Proposed treatment for pharmaceutical wastewater based on a single lamella clarifier, subject to source, flow, loading and effluent-duty confirmation.
Project Background
The design basis is 300 m³/d for a pharmaceutical wastewater application with one lamella clarifier containing 24 inclined plates. Influent source, TSS, pH, flow profile, discharge route and required outlet quality remain unconfirmed. The proposed scope is suitable for preliminary engineering assessment only until wastewater characteristics and downstream treatment or discharge requirements are established.
Our Solution
The proposed solution uses a high-efficiency lamella clarifier to remove settleable solids after coarse screening, flow equalisation, coagulation and pH conditioning. Inclined plates provide compact clarification, while a downstream polishing and disinfection arrangement can be added according to the confirmed reuse or discharge duty. Settled sludge should be thickened and dewatered using a plate-and-frame filter press or another client-approved method, with residues stored and disposed of or reused under applicable requirements. A chemical dosing system is proposed where jar testing indicates a need for coagulant or pH control. Equipment material, coating, plate construction, hydraulic loading, detention time and solids handling will be finalised after the client supplies water-quality, flow and outlet data.
What We Asked First
Please confirm the wastewater source and provide TSS, pH and other relevant analyses. Also confirm operating hours, peak flow, discharge or reuse destination, required outlet limits, applicable standards and any chemical, sludge and containment requirements.
Proposed Process Train
- 1Influent characterisation and flow equalisation
- 2coarse screening
- 3coagulation and pH conditioning
- 4lamella sedimentation
- 5clarified water polishing
- 6disinfection if required
- 7sludge thickening and dewatering
- 8containerised sludge disposal or client-approved reuse
For Similar Projects
Prepare the wastewater source description, analytical report, flow records, effluent limits and sludge-disposal requirements so hydraulic loading, treatment stages and equipment materials can be finalised.
Ref. A-035. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).