Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Industry News

Looking for guides for a specific country? Browse wastewater treatment guides by country →

Biogas from Wastewater 2026 Outlook: Markets, Tech & ROI

Published: Aug 6, 2026

Biogas from wastewater 2026 outlook covering market size, AD technology trends, regional hotspots, and ROI for industrial plants pursuing energy recovery.

Biogas from Wastewater 2026 Outlook: Markets, Tech & ROI

Biogas from Wastewater Regional Analysis 2026: Market Size, Drivers & Top Regions

Published: Aug 5, 2026

2026 regional analysis of biogas from wastewater: market size, CAGR by region, top countries, drivers, and industrial outlook for AD and biomethane projects.

Biogas from Wastewater Regional Analysis 2026: Market Size, Drivers & Top Regions

Digital Water Market Forecast 2030: Size, Growth & B2B Opportunities

Published: Aug 5, 2026

Digital water market forecast to 2030: $35B+ valuation, 9–12% CAGR, smart metering, SCADA, and AI-driven wastewater treatment growth drivers for B2B buyers.

Digital Water Market Forecast 2030: Size, Growth & B2B Opportunities

Nutrient Recovery Market Size 2026: Trends, Data & Industrial Outlook

Published: Aug 5, 2026

Nutrient recovery market size 2026: $8.2B baseline, $14.7B by 2034 (7.3% CAGR). Industrial wastewater segment, regional splits, and buyer outlook.

Nutrient Recovery Market Size 2026: Trends, Data & Industrial Outlook

Circular Water Economy Growth 2026: Industrial Reuse Outlook

Published: Aug 5, 2026

The circular water economy industrial reuse 2026 outlook is a 9.1% CAGR, with the global water-reuse market projected to surpass $1.4 trillion by 2030. Growth concentrates in Asia-Pacific (38-42% volume share), MENA (12-14% CAGR), and ZLD hybrid systems (12-15% CAGR). Site-level payback runs 2.5-4 years on a 5-year TCO basis where permits and tariffs already favor reuse.

Circular Water Economy Growth 2026: Industrial Reuse Outlook

Smart Water Monitoring Trends 2026: IoT, AI & Digital Twins in Industrial Wastewater

Published: Aug 5, 2026

Smart water monitoring trends 2026: IoT sensors, AI analytics, digital twins, and 12.3% CAGR market growth driving industrial wastewater treatment automation.

Smart Water Monitoring Trends 2026: IoT, AI & Digital Twins in Industrial Wastewater

Nutrient Recovery Key Players 2026: Top Vendors, Technologies & Market Outlook

Published: Aug 4, 2026

Nutrient recovery key players 2026 ranked: Ostara, Veolia, Suez, DVO, Xylem and emerging vendors. Compare technologies, market share, and ROI.

Nutrient Recovery Key Players 2026: Top Vendors, Technologies & Market Outlook

MBR Market Growth 2026 Outlook: Size, Drivers & Tech Shifts

Published: Aug 4, 2026

MBR market growth 2026 outlook: $4.1B→$6.8B at 8.9% CAGR. Drivers, regional splits, PVDF vs ceramic membranes, and what buyers should expect.

MBR Market Growth 2026 Outlook: Size, Drivers & Tech Shifts

Water Reuse Key Players 2026: Industrial Equipment Manufacturers Compared

Published: Aug 4, 2026

Compare the top water reuse key players 2026 — Veolia, SUEZ, Xylem, Ecolab, Aquatech and HydropureWater. Tech, ROI, and selection framework inside.

Water Reuse Key Players 2026: Industrial Equipment Manufacturers Compared

Membrane Technology Market Trends 2026: Size, Growth & Industrial Outlook

Published: Aug 4, 2026

Membrane technology market trends 2026: $31B→$44.5B forecast, 8.9–9.4% CAGR, ultrafiltration & RO drivers, and what they mean for industrial wastewater buyers.

Membrane Technology Market Trends 2026: Size, Growth & Industrial Outlook

Desalination Market Regional Analysis 2026: MENA, Asia, Americas

Published: Aug 4, 2026

Desalination market regional analysis 2026: MENA 38% share, USD 19.6B global size, 8.82% CAGR. RO dominates; SWRO projects in Texas, Israel, China reshape supply.

Desalination Market Regional Analysis 2026: MENA, Asia, Americas

Smart Water Monitoring Growth Rate 2026: Industrial Buyer's Data Guide

Published: Aug 4, 2026

Smart water monitoring growth rate 2026: market data, 11–14.3% CAGR, IoT share, and what industrial buyers should spec into new monitoring systems this year.

Smart Water Monitoring Growth Rate 2026: Industrial Buyer's Data Guide

Water Reuse 2026 Outlook: Industrial Trends, Tech & ROI

Published: Aug 3, 2026

Water reuse 2026 outlook for industrial plants: MBR, RO, ZLD adoption, regional growth, regulatory drivers, and ROI benchmarks for engineering buyers.

Water Reuse 2026 Outlook: Industrial Trends, Tech & ROI

AI in Wastewater Treatment 2026 Trends: Engineering Data & Buyer Guide

Published: Aug 3, 2026

AI in wastewater treatment 2026 trends: process control gains, 18-32% energy savings, predictive maintenance ROI, and a buyer's framework for evaluating AI-ready equipment.

AI in Wastewater Treatment 2026 Trends: Engineering Data & Buyer Guide

Nutrient Recovery Trends 2026: Technologies, Markets & Industrial Guide

Published: Aug 3, 2026

2026 nutrient recovery trends: struvite, ammonia stripping, microalgae & electrochemical tech. Market data, recovery rates, and industrial buyer guide.

Nutrient Recovery Trends 2026: Technologies, Markets & Industrial Guide

Nutrient Recovery Regional Analysis 2026: APAC, EU & North America

Published: Aug 3, 2026

2026 nutrient recovery regional analysis: North America 35% market share, APAC fastest at 15%+, EU circular economy drivers. Engineering data, capex & process guide.

Nutrient Recovery Regional Analysis 2026: APAC, EU & North America

Biogas from Wastewater Growth Rate 2026: Market Size, Segments & Industrial Outlook

Published: Aug 3, 2026

Biogas from wastewater growth rate 2026: 5.77% CAGR, US$1.92B→US$3.19B by 2034. Segments, regional data, and what it means for industrial plants.

Biogas from Wastewater Growth Rate 2026: Market Size, Segments & Industrial Outlook

MBR Market Growth & Size 2026: Industrial Buyer Data, Segments & Forecast

Published: Aug 2, 2026

MBR market size 2026: $4.8B with 8.2% CAGR through 2030. Industrial buyer breakdown by region, segment, and application with OEM comparison.

MBR Market Growth & Size 2026: Industrial Buyer Data, Segments & Forecast

Smart Water Monitoring Regional Analysis 2026: APAC, North America & EU Buyer Guide

Published: Aug 2, 2026

Smart water monitoring regional analysis 2026 — APAC leads at 11.2% CAGR, North America $9.1B, EU EUDR-driven. Sensor, SCADA & IoT buyer breakdown.

Smart Water Monitoring Regional Analysis 2026: APAC, North America & EU Buyer Guide

AI in Wastewater Treatment 2026 Outlook: Engineering Reality Check

Published: Aug 2, 2026

AI in wastewater treatment 2026 outlook: process control gains, energy savings, real CAPEX impact, and the limits engineers must plan around.

AI in Wastewater Treatment 2026 Outlook: Engineering Reality Check

Water Reuse Growth Rate 2026: Industrial Market Data & Drivers

Published: Aug 2, 2026

Water reuse growth rate 2026: market size, CAGR by region, industrial drivers, and reuse-grade treatment equipment buyers need to specify.

Water Reuse Growth Rate 2026: Industrial Market Data & Drivers

Nature Based Water Solutions 2026 Outlook: Engineering, Cost & Industrial Adoption

Published: Aug 2, 2026

Nature based water solutions 2026 outlook: constructed wetlands, green-grey hybrid systems, performance limits, CAPEX/OPEX benchmarks, and industrial adoption data.

Nature Based Water Solutions 2026 Outlook: Engineering, Cost & Industrial Adoption

PFAS Removal Technology Market Growth Rate 2026 Guide

Published: Aug 2, 2026

The PFAS removal technology market is growing at 11.0% CAGR for treatment media in 2026 (US$ 2.89B toward US$ 8.20B by 2036), against 6.99% for whole filtration systems. GAC holds 32.0% of media spend; NPDWR, EU DWD 2020/2184, and China GB 5749-2022 drive procurement. Buyers face 16-24 week lead times and 20-25% implied media inflation by 2028.

PFAS Removal Technology Market Growth Rate 2026 Guide

Membrane Technology Market Key Players 2026: Top 10 OEMs & Buyers' Guide

Published: Aug 1, 2026

Membrane technology market key players in 2026 include Veolia, DuPont, Toray, and leading Asian MBR OEMs ranked by industrial installed base. This buyers' guide covers membrane-type matching, regional share, replacement costs of $40-$90/m² for PVDF, and a five-step shortlist workflow. Lead times of 16-24 weeks and 8-12% replacement-price rises in 2024-2025 remain the main procurement risks.

Membrane Technology Market Key Players 2026: Top 10 OEMs & Buyers' Guide

Biogas from Wastewater Market Drivers 2026: Data, Demand & Industrial Outlook

Published: Aug 1, 2026

Biogas from wastewater market drivers 2026 — biomethane growth, $89.7B forecast, regulatory push, and what it means for industrial plant buyers.

Biogas from Wastewater Market Drivers 2026: Data, Demand & Industrial Outlook

Smart Water Monitoring Market Drivers 2026: Industrial Buyer Data

Published: Aug 1, 2026

Smart water monitoring market drivers 2026: $19.56B–$33.4B market, 10.4–13.36% CAGR, IoT and AI drivers, and what industrial buyers should spec in RFPs.

Smart Water Monitoring Market Drivers 2026: Industrial Buyer Data

Decentralized Wastewater Treatment Market Drivers 2026: B2B Outlook

Published: Aug 1, 2026

Decentralized wastewater treatment market drivers 2026 — regulatory, cost, and technology forces shaping B2B adoption, with 2025–2026 data and equipment selection guidance.

Decentralized Wastewater Treatment Market Drivers 2026: B2B Outlook

Digital Water Market Drivers 2026: Why Smart Water Tech Is Reshaping Industrial Wastewater

Published: Aug 1, 2026

Discover the top 7 digital water market drivers for 2026 — AI, IoT, water scarcity, regulation & ROI data — and what they mean for industrial buyers.

Digital Water Market Drivers 2026: Why Smart Water Tech Is Reshaping Industrial Wastewater

MBR Market Growth 2026: Regional Analysis & Industrial Buyer Outlook

Published: Aug 1, 2026

MBR market growth 2026: regional analysis showing Asia-Pacific dominance, CAGR 11.26%, and what industrial wastewater buyers should expect through 2033.

MBR Market Growth 2026: Regional Analysis & Industrial Buyer Outlook

Industrial Wastewater Treatment Market Size 2026: $390B Outlook & Buyer Data

Published: Jul 31, 2026

Industrial wastewater treatment market size 2026: global revenue, CAGR 6.8%, top segments, and CAPEX benchmarks. 2026 buyer & engineering data inside.

Industrial Wastewater Treatment Market Size 2026: $390B Outlook & Buyer Data
AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us