Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Automatic Chemical Dosing System

Automatic Chemical Dosing System
Automatic Chemical Dosing System

HydropureWater automatic chemical dosing systems provide precise, PLC-controlled injection of coagulants, flocculants, pH adjusters, and specialty chemicals for water and wastewater treatment. Skid-mounted, pre-wired, and factory-tested for rapid installation.

Accurate chemical dosing is critical to every water and wastewater treatment process — from coagulation and flocculation through pH correction, disinfection, and scale inhibition. HydropureWater automatic dosing systems integrate solution preparation tanks, precision metering pumps, in-line mixers, safety devices, and PLC-based controls on a single pre-assembled skid. Each system is factory-wired, piped, and tested so it can be connected to your process within hours of delivery, eliminating field-fabrication errors and reducing commissioning time.

Key Features

  • Fully integrated skid: solution tank with agitator, metering pump(s), pulsation dampener, safety relief valve, back-pressure valve, calibration column, and all interconnecting piping
  • Precise metering pump technology: mechanical diaphragm, hydraulic diaphragm, or plunger — selected to match chemical viscosity, flow rate, and pressure requirements
  • PLC + HMI control with analog 4–20 mA input from pH, ORP, turbidity, or flow instruments for closed-loop proportional dosing
  • Chemical-resistant wetted parts: PP, PVC, PVDF, or SS316L — matched to each reagent
  • Tank materials: LLDPE, HDPE, PP, rubber-lined carbon steel, or SS304/316L depending on chemical compatibility
  • Tank-level indication with low-level alarm and automatic pump lockout
  • Modular design allows multi-chemical stations (2–6 chemicals) on a shared platform
  • Compact footprint and drip containment for indoor or outdoor installation

How It Works

Dry or liquid chemical stock is loaded into the solution preparation tank, where a motorized agitator dissolves and homogenizes the reagent to the target concentration. The PLC continuously reads the process signal (e.g., pH, ORP, residual chlorine, or flow rate) from in-line analysers and calculates the required dose. It then drives one or more metering pumps to inject the prepared solution into the process stream through an injection quill and static mixer. A pulsation dampener smooths pump output, and a back-pressure valve ensures consistent injection pressure regardless of process-line fluctuations. When the tank level drops below a configurable setpoint, the system triggers an alarm and optionally locks out the pump to prevent dry running. All operating parameters — dose rate, tank level, pump status, and alarms — are displayed on the HMI touchscreen and can be transmitted to a central SCADA system via Modbus or Ethernet.

Technical Specifications

System TypeTypical ChemicalTank MaterialPump Type
PAC Dosing (Coagulant)Poly-aluminium chloride / Ferric chloridePE / PP / Rubber-lined CSMechanical diaphragm / Plunger
PAM Dosing (Flocculant)Polyacrylamide (anionic / cationic)PE / PP / PVCMechanical diaphragm / Screw
Acid / Alkali pH AdjustmentHCl, H₂SO₄, NaOH, Ca(OH)₂PE / PP / Rubber-lined CSHydraulic diaphragm / Plunger
Phosphate DosingTrisodium phosphate / HEDPSS304 / SS316LMechanical diaphragm
Hydrazine / Ammonia DosingHydrazine / Ammonia solutionSS304 / SS316LHydraulic diaphragm
Cooling Water TreatmentCorrosion inhibitor / AntiscalantPE / PPMechanical diaphragm
Fully Automatic 3-in-1Multi-chemical integratedPer chemicalMech. diaphragm / Pneumatic diaphragm / Screw
ParameterRange
Solution Tank Capacity50 – 5,000 L (custom up to 20,000 L)
Metering Pump Flow Range1 – 2,000 L/h
Maximum Discharge PressureUp to 2.5 MPa (25 bar)
Dosing Accuracy± 1% (steady state)
Agitator Speed30 – 120 RPM (variable frequency available)
Power Supply380V / 50Hz / 3-phase or 220V / 50Hz single-phase
Control SystemSiemens / Mitsubishi PLC with HMI; Modbus RTU / TCP output
Ambient Temperature-10 °C to +45 °C (heated enclosure option for cold climates)
Protection RatingIP54 control panel (IP65 available)
ComplianceCE marking; designed per EU Machinery Directive 2006/42/EC

Applications

  • Municipal Water Treatment: Coagulant and disinfectant dosing in drinking water plants
  • Industrial Wastewater: pH neutralisation, coagulation-flocculation, and heavy-metal precipitation
  • Power Generation: Boiler water chemistry control — phosphate, hydrazine, ammonia, and oxygen scavenger dosing
  • Cooling Circuits: Corrosion inhibitor, antiscalant, and biocide dosing for open and closed loops
  • Oil & Gas: Demulsifier, scale inhibitor, and H₂S scavenger injection
  • Food & Beverage: CIP chemical dosing, pH adjustment, and process-water conditioning
  • Desalination: Antiscalant and acid dosing upstream of RO membranes
  • Textile & Dyeing: Colour-removal coagulant and pH adjustment in effluent treatment

Why Choose HydropureWater Chemical Dosing Systems?

HydropureWater has supplied over a thousand dosing installations across power, petrochemical, municipal, and manufacturing sectors. Every system is custom-configured: we select pump technology, wetted materials, tank size, and control logic to match your specific chemical, flow rate, and process-control strategy. Pre-assembled, factory-tested skids arrive ready to connect — reducing your installation time, ensuring first-dose accuracy, and giving your operations team a single vendor to call for pumps, parts, and process support.

Frequently Asked Questions

What types of chemicals can be dosed?

PAC (coagulant), PAM (flocculant), acid/alkali for pH adjustment, sodium hypochlorite, phosphate salts, corrosion inhibitors, and non-standard reagents.

What metering pump technologies are available?

Mechanical diaphragm, hydraulic diaphragm, and plunger pumps — selected based on chemical viscosity, flow rate, and pressure requirements.

Can the dosing system be controlled automatically?

Yes, PLC-based closed-loop control with 4–20 mA input from pH, ORP, turbidity, or flow instruments for proportional dosing.

What tank materials are used?

PE, PP, PVC for standard chemicals; SS304/316L for aggressive reagents; rubber-lined carbon steel for large volumes.

Project References

  • DAF and Sedimentation System Integration — paired dosing across municipal and industrial installations
  • Water Treatment Plant Coagulant Dosing Stations — automated PAC/PAM dosing for clarification
  • Boiler Water Conditioning — circulating water chemical treatment and corrosion control

After-Sales Service & Support

  • 12-Month Full Warranty — covers all manufacturing defects in materials and workmanship
  • Lifetime Technical Support — our engineering team provides remote diagnostics and troubleshooting assistance
  • Spare Parts Guarantee — critical spare parts shipped within 48 hours worldwide
  • On-Site Commissioning — factory-trained engineers available for installation supervision and operator training
  • Preventive Maintenance Programs — customized maintenance schedules to maximize equipment lifespan

Proposed for These Projects

Engineering assessments where this product is part of our proposed solution. These projects are not yet delivered.

Project demand matrix →

Ready to Solve Your Wastewater Challenges?

Get a free consultation and customized quote from our engineering team.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us