treatment, and plan media life of 6–24 months on strong dyebath streams.

Activated Carbon Filter for High Color Wastewater: 2026 Engineering Guide

Activated Carbon Filter for Refractory Organic Wastewater: 2026 Engineering Guide

Published: Sep 8, 2026

2026 engineering guide to activated carbon filters for refractory organic wastewater — GAC vs PAC vs BAC, design parameters, regeneration, and ROI for industrial plants.

Activated Carbon Filter for Refractory Organic Wastewater: 2026 Engineering Guide

Ultrafiltration System for Aquaculture Wastewater: 2026 Design Guide

Published: Sep 8, 2026

2026 engineering guide to ultrafiltration system design for aquaculture wastewater — pore size selection, flux targets, membrane materials, fouling control & RAS integration.

Ultrafiltration System for Aquaculture Wastewater: 2026 Design Guide

Ultrafiltration System for Airport Wastewater Design: 2026 Engineering Guide

Published: Sep 8, 2026

Ultrafiltration system for airport wastewater design in 2026 — UF role in the MBR/RO train, sizing parameters, de-icing shock handling, and reuse case studies.

Ultrafiltration System for Airport Wastewater Design: 2026 Engineering Guide

Ultrafiltration System for Hotel Wastewater Design: 2026 Engineering Guide

Published: Sep 8, 2026

2026 engineering guide to ultrafiltration system design for hotel wastewater — submerged MBR specs, hydraulic loading, reuse targets, and CAPEX benchmarks.

Ultrafiltration System for Hotel Wastewater Design: 2026 Engineering Guide

Ultrafiltration System for Hospital Wastewater Design: 2026 Engineering Guide

Published: Sep 8, 2026

Ultrafiltration system for hospital wastewater design in 2026: membrane selection, pretreatment, fouling control, and discharge compliance for healthcare facilities.

Ultrafiltration System for Hospital Wastewater Design: 2026 Engineering Guide

Ultrafiltration System for Yeast Wastewater Design: 2026 Engineering Guide

Published: Sep 8, 2026

Ultrafiltration system for yeast wastewater design: 2026 specs, MWCO selection, PVDF vs PP membranes, COD removal data, and full CAPEX/OPEX breakdown.

Ultrafiltration System for Yeast Wastewater Design: 2026 Engineering Guide

Ultrafiltration System for Gelatin Wastewater: 2026 Design Guide

Published: Sep 8, 2026

2026 engineering guide to ultrafiltration system design for gelatin wastewater: membrane selection, MWCO, TMP, CFV, fouling control & process integration.

Ultrafiltration System for Gelatin Wastewater: 2026 Design Guide

Ultrafiltration System for Bakery Wastewater Design: 2026 Engineering Guide

Published: Sep 8, 2026

Design an ultrafiltration system for bakery wastewater in 2026 — process flow, MBR/UF integration, flux targets, and pretreatment requirements explained.

Ultrafiltration System for Bakery Wastewater Design: 2026 Engineering Guide

MBBR for Ethanol Plant Wastewater: 2026 Design & Process Guide

Published: Sep 8, 2026

MBBR for ethanol plant wastewater design in 2026: COD/BOD targets, carrier fill ratios, HRT, and full process train from thin stillage to reuse.

MBBR for Ethanol Plant Wastewater: 2026 Design & Process Guide

How to Remove Microplastics from Wastewater: 2026 Industrial Methods & Removal Rates

Published: Sep 8, 2026

Compare 2026 physical, chemical, and biological methods to remove microplastics from industrial wastewater — with efficiency ranges, process design, and equipment selection.

How to Remove Microplastics from Wastewater: 2026 Industrial Methods & Removal Rates

How to Remove PFAS from Wastewater: 2026 Industrial Process Guide

Published: Sep 8, 2026

Step-by-step 2026 guide to removing PFAS from industrial wastewater — compare GAC, ion exchange, RO, and emerging photocatalysis methods with real removal data.

How to Remove PFAS from Wastewater: 2026 Industrial Process Guide

How to Remove Color from Wastewater: 2026 Industrial Process Guide

Published: Sep 8, 2026

Step-by-step 2026 guide to removing color from industrial wastewater: coagulation, adsorption, AOPs, membrane filtration, and biological methods with real removal data.

How to Remove Color from Wastewater: 2026 Industrial Process Guide

How to Remove Phenol from Wastewater: 2026 Process & Technology Guide

Published: Sep 8, 2026

How to remove phenol from wastewater in 2026: compare adsorption, biological, AOPs, and combined trains, with EPA limits, removal rates, and equipment guidance.

How to Remove Phenol from Wastewater: 2026 Process & Technology Guide

How to Remove Fluoride from Wastewater: 2026 Industrial Methods Guide

Published: Sep 8, 2026

Step-by-step 2026 guide to removing fluoride from industrial wastewater — precipitation, adsorption, ion exchange, RO, and membrane methods with efficiency data.

How to Remove Fluoride from Wastewater: 2026 Industrial Methods Guide

How to Remove Cyanide from Wastewater: 2026 Industrial Methods, Limits & Process Selection

Published: Sep 8, 2026

Industrial plants remove cyanide by matching free, WAD, and SAD speciation to the right unit operations. Alkaline chlorination at pH 9–11 destroys free and WAD cyanide at about 2–3 mg Cl₂ per mg CN⁻, while SAD cobalt, iron, gold, and silver complexes need precipitation, ion exchange, or RO. U.S. surface-water permits commonly target about 0.005 ppm total cyanide monthly average, and dilution is prohibited. Combined trains can reach up to 99% removal when chlorination, biology, and polishing are sequenced correctly.

How to Remove Cyanide from Wastewater: 2026 Industrial Methods, Limits & Process Selection

How to Remove Lead from Industrial Wastewater: 2026 Process Guide

Published: Sep 7, 2026

Compare chemical precipitation, ion exchange, adsorption, and membrane methods for lead removal from industrial wastewater — with 2026 design parameters and cost data.

How to Remove Lead from Industrial Wastewater: 2026 Process Guide

How to Remove Zinc from Wastewater: 2026 Industrial Methods, Limits & ROI

Published: Sep 7, 2026

Learn how to remove zinc from industrial wastewater in 2026: chemical precipitation, ion exchange, membrane & electrocoagulation methods, 40 CFR 433 limits, and cost.

How to Remove Zinc from Wastewater: 2026 Industrial Methods, Limits & ROI

How to Remove Nickel from Wastewater: 2026 Engineering Guide

Published: Sep 7, 2026

To remove nickel from industrial wastewater, use precipitation, ion exchange, electrocoagulation, adsorption, or RO as a dedicated unit—not activated sludge alone. US EPA 40 CFR Part 433 PSES sets Nickel (T) at 3.98 mg/L daily maximum and 2.38 mg/L monthly average for metal finishing; WHO's drinking-water guideline is 0.07 mg/L. Match the train to influent Ni, co-ions, sludge haulage, and reuse targets before freezing CAPEX.

How to Remove Nickel from Wastewater: 2026 Engineering Guide

How to Remove Chromium from Wastewater: 2026 Process Guide

Published: Sep 7, 2026

Hexavalent chromium is reduced to Cr(III) at pH 2.0–2.5 with FeSO4 or Na2S2O5, then precipitated as Cr(OH)3 at pH 8.0–9.0. Polishing by ion exchange or RO targets below 0.1 mg/L for discharge or 0.05 mg/L for reuse. Sludge yield of 3–6 kg dry solids per kg Cr and ORP control at +200 to +300 mV dominate design risk.

How to Remove Chromium from Wastewater: 2026 Process Guide

UV Disinfection System Capacity and Sizing: 2026 Engineering Guide

Published: Sep 7, 2026

UV disinfection capacity and sizing is set by delivered dose (mJ/cm²), not lamp count. Lock PHWW, minimum UVT at 254 nm, and permit dose before selecting a reactor; apply aging, fouling, and UVT derates. NWRI (2012) sets 100/80/50 mJ/cm² by media, membrane, or RO pretreatment, with N+1 redundancy for year-round duty.

UV Disinfection System Capacity and Sizing: 2026 Engineering Guide

Multiple Effect Evaporator Capacity and Sizing: 2026 Engineering Guide

Published: Sep 7, 2026

Size a multiple effect evaporator with confidence: capacity ranges, steam economy math, effect count trade-offs, and the 2026 selection checklist for industrial wastewater.

Multiple Effect Evaporator Capacity and Sizing: 2026 Engineering Guide

Cavitation Air Flotation Capacity and Sizing: 2026 Engineering Guide

Published: Sep 7, 2026

Cavitation air flotation capacity and sizing explained for 2026 — flow rates, microbubble specs, power curves, and tank dimensions for industrial CAF systems.

Cavitation Air Flotation Capacity and Sizing: 2026 Engineering Guide

MVR Evaporator for Coal Chemical Wastewater: 2026 Engineering Guide

Published: Sep 7, 2026

MVR evaporator for coal chemical wastewater: forced-circulation design, energy data, scaling control, and ZLD integration. 2026 spec guide for plant engineers.

MVR Evaporator for Coal Chemical Wastewater: 2026 Engineering Guide

Nanofiltration System for Power Plant Wastewater: 2026 Engineering Guide

Published: Sep 7, 2026

Nanofiltration system for power plant wastewater — 2026 specs, NF vs RO comparison, target contaminants, and design criteria for utility engineers.

Nanofiltration System for Power Plant Wastewater: 2026 Engineering Guide
AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us