SK On Battery Plant Wastewater Treatment in Hungary: 2026
A practical 2026 guide to segregating, treating and discharging wastewater from SK On battery plants in Hungary under site-specific permit and EIA conditions.
Wastewater Treatment Equipment Maintenance: 2026 Annual Plan
Build an annual wastewater treatment equipment maintenance plan covering inspections, schedules, compliance, spare parts, digital records, and predictive tools.
Textile Wastewater Treatment in Costa Rica: 2026 Guide
Compare DAF, MBR and wetland treatment options for Costa Rican textile plants, with discharge limits, process steps, costs and sizing guidance.
Data Center Wastewater and Cooling Blowdown Treatment in Bokaro
Plan wastewater and cooling blowdown treatment for a Bokaro data center with stream-specific sizing, UF/RO guidance, recovery targets, compliance checks and costs.
Mining Wastewater Pretreatment for Sewer Discharge in 2026
Learn how mining and metals plants near Bryants Store meet POTW pretreatment limits through pH control, DAF, filtration, sludge handling, and monitoring.
How to Select a Dissolved Air Flotation System for FOG and TSS
Plant-engineer checklist for selecting dissolved air flotation when FOG or light TSS dominate, versus a clarifier for dense solids, with food-plant and mining paths, sizing cues, and the data to put in an RFQ.
B.C. flooding forces Pemberton plant evacuations, November 2026
Flooding on British Columbia’s south coast prompted evacuation orders covering Pemberton’s wastewater treatment facility and other assets amid high-risk river levels, according to a report published 13 November 2026. Heavy rain also triggered flood warnings and the shutdown of a water treatment plant, while the Lilʼwat Nation issued evacuation instructions along the Lillooet River corridor. In Sayward, a water conservation notice followed extra sediment entering the water from Newcastle Creek. The source did not report affected plant capacities, operating status or costs, leaving design flow, treatment performance, discharge compliance and resilience requirements to be established before any equipment specification.
Kenya conference highlights wastewater risks and 84% sewer gap, November 2026
Kenyan water, sanitation and irrigation stakeholders warned on 3 November 2026 that inadequate wastewater management is threatening rivers, groundwater and food safety. The concerns were raised at the second Water, Sanitation and Irrigation Conference in Nairobi on 23 October. The country’s 2024-2025 sector report put sewerage connections at 16 per cent of the population, prompting questions about waste from the remaining 84 per cent. Speakers also called for review of the Water Act to address on-site sanitation and for distribution infrastructure upgrades as non-revenue water rose from 43 per cent to 48 per cent.
Mexico Opens Sanctions Proceedings Over Nazas River Wastewater, November 2026
Mexico opened sanctions proceedings over reported dairy and textile wastewater releases affecting the Nazas River in Gómez Palacio, according to a report published on 3 November 2026. Federal inspectors examined a failed wastewater pumping station and found chemical constituents and a high organic load associated with direct industrial discharges. Follow-up is assigned to Conagua’s Organismo de Cuenca Cuencas Centrales del Norte and Sideapa. For plant operators and buyers, the case highlights pretreatment, discharge-control auditing, containment, pumping resilience and the need to define flow, BOD/COD and compliance limits before treatment equipment is specified.
PTFE ammonia system enters service at Indonesian chemical plant
Shanghai QILEE announced on 17 November 2026 that a 120 m³/day PTFE membrane ammonia removal system had been commissioned and operationally validated at a chemical manufacturer in Java, Indonesia. Reported audits found ammonia nitrogen at no more than 15 mg/L from influent levels of 1,800–2,500 mg/L, with removal efficiency exceeding 99 percent. The installation also recovers ammonium sulfate for sale as liquid fertilizer, eliminates fugitive ammonia emissions and uses less footprint than the former stripping installation.
Mississauga wastewater plant modernization targets odour, Nov 2026
Peel Region’s G.E. Booth Water Resource Recovery Facility modernization in Mississauga is expected to reduce community odours by more than 90 per cent once completed, according to a report published November 12, 2026. Approximately half of the odour-mitigation program is scheduled for completion by the end of 2026, with most work planned for 2027. The facility has a reported capacity of 518 million litres per day and is being expanded to address population growth, including a development bringing approximately 16,000 new homes. Provincial funding of $35 million supports system extensions, aeration and filtration features.
Resistant yeast found in Brazil poultry slaughterhouse wastewater
A report published on 10 November 2026 says Brazilian researchers recovered Candida palmioleophila from poultry slaughterhouse wastewater for the first time. The isolate came from a treatment plant serving a major Rio de Janeiro processor and was resistant to fluconazole but susceptible in vitro to three other tested antifungals. The study used one raw sewage sample collected in August 2024, so it documents presence in one effluent rather than prevalence across the industry. For operators, the finding supports including fungal monitoring and susceptibility evidence when specifying biological treatment, tertiary treatment or disinfection for poultry-processing wastewater.
Canada geese occupy Healdsburg solar array, November 2026
A report published on 16 November 2026 says Canada geese occupied one edge of Healdsburg, California’s 11,600-panel floating solar array over treated sewage ponds. The 4.78-megawatt system, completed in January 2021, covers two ponds and roughly 8 percent of the city’s electricity use. Bird droppings are already part of routine panel maintenance, while researchers say concentrated waste can affect water chemistry and questions remain about hardware leaching and long-term bird behavior. For operators, the event highlights wildlife access, cleaning, monitoring and treated-water quality considerations when adding floating solar to reclaimed-water facilities.
JS-WEL outlines wastewater reuse approach for Indian manufacturers, November 2026
In a TimesTech interview published on 16 November 2026, Shefali Nanda, Executive Director of JS Water Energy Life, presented the company’s biotechnology-led approach to industrial wastewater treatment and reuse in Indian manufacturing. The reported strategy combines phycoremediation, bioremediation, specialised biological formulations and complementary technologies, with potential applications in existing treatment systems. Nanda said water scarcity can interrupt production, raise costs and tighten compliance pressure. JS-WEL also stressed that treatment performance and reuse suitability depend on effluent characteristics, operating conditions, contaminant concentrations and the intended reuse standard, making site-specific testing and validation essential. No plant flow rate, capacity or contaminant profile was reported.
Mexico Pledges Tijuana River Work in San Diego, November 2026
In a report published on 10 November 2026, Mexico’s ambassador to the United States, Roberto Lazzeri, pledged work during a San Diego visit on the Tijuana River pollution crisis. Mexico is studying whether to expand the San Antonio de los Buenos wastewater plant or build additional infrastructure after prior projects including Tecolote-La Gloria and a sediment basin in Smuggler’s Gulch. No specific timeline, plant capacity or treatment-process package was reported. The original USMCA included $300 million for border wastewater infrastructure, while the ambassador said resources were being secured for required works. Operators should await design flow, load, discharge criteria and equipment scope before specifying capacity or selecting suppliers.
Supreme Court expands Yamuna cleanup plan for Delhi, Nov 2026
In a report published 17 November 2026, the Supreme Court backed a coordinated approach to cleaning the Yamuna, directing stronger pollution controls, drain interception, plant metering and real-time monitoring. The draft plan envisages 125 new STPs, 12 CETPs and upgrades across the basin, while addressing 520 drains carrying approximately 9,666.81 MLD of wastewater. For operators and buyers, the immediate significance is greater emphasis on treatment-process performance, instrumented discharge monitoring and live reporting rather than construction alone. The next hearing is scheduled for 13 January 2027.
Tijuana sewage plant expansion faces funding gap, November 2026
In a report published 16 November 2026, The Coronado News said elected officials identified a funding gap at the South Bay International Wastewater Treatment Plant, which treats Tijuana sewage. The expansion is designed to raise capacity from up to 35 million gallons per day to 50 million gallons per day, but about $270 million more was still needed for full secondary treatment. A separate $552 million contract covers primary-treatment expansion. For plant managers and procurement teams, the key issue is that primary works are under contract while the biological treatment package remains without secured funding and has no confirmed impact on the delivery schedule.
Hyderabad expands treated-water reuse for construction, Nov 2026
On 16 November 2026, the Hyderabad Metropolitan Water Supply and Sewerage Board expanded its push to supply treated water to construction sites, targeting 100 million litres per day in the first phase. The plan combines green water tankers with proposed dedicated pipelines from sewage treatment plant filling stations. Officials also directed tighter tanker dispatch records, station equipment and regular monitoring. Earlier coverage identified construction, industry and landscaping as reuse outlets and reported 1.5 MLD of capacity from 51 registered private treatment plants. For treatment-plant operators and suppliers, the initiative expands the market for qualifying non-potable reuse and associated delivery and monitoring infrastructure.
Supreme Court warns Yamuna states on pollution penalties, Nov 2026
In reports published on 16 November 2026, the Supreme Court warned Yamuna basin states and union territories that worsening pollution could trigger financial penalties, while nearly 520 drains discharge wastewater into the river. The court directed jurisdiction-level water-quality monitoring, source control of untreated sewage and industrial pollutants, and greater access for inspections and sampling. For wastewater operators and buyers, the immediate implications are stronger discharge-data obligations, pressure to prevent wastewater entering the river, and closer scrutiny of treatment performance. The order was dated 4 November, with further hearing scheduled for 13 January.
Mexican mines formalize continuous CONAGUA water compliance, Nov 2026
In a report published on 12 November 2026, Mexico Business News said mining operators across Mexico were formalizing digital telemetry, accredited laboratory testing and closed-loop water recycling to maintain continuous compliance with CONAGUA extraction concessions and wastewater discharge permits. CAMIMEX President Pedro Rivero said affiliated companies recirculated 73% of their operational water volume. Supporting coverage reported process-water recirculation above 85% in northern mining operations using thickening, dry-stack tailings and zero-liquid-discharge systems. The compliance and recovery measures matter to plant operators because meter discrepancies, exceedances or permit failures can lead to sanctions, closures and concession forfeiture.
Veolia wins Brazil pulp-mill wastewater plant contract, Nov 2026
On 3 November 2026, Arauco selected Veolia to design and implement the industrial effluent treatment plant for the new Sucuriú pulp mill in Inocência, Mato Grosso do Sul, Brazil. The US$4.6 billion pulp-mill project is planned to produce 3.5 million tonnes of short-fiber pulp annually and begin operations by late 2027. Veolia’s treatment line will process 10,600 cubic meters per hour, equivalent to 254,400 cubic meters per day, using a moving bed bioreactor combined with activated sludge treatment and belt presses for sludge dewatering. For treatment buyers, the award illustrates the scale of biological and sludge-handling equipment being integrated into a major industrial project.
Battery Plant Wastewater Treatment in Germany: 2026 Guide
A practical 2026 guide to wastewater treatment for SK On battery plants in Germany, covering source segregation, pretreatment, permitting and equipment selection.
Rural Sewage Treatment Systems in Costa Rica: 2026 Guide
Compare septic, WSZ package plant and MBR options for rural sewage treatment in Costa Rica, including approval routes, sizing and site requirements.
Data Center Wastewater and Cooling Blowdown Treatment in Albuquerque
Engineering guidance for treating an Albuquerque data center’s cooling blowdown, industrial wastewater, sewer discharge and reuse water in 2026.
Fabricated Metals Wastewater Pretreatment in 2026
Learn how Moss Point-area fabricated metals plants meet sewer pretreatment limits through equalization, chemical treatment, DAF clarification, monitoring and polishing.
DAF vs. Clarifier for Semiconductor Wastewater in 2026
Compare DAF and clarifiers for semiconductor wastewater, with guidance on solids, chemical conditioning, reuse, sizing, operating costs, and pretreatment.
How Pune Factories Treat High-COD Trade Waste in 2026
Learn how Pune manufacturers characterize, pretreat and reduce high-COD trade waste using DAF, biological treatment, sludge handling and reuse systems.
Belt Filter Presses for Detergent Wastewater: 2026 Guide
Learn how belt filter presses dewater detergent wastewater, including polymer conditioning, operating parameters, sizing inputs, troubleshooting and equipment selection.
SK On Battery Plant Wastewater Treatment in Mexico
Engineering roadmap for handling wastewater from SK On battery plants in Mexico, covering segregation, treatment, discharge, monitoring and equipment selection.
Rural Sewage Treatment Equipment for Bangladesh: 2026 Guide
Compare decentralized sewage treatment equipment for rural Bangladesh, including process selection, sizing, installation, maintenance, and procurement priorities.