Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Medical & Hospital Wastewater Treatment System (ZS-L Series)

Medical & Hospital Wastewater Treatment System (ZS-L Series)
Medical & Hospital Wastewater Treatment System (ZS-L Series)

The ZS-L Series Medical Wastewater Treatment System is a compact, fully automated unit engineered for clinics, dental offices, veterinary hospitals, and small medical facilities. Combining multi-stage filtration with ozone disinfection (99%+ kill rate), it meets EPA and EU Urban Waste Water Directive 91/271/EEC discharge requirements in a footprint as small as 0.5 m² — with no chemical dosing, no noise, and no secondary pollution.

HydropureWater's ZS-L Series is purpose-built for the unique challenges of medical and clinical wastewater. Effluent from surgical suites, dental chairs, laboratories, and veterinary clinics contains pathogenic bacteria, viruses, parasites, pharmaceutical residues, and in some cases radioactive isotopes — all of which require specialized treatment before discharge. The ZS-L integrates multi-stage filtration and high-concentration ozone disinfection into a single, plug-and-play package that requires no operator attendance, no chemical storage, and no dedicated plant room.

Key Features

  • Ultra-compact footprint — designed for facilities with limited floor space; wall-mounted and freestanding options available
  • Fully automatic operation — PLC-controlled start/stop with level sensors; no dedicated operator required
  • Ozone disinfection — achieves ≥99% microbial kill rate without chemical reagents, eliminating ongoing consumable costs
  • No secondary pollution — ozone decomposes to oxygen; no chlorinated byproducts or residual chemicals
  • Silent operation — vibration-free design suitable for installation inside clinical buildings
  • Aesthetic, modular enclosure — stainless steel or powder-coated housing; easily relocated if the facility moves
  • Stable, reliable effluent quality — consistent performance regardless of influent variability

How It Works

Raw wastewater from medical fixtures flows by gravity (or low-head pump) into the ZS-L unit, where it passes through a multi-stage treatment train:

  • Stage 1 — Coarse screening & sedimentation: Removes gross solids and settleable matter.
  • Stage 2 — Multi-media filtration: Layered filter media captures suspended solids, colloidal particles, and partial organic load.
  • Stage 3 — Activated carbon adsorption: Removes residual organics, pharmaceutical traces, and color.
  • Stage 4 — Ozone contact disinfection: A built-in ozone generator produces high-concentration O₃ that is injected into a contact chamber, destroying pathogens including antibiotic-resistant bacteria, viruses, and parasitic cysts. Contact time and ozone dose are automatically regulated.

Treated effluent meets discharge standards and can be released to the municipal sewer or, where permitted, to surface water.

Technical Specifications

ParameterSpecification
Treatment Capacity0.5 – 10 m³/day (model dependent)
Disinfection MethodOzone (O₃), ≥99% kill rate
Power Supply220V / 50Hz single phase
Power Consumption0.5 – 1.5 kW
FootprintFrom 0.5 m² (wall-mounted) to 2.0 m²
Noise Level< 45 dB(A)
Chemical DosingNone required
Control SystemPLC with automatic level-sensing start/stop
Enclosure Material304 Stainless Steel / Powder-coated Carbon Steel
Applicable StandardsEPA NPDES, EU Directive 91/271/EEC, WHO Guidelines

Applications

  • Dental & oral surgery clinics — amalgam-bearing and pathogen-laden wastewater
  • Outpatient medical clinics — general practice, ophthalmology, dermatology
  • Small hospitals — facilities with ≤ 20 beds or equivalent daily flow
  • Veterinary hospitals & animal laboratories — zoonotic pathogen control
  • Cosmetic surgery & aesthetic treatment centers
  • Medical & pharmaceutical laboratories — biological safety waste streams
  • Community health centers & rural clinics — remote locations without sewer access

Why Choose HydropureWater Medical Wastewater Systems?

Medical facilities face strict regulatory requirements for wastewater discharge — yet most small clinics lack the space, budget, or staff for conventional treatment plants. The ZS-L Series solves this with a turnkey, zero-chemical, zero-noise system that fits in a utility closet and runs unattended. Ozone disinfection delivers superior pathogen destruction compared to chlorine-based methods, with no chemical procurement, no DBP formation, and no residual handling. Hundreds of ZS-L units are operating across hospitals, clinics, and veterinary facilities worldwide, backed by HydropureWater's commissioning support and 24-month warranty.

Frequently Asked Questions

What types of medical facilities is the ZS-L designed for?

County-level hospitals (≤200 beds), community clinics, dental offices, veterinary clinics, beauty/cosmetic clinics, and small laboratory wastewater treatment.

Does the ZS-L system require chemical reagents?

No, ozone disinfection achieves ≥99% sterilization without chemical consumables — zero ongoing reagent costs.

What discharge standards does the system meet?

Meets China's "Medical Institution Wastewater Discharge Standards" and comparable international regulations for pathogen, COD, and BOD₅ removal.

Can the system be installed inside a building?

Yes, compact footprint, silent vibration-free operation, and aesthetic enclosure allow indoor installation without disrupting clinical operations.

Project References

  • Jiangxi People's Hospital — laboratory wastewater treatment
  • Community Dental Clinics — wastewater treatment installations for dental practices
  • Veterinary & Beauty Clinics — wastewater systems for veterinary and cosmetic facilities

After-Sales Service & Support

  • 12-Month Full Warranty — covers all manufacturing defects in materials and workmanship
  • Lifetime Technical Support — our engineering team provides remote diagnostics and troubleshooting assistance
  • Spare Parts Guarantee — critical spare parts shipped within 48 hours worldwide
  • On-Site Commissioning — factory-trained engineers available for installation supervision and operator training
  • Preventive Maintenance Programs — customized maintenance schedules to maximize equipment lifespan

Ready to Solve Your Wastewater Challenges?

Get a free consultation and customized quote from our engineering team.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us