Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Compliance & Regulations

Looking for guides for a specific country? Browse wastewater treatment guides by country →

Phenol Discharge Limit in India: 2026 CPCB Compliance & Treatment Guide

Published: Aug 6, 2026

Phenol discharge limit in India for 2026: CPCB effluent standards (1.0–5.0 mg/L), sector-specific norms, and proven treatment technologies explained for ETP designers.

Phenol Discharge Limit in India: 2026 CPCB Compliance & Treatment Guide

Total Phosphorus Discharge Limit in Kenya: 2026 NEMA Standards & Treatment Guide

Published: Aug 6, 2026

Total phosphorus discharge limit in Kenya 2026 — NEMA effluent standards, 2 mg/L TP target, sector-specific rules, and proven treatment process design for compliance.

Total Phosphorus Discharge Limit in Kenya: 2026 NEMA Standards & Treatment Guide

pH Discharge Limit in Mexico: 2026 NOM-001 Compliance Guide

Published: Aug 6, 2026

pH discharge limit in Mexico under NOM-001-SEMARNAT-2021: 5.0–10.0 for most effluents, stricter 6.0–9.0 for new plants. 2026 compliance, monitoring, and treatment guide.

pH Discharge Limit in Mexico: 2026 NOM-001 Compliance Guide

Oil and Grease Discharge Limit in Nigeria: 2026 FMEnv/EGASPIN Compliance Guide

Published: Aug 6, 2026

Oil and grease discharge limit in Nigeria for 2026 — FMEnv, EGASPIN and DPR limits by sector (10–40 mg/L), penalties, and treatment solutions.

Oil and Grease Discharge Limit in Nigeria: 2026 FMEnv/EGASPIN Compliance Guide

PFAS Discharge Limit Indonesia 2026: Compliance Guide

Published: Aug 6, 2026

Indonesia has no numeric PFAS discharge limit in 2026; PP 22/2021 plus POPs rules ratified in PP 26/2024 leave a detect-to-zero floor near 1–5 ng/L. GAC, AIX, and RO trains reach <10 ng/L PFOA/PFOS, with CAPEX from USD 0.18M (GAC+AIX, 10–50 m³/day) to USD 2.4M (two-pass RO+AIX, 200–500 m³/day). A 90-day characterization-to-RFQ roadmap closes the guide.

PFAS Discharge Limit Indonesia 2026: Compliance Guide

Total Phosphorus Discharge Limit in UAE: 2026 Compliance & Treatment Guide

Published: Aug 5, 2026

Total phosphorus discharge limit in UAE 2026 — Federal Decree-Law 12/2026 limits, FCO/PRO permit tiers, and treatment trains to meet ≤2 mg/L TP.

Total Phosphorus Discharge Limit in UAE: 2026 Compliance & Treatment Guide

Total Nitrogen Discharge Limit in Nigeria: 2026 FMEnv Compliance Guide

Published: Aug 5, 2026

Total nitrogen discharge limit in Nigeria for 2026 — FMEnv/EGASPIN limits, sector-specific caps, BNR & MBR treatment design, and B2B equipment checklist.

Total Nitrogen Discharge Limit in Nigeria: 2026 FMEnv Compliance Guide

Thailand Wastewater Discharge Regulations: 2026 Compliance Guide

Published: Aug 5, 2026

Thailand wastewater discharge regulations for 2026: PCD effluent standards, BOD/COD limits, factory permitting, and treatment equipment selection for compliance.

Thailand Wastewater Discharge Regulations: 2026 Compliance Guide

pH Discharge Limit in Egypt: 2026 Compliance & Treatment Guide

Published: Aug 5, 2026

2026 pH discharge limit in Egypt explained — Law 4/1994 & Decree 44/2000 standards, EEAA enforcement, treatment process design, and CAPEX data.

pH Discharge Limit in Egypt: 2026 Compliance & Treatment Guide

Microplastics Discharge Limit in Egypt: 2026 Compliance & Treatment Guide

Published: Aug 5, 2026

Microplastics discharge limit in Egypt for 2026 — EEAA Law 4/1994, Law 202/2020, and the new draft EEAA nanoplastics standard explained with treatment process design.

Microplastics Discharge Limit in Egypt: 2026 Compliance & Treatment Guide

Oil and Grease Discharge Standard: 2026 Global Compliance & Treatment Guide

Published: Aug 5, 2026

Oil and grease discharge standard explained for 2026 — GB, EPA, EU, and municipal FOG limits with DAF treatment design and CAPEX/OPEX data.

Oil and Grease Discharge Standard: 2026 Global Compliance & Treatment Guide

Chemical Wastewater Discharge Standard: 2026 Global Compliance & Treatment Guide

Published: Aug 4, 2026

2026 chemical wastewater discharge standards explained: GB 8978-1996 limits, EPA Effluent Guidelines, EU directives, and treatment technology selection for compliance.

Chemical Wastewater Discharge Standard: 2026 Global Compliance & Treatment Guide

Total Nitrogen Discharge Limit in South Africa: 2026 Compliance Guide

Published: Aug 4, 2026

Total nitrogen discharge limit in South Africa for 2026: DWS standards, special/effluent limits, irrigation thresholds, treatment tech and compliance steps for industry.

Total Nitrogen Discharge Limit in South Africa: 2026 Compliance Guide

Chromium Discharge Limit in Thailand: 2026 Compliance & Treatment Guide

Published: Aug 4, 2026

Thailand's 2026 chromium discharge limits explained — Cr(VI) ≤0.25 mg/L, Cr(III) ≤0.75 mg/L. Treatment process design, equipment selection, and IEAT/PCD compliance.

Chromium Discharge Limit in Thailand: 2026 Compliance & Treatment Guide

Saudi Arabia Wastewater Discharge Regulations: 2026 Compliance & Engineering Guide

Published: Aug 4, 2026

Saudi Arabia wastewater discharge regulations in 2026 use a PME national baseline under Decree M/12, with stricter Royal Commission rules inside Jubail, Yanbu, Ras Al-Khair, and Jazan. Typical PME limits include BOD ≤ 25 mg/L, COD ≤ 150 mg/L, and TSS ≤ 30 mg/L; MAW 1989 reuse still binds turbidity at 1 NTU and nitrate-N at 10 mg/L. Most industrial trains use DAF → MBR → RO → ClO₂, with ZLD added for high-salinity brine where RC expects zero liquid discharge.

Saudi Arabia Wastewater Discharge Regulations: 2026 Compliance & Engineering Guide

Slaughterhouse Wastewater Discharge Standard 2026: Global Limits & Treatment Guide

Published: Aug 4, 2026

2026 slaughterhouse wastewater discharge standards for EPA, EU, CPCB & China. BOD, COD, TSS, FOG limits explained with treatment process design.

Slaughterhouse Wastewater Discharge Standard 2026: Global Limits & Treatment Guide

Food Processing Wastewater Reuse Compliance: 2026 Engineering Guide

Published: Aug 4, 2026

2026 engineering guide to food processing wastewater reuse compliance — discharge limits, MBR+RO process design, reuse water quality, and ROI for food & beverage plants.

Food Processing Wastewater Reuse Compliance: 2026 Engineering Guide

Copper Discharge Limit in Egypt: 2026 EEAA Standards & Treatment Guide

Published: Aug 3, 2026

Egypt's 2026 copper discharge limits for industry — Law 4/1994, EEAA Decree 44/2000, Annex V values, plus treatment technology to comply.

Copper Discharge Limit in Egypt: 2026 EEAA Standards & Treatment Guide

Brewery Wastewater Discharge Standard 2026: Limits, Treatment & Compliance

Published: Aug 3, 2026

Brewery wastewater discharge standard explained: BOD, COD, TSS and pH limits under US EPA, EU and China GB 19821. Treatment train and 2026 compliance steps.

Brewery Wastewater Discharge Standard 2026: Limits, Treatment & Compliance

Kazakhstan Wastewater Discharge Regulations 2026: MAC Limits, Permits & Compliance Guide

Published: Aug 3, 2026

Kazakhstan wastewater discharge regulations 2026: MAC limits, environmental permit process, and compliance steps for industrial plants under the new Ecological Code.

Kazakhstan Wastewater Discharge Regulations 2026: MAC Limits, Permits & Compliance Guide

Color Discharge Limit in Indonesia 2026: PP 22/2021 Standards & Compliance Guide

Published: Aug 3, 2026

Color discharge limit in Indonesia 2026 under PP 22/2021 — Pt-Co scale, 200 TCU threshold, textile & dye sector rules, treatment design and compliance steps.

Color Discharge Limit in Indonesia 2026: PP 22/2021 Standards & Compliance Guide

COD Discharge Limit for Industry in 2026: Global Standards & Compliance Guide

Published: Aug 3, 2026

COD discharge limit for industry in 2026 — country-by-country standards, sector-specific limits, and how to meet them with proven treatment technology.

COD Discharge Limit for Industry in 2026: Global Standards & Compliance Guide

Suspended Solids Discharge Limit in Nigeria: 2026 NESREA Standards

Published: Aug 2, 2026

Nigeria suspended solids discharge limits for 2026 — NESREA effluent standards, industry-specific thresholds, and compliant treatment equipment guidance.

Suspended Solids Discharge Limit in Nigeria: 2026 NESREA Standards

BOD Discharge Limit in India CPCB 2026: Compliance Guide

Published: Aug 2, 2026

India's inland surface water BOD discharge limit remains 30 mg/L BOD₅ at 20°C under Schedule-I of the EP Rules, 1986, with 350 mg/L for public sewers and 100 mg/L for marine and land disposal. CPCB sector notifications and State PCB consent orders override the default for distilleries, textiles, pharma, dairy, and tanneries. Treatment trains from ASP to MBR-plus-RO hold each band, and consent renewals cut limits 20–50%.

BOD Discharge Limit in India CPCB 2026: Compliance Guide

Oil and Grease Discharge Limit in India: 2026 CPCB/SPCB Standards & Compliance Guide

Published: Aug 2, 2026

Oil and grease discharge limits in India for 2026 — CPCB effluent standards, SPCB state variations, industry-specific norms, and DAF treatment specs.

Oil and Grease Discharge Limit in India: 2026 CPCB/SPCB Standards & Compliance Guide

South Africa Heavy Metals Effluent Limits 2026: DWS Guide

Published: Aug 2, 2026

South Africa has no single national heavy metals effluent limit; values are set site-by-site in Water Use Licence conditions, with DWS General limits such as Cd 0.005 mg/L and Hg 0.001 mg/L and tighter Special limits for sensitive catchments. Compliance is judged on 95th-percentile composite sampling at the site boundary. A six-stage train — redox, hydroxide, sulfide, solids removal, resin/RO polishing, filter-pressed sludge — meets the 2026 columns.

South Africa Heavy Metals Effluent Limits 2026: DWS Guide

Phenol Discharge Limit in the Philippines: 2026 DAO 35 Compliance & Treatment Guide

Published: Aug 2, 2026

Phenol discharge limit in the Philippines under DENR DAO 35 (2026): effluent standards by water class, treatment options, and B2B engineering guide.

Phenol Discharge Limit in the Philippines: 2026 DAO 35 Compliance & Treatment Guide

Phenol Discharge Limit in Mexico: 2026 NOM-001 Compliance Guide

Published: Aug 2, 2026

Phenol discharge limit in Mexico under NOM-001-SEMARNAT-2021. 2026 effluent values, monitoring methods, and treatment options for industrial compliance.

Phenol Discharge Limit in Mexico: 2026 NOM-001 Compliance Guide

Total Nitrogen Discharge Limit in Kazakhstan: 2026 Standards & Compliance Guide

Published: Aug 1, 2026

2026 total nitrogen discharge limits in Kazakhstan — MPC values, permit tiers, and treatment design for industrial wastewater compliance.

Total Nitrogen Discharge Limit in Kazakhstan: 2026 Standards & Compliance Guide

Pulp and Paper Effluent Discharge Permit Requirements: 2026 Compliance Guide

Published: Aug 1, 2026

Complete 2026 guide to pulp and paper effluent discharge permit requirements—EPA, EU IED, and China GB limits for COD, BOD, TSS, AOX, and process compliance.

Pulp and Paper Effluent Discharge Permit Requirements: 2026 Compliance Guide
AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us