Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Compliance & Regulations

Looking for guides for a specific country? Browse wastewater treatment guides by country →

Total Nitrogen Discharge Limit in Thailand: 2026 Compliance & Engineering Guide

Published: Aug 11, 2026

Thailand's 2026 total nitrogen discharge limit (TKN ≤100 mg/L standard, ≤200 mg/L for select industries). Notification No. 4 explained with treatment train design.

Total Nitrogen Discharge Limit in Thailand: 2026 Compliance & Engineering Guide

Color Discharge Limit in Brazil 2026: CONAMA Standards & Compliance Guide

Published: Aug 11, 2026

Brazil 2026 color discharge limit explained — CONAMA 430/2011 true color ≤75 mg Pt/L, ADTM/m, regulatory bodies, monitoring methods, and treatment train design.

Color Discharge Limit in Brazil 2026: CONAMA Standards & Compliance Guide

Mexico Industrial Effluent Standard 2026: NOM-001-SEMARNAT-2021 Compliance Guide

Published: Aug 11, 2026

Complete 2026 guide to Mexico's industrial effluent standard NOM-001-SEMARNAT-2021, NOM-002, discharge limits, and treatment equipment for SEMARNAT compliance.

Mexico Industrial Effluent Standard 2026: NOM-001-SEMARNAT-2021 Compliance Guide

Sulfide Discharge Limit in UAE 2026: Federal Decree-Law 12/2026 Compliance & Treatment Guide

Published: Aug 11, 2026

UAE sulfide discharge limit in 2026: Federal Decree-Law 12/2026 sets 1 mg/L S²⁻ in marine outfalls. Treatment tech, costs, and compliance steps.

Sulfide Discharge Limit in UAE 2026: Federal Decree-Law 12/2026 Compliance & Treatment Guide

GB 8978 Effluent Standard: 2026 Compliance & Treatment Guide

Published: Aug 11, 2026

GB 8978 effluent standard explained for 2026: class 1/2/3 limits, 69 pollutant parameters, supersession status, and how to engineer treatment trains to meet them.

GB 8978 Effluent Standard: 2026 Compliance & Treatment Guide

Brewery Wastewater Reuse Compliance in 2026: Engineering Guide, Limits & Treatment Train

Published: Aug 10, 2026

Brewery wastewater reuse compliance 2026 guide — influent parameters, EPA/EU discharge limits, MBR+RO treatment train, monitoring and reuse standards.

Brewery Wastewater Reuse Compliance in 2026: Engineering Guide, Limits & Treatment Train

Cyanide Discharge Limit in India 2026: CPCB & SPCB Standards Guide

Published: Aug 10, 2026

Complete 2026 guide to cyanide discharge limits in India — CPCB/EPA 1986 norms, total vs free cyanide, industry-specific SPCB standards, and treatment solutions.

Cyanide Discharge Limit in India 2026: CPCB & SPCB Standards Guide

BOD Discharge Limit in Egypt: 2026 Law 4/1994 & Decree 44/2000 Standards Guide

Published: Aug 10, 2026

Complete 2026 guide to BOD discharge limits in Egypt — Law 4/1994, Decree 44/2000, EEAA standards, parameter tables, and treatment design.

BOD Discharge Limit in Egypt: 2026 Law 4/1994 & Decree 44/2000 Standards Guide

Lead Discharge Limit in Kazakhstan: 2026 Standards & Compliance Guide

Published: Aug 10, 2026

Kazakhstan lead discharge limits for 2026 — Water Code MAC values, MPD norms, BAT-AEL benchmarks, and how to design treatment trains that stay compliant.

Lead Discharge Limit in Kazakhstan: 2026 Standards & Compliance Guide

Cyanide Discharge Limit in Nigeria 2026: FMEnv, NESREA & Mining Standards

Published: Aug 10, 2026

2026 cyanide discharge limit in Nigeria — FMEnv S.I. No. 35, WAD vs total cyanide thresholds, mining sector limits, treatment options, and compliance roadmap.

Cyanide Discharge Limit in Nigeria 2026: FMEnv, NESREA & Mining Standards

Food Processing Wastewater Discharge Standard: 2026 Compliance Guide

Published: Aug 10, 2026

Food processing wastewater discharge standard 2026: COD, BOD, TSS, FOG limits under EPA, EU and China GB. Process design, equipment selection and compliance steps.

Food Processing Wastewater Discharge Standard: 2026 Compliance Guide

COD Discharge Limit in Nigeria: 2026 FMEnv & NESREA Standards Guide

Published: Aug 9, 2026

Complete 2026 guide to COD discharge limits in Nigeria — FMEnv S.I. No. 35 limits by industry, NESREA enforcement, and treatment equipment selection.

COD Discharge Limit in Nigeria: 2026 FMEnv & NESREA Standards Guide

Ammonia Nitrogen Discharge Limit in Kazakhstan: 2026 Standards & Compliance Guide

Published: Aug 9, 2026

Kazakhstan ammonia nitrogen discharge limits for 2026 — Water Code, MPD/MAC values by industry, treatment technology selection, and compliance engineering guide.

Ammonia Nitrogen Discharge Limit in Kazakhstan: 2026 Standards & Compliance Guide

Chemical Wastewater Reuse Compliance: 2026 Engineering Guide

Published: Aug 9, 2026

Chemical wastewater reuse compliance in 2026 — discharge limits, treatment trains, and certification pathways for industrial plants in EPA, EU, and China regions.

Chemical Wastewater Reuse Compliance: 2026 Engineering Guide

Total Phosphorus Discharge Limit in Nigeria: 2026 NESREA & FMEnv Standards

Published: Aug 9, 2026

Total phosphorus discharge limit in Nigeria for 2026 — NESREA effluent limits, FMEnv surface water thresholds, sector-specific TP values, and treatment technology guide.

Total Phosphorus Discharge Limit in Nigeria: 2026 NESREA & FMEnv Standards

Slaughterhouse Effluent Discharge Permit Requirements: 2026 Compliance Guide

Published: Aug 9, 2026

Slaughterhouse effluent discharge permit requirements for 2026: EPA effluent limits, Michigan GW1530000 parameters, permit application steps, and treatment equipment specs.

Slaughterhouse Effluent Discharge Permit Requirements: 2026 Compliance Guide

Zinc Discharge Limit Philippines 2026: DAO 2021-19 & DENR Standards Guide

Published: Aug 9, 2026

Zinc discharge limit in the Philippines for 2026 — DAO 2021-19 effluent standards (2.0 mg/L for inland waters), monitoring, and treatment design guide.

Zinc Discharge Limit Philippines 2026: DAO 2021-19 & DENR Standards Guide

Lead Discharge Limit in Kenya: 2026 EMCA & NEMA Standards Guide

Published: Aug 8, 2026

Lead discharge limit in Kenya for 2026 — EMCA Cap 387 and NEMA/WQMR limits, 0.01 mg/L standard, treatment tech and compliance roadmap for industry.

Lead Discharge Limit in Kenya: 2026 EMCA & NEMA Standards Guide

Total Nitrogen Discharge Limit in Kenya: 2026 NEMA Standards & Compliance Guide

Published: Aug 8, 2026

Total nitrogen discharge limit in Kenya for 2026 — NEMA effluent standards, ammonia-N formula, and BNR treatment options for compliant industrial discharge.

Total Nitrogen Discharge Limit in Kenya: 2026 NEMA Standards & Compliance Guide

Heavy Metals Discharge Limit in Egypt 2026: EEAA Standards & Treatment Guide

Published: Aug 8, 2026

Complete 2026 guide to heavy metals discharge limits in Egypt — EEAA Law 4/1994 limits for Cd, Pb, Hg, Cr, Cu, Zn, Ni, As and the wastewater treatment equipment that achieves compliance.

Heavy Metals Discharge Limit in Egypt 2026: EEAA Standards & Treatment Guide

Fluoride Discharge Limit in Brazil: 2026 CONAMA 430 Standards & Treatment Guide

Published: Aug 8, 2026

Brazil's industrial fluoride discharge limit is 10.0 mg/L F⁻ under CONAMA 430/2011 Article 34, with pH 5.0–9.0 and temperature ≤40 °C. CONAMA 357/2005 Class 2 fresh water still caps instream fluoride at 1.4 mg/L after mixing. This guide covers state enforcement, influent profiles, precipitation–DAF–RO trains, and 2026 CAPEX/OPEX benchmarks.

Fluoride Discharge Limit in Brazil: 2026 CONAMA 430 Standards & Treatment Guide

BOD Discharge Limit in Saudi Arabia: 2026 Standards & Compliance Guide

Published: Aug 8, 2026

2026 BOD discharge limits in Saudi Arabia for industrial wastewater — PME, NCEC, and SWCC standards, sector-specific values, and treatment design guidance.

BOD Discharge Limit in Saudi Arabia: 2026 Standards & Compliance Guide

COD Discharge Limit in Thailand: 2026 Compliance & Engineering Guide

Published: Aug 8, 2026

Thailand COD discharge limit in 2026: 120 mg/L standard, 400 mg/L industry-specific cap, IEAT estate rules, and treatment equipment selection guide.

COD Discharge Limit in Thailand: 2026 Compliance & Engineering Guide

Microplastics Discharge Limit in India: 2026 CPCB & BIS Standards

Published: Aug 7, 2026

India has no numerical microplastics discharge limit in particles/L or mg/L for industrial effluent as of 2026. BIS IS 4707 (Part 2):2017 Amendment No. 2 bans plastic microbeads in rinse-off cosmetics from 1 July 2022. CPCB and state PCBs still enforce through Schedule-I TSS, COD and O&G limits, Water Act Section 25 directions, and NGT orders. A screen–DAF–0.1 µm MBR–MMF/GAC–ClO₂ train is the defensible treatment path until a particle standard is notified.

Microplastics Discharge Limit in India: 2026 CPCB & BIS Standards

Suspended Solids Discharge Limit in UAE: 2026 Compliance & Treatment Guide

Published: Aug 7, 2026

Suspended solids discharge limit in UAE for 2026: Federal Authority limits, emirate-by-emirate rules, treatment tech and how to stay compliant.

Suspended Solids Discharge Limit in UAE: 2026 Compliance & Treatment Guide

pH Discharge Limit for Industry: 2026 Global Compliance Guide

Published: Aug 7, 2026

2026 pH discharge limit for industry by country — China, US, EU, India, Mexico. Treatment tech, neutralization costs, and how to stay compliant.

pH Discharge Limit for Industry: 2026 Global Compliance Guide

Phenol Discharge Limit for Industry: 2026 Standards, Treatment & Compliance

Published: Aug 7, 2026

Phenol discharge limit for industry in 2026: country-by-country standards, treatment technologies, cost data, and compliance engineering for B2B plant operators.

Phenol Discharge Limit for Industry: 2026 Standards, Treatment & Compliance

Copper Discharge Standard 2026: Global Limits, Treatment & Compliance Guide

Published: Aug 7, 2026

A copper discharge standard sets the maximum total copper (mg/L) allowed in treated industrial effluent. In 2026, China GB 8978-2024 uses 0.5 mg/L for Class I/II direct discharge, US EPA 40 CFR 433 uses 1.0 mg/L monthly average for metal finishing, and EU BAT-AEL targets 0.1–0.5 mg/L. Treatment choice depends on free versus chelated copper, with hydroxide, sulfide, ion exchange, and RO trains matched to 0.5, 0.1, and 0.05 mg/L targets.

Copper Discharge Standard 2026: Global Limits, Treatment & Compliance Guide

pH Discharge Limit in Kenya 2026: NEMA Standards, Compliance & Treatment Guide

Published: Aug 7, 2026

pH discharge limit in Kenya for 2026 — NEMA effluent standards of 6.0–9.0, industry-specific variations, monitoring, and treatment technology guide.

pH Discharge Limit in Kenya 2026: NEMA Standards, Compliance & Treatment Guide

BOD Discharge Limit in Kazakhstan: 2026 Compliance & Treatment Guide

Published: Aug 7, 2026

BOD discharge limit in Kazakhstan 2026: maximum permissible values, water-body categories, MPC standards, and how to meet them with proven wastewater treatment technology.

BOD Discharge Limit in Kazakhstan: 2026 Compliance & Treatment Guide
AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us