Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Oil & Gas — water evidence database

Public guides, reported developments and reviewed evidence. Counts describe this library’s coverage.

Explore relationships
Partial: confirmed material onlyPartial coveragePublic snapshot · UTC+8

Related guides
253
Reported events
1
Reviewed facts
0
Published dossiers
0
Independent sources
1

Guides are article candidates, events are source-supported reports, and facts are reviewed records. Countries and industries overlap; grouped counts cannot be added into a global total.

Country × industry coverage

Select a cell to inspect its records. Coverage measures published material, never market size, factories or local project volume.

Related guides · more published material
Select a cell to inspect its records. Coverage measures published material, never market size, factories or local project volume.
CountryTextileFood & BeverageChemical ManufacturingPharmaceutical ManufacturingOil & GasMunicipal Wastewater
Algeria13—116
Angola33—115
Argentina1511—1
Australia24—1121
Azerbaijan———1——
Bahrain1111—6
Bangladesh81—2—1
Bolivia1—————
Brazil141119
Cambodia22—1—2
Cameroon23—1—4
Canada252——26
Chile13—1—1
China5111—1
Colombia13———1
Costa Rica—1———1
Cyprus—————1
Czech Republic—1———2
Denmark—2—1—1
Dominican Republic121——1
Ecuador1321—1
Egypt42—1—8
Ethiopia23—1—1
Fiji—————1
Finland—1———1
France131——4
Germany13—2—1
Ghana23—1—6
Greece—1———1
Hungary—2————
India341745—50
Indonesia11631—15
Iran645118
Iraq131128
Ireland—3———2
Israel11———5
Italy12—1—3
Ivory Coast11—1—4
Japan1111—1
Jordan21—1—6
Kazakhstan11—115
Kenya43—113
Kuwait133—27
Malaysia16—3—6
Mexico3413—16
Mongolia11———1
Montenegro—1————
Morocco6311—9
Mozambique31—1—6
Myanmar1111—1
Namibia—————1
Nepal32—1—1
Netherlands12———2
New Zealand—2———2
Nigeria543117
Norway11———2
Oman223136
Pakistan1133——6
Panama242——2
Peru44—1—1
Philippines322——5
Poland11—1—3
Portugal12———1
Qatar2321—6
Romania—1———2
Russia—211—1
Rwanda2211—3
Saudi Arabia1741215
Senegal2111—4
Singapore11—1—1
South Africa23—1—13
South Korea21———5
Spain13—1—2
Sri Lanka321——1
Sweden11—1—1
Syria—————1
Tajikistan—————1
Tanzania14—1—1
Thailand37—1—1
Turkey4211—1
Turkmenistan31—1—3
Uganda55—1—5
Ukraine—————1
United Arab Emirates232119
United Kingdom1311—20
United States202463773221564
Uzbekistan41—1—4
Vietnam5313—10

A dash means coverage is unknown or unconnected. A verified zero is shown only when the metric scope is known.

Daily public additions

First verified public appearance in this library, by UTC+8 day. Source publication dates do not create historical growth.

Reported eventsReviewed factsPublished dossiersRelated guides
—
—
—
—
—
—
—
—
—
—

History is accumulating. Missing or failed days remain gaps; a single snapshot cannot establish a trend. Historical baseline and backfill are labelled separately.

Inspect recorded days and changes
Day (UTC+8)Coverage statusnew recordsHistorical backfillRevisedWithdrawnRestored
2026-10-15Partial: confirmed material only—0000
2026-10-16Partial: confirmed material only20000
2026-10-17Partial: confirmed material only20000
2026-10-18Partial: confirmed material only30000
2026-10-19Partial: confirmed material only20000
2026-10-20Partial: confirmed material only30000
2026-10-21Partial: confirmed material only31000
2026-10-22Partial: confirmed material only50000
2026-10-23Partial: confirmed material only20000
2026-10-24Partial: confirmed material only10000
2026-10-25Partial: confirmed material only10000
2026-10-26Partial: confirmed material only101700
2026-10-27Partial: confirmed material only10000
2026-10-28Partial: confirmed material only50000
2026-10-29Partial: confirmed material only30000
2026-10-30Partial: confirmed material only60000
2026-10-31Partial: confirmed material only30000
2026-11-01Partial: confirmed material only10000
2026-11-02Partial: confirmed material only20000
2026-11-03Partial: confirmed material only40000
2026-11-04Partial: confirmed material only30000
2026-11-05Partial: confirmed material only—0000

Current sources and reviewed facts

Two separate stocks at the published watermark. No historical stock line is reconstructed from article dates.

Current snapshot only
Independent sources1
Reviewed facts0

Record explorer

Inspect the records behind the selected coverage or day. Source links open the original publisher.

Record typeRecordCountryFirst public verificationEvidence
Guide candidateHow Do Jacksonville Petroleum Plants Meet Pretreatment Limits? 2026English source titleUnited States2026-11-04 15:07Open the record for its evidence
Guide candidateHow Delaware City Petroleum Plants Meet Sewer Limits in 2026English source titleCountry scope not reported2026-11-04 15:07Open the record for its evidence
Guide candidateDAF vs Clarifier for Petroleum Wastewater in 2026English source titleUnited States2026-11-04 15:07Open the record for its evidence
Guide candidateHow Do Petroleum Plants Near Montgomery Meet Sewer Limits?English source titleUnited States2026-11-03 16:00Open the record for its evidence
Guide candidateHow Do Petroleum Refineries Near San Luis Obispo Meet Sewer Limits?English source titleUnited States2026-11-03 16:00Open the record for its evidence
Guide candidateDAF vs Clarifier for Petroleum Wastewater in Lockhart (2026)English source titleUnited States2026-11-03 16:00Open the record for its evidence
Guide candidateHow Do Petroleum Plants Near San Antonio Meet Sewer Limits?English source titleUnited States2026-11-03 16:00Open the record for its evidence
Guide candidateDAF vs. Clarifier for Petroleum Wastewater in 2026English source titleUnited States2026-11-02 14:40Open the record for its evidence
Guide candidateHow Do Petroleum Plants Near Morrilton Meet Pretreatment Limits?English source titleCountry scope not reported2026-11-02 14:40Open the record for its evidence
Guide candidateMBR vs Conventional Activated Sludge for Petroleum Wastewater (2026)English source titleUnited States2026-11-01 17:33Open the record for its evidence
Guide candidateHow Petroleum Bulk Plants Meet Sewer Pretreatment Limits in 2026English source titleUnited States2026-10-31 15:06Open the record for its evidence
Guide candidateMBR vs Conventional Activated Sludge for Petroleum Wastewater in Calera, 2026English source titleUnited States2026-10-31 15:06Open the record for its evidence

Related guides

Technical and news articles provide reading paths and candidate associations; they do not prove a local project or reviewed fact.

More country-specific reading is available through the country links in the coverage table.

Recent reported developments

Source publication and first public verification are separate dates. Reported developments remain observations.

Source published

US EPA detailed study of the petroleum refining industry reviewing refinery wastewater discharges and the existing effluent limitations regulations for potential revision.

Inspect original excerpt
1. Introduction This report summarizes information collected and analyzed by the United States Environmental Protection Agency (EPA) as part of a detailed study of the petroleum refining industry. The EPA conducted this study to review discharges from petroleum refineries and to determine whether the current wastewater discharge regulations for these operations should be revised. The EPA promulgated effluent limitations guidelines and standards (ELGs) for the Petroleum Refining Point Source Category in 1974. The ELGs were challenged in the U.S. Court of Appeals; as a result of the litigation, the EPA made revisions and finalized the ELGs on October 18, 1982.
Original source

First public verification: 2026-10-21 15:40

Comparable water samples

Compare only matching parameter, unit, water stage and scope. Individual facility samples never represent a national average or a continuous water-quality trend.

No group of at least two comparable, reviewed samples is available. Read individual evidence in the published dossiers.

Move from evidence to a treatment discussion

Carry the selected country and industry into your enquiry. Confirm influent conditions, discharge destination and operating scope with the engineering team.

Snapshot scope and provenance
Version
387280b49b0b646ef95693edc7516e84534bb276271d43b038b0e1db94636a24
Industry classification version
2026-10-15.1
Reviewed foundation version
20261015T105811-e19facf957c3
Observation version
f3b00185eebc1d279f1e637dd9480f751c990bf8c4e90d345a292783595b70f3
Public coverage watermark
41c426f3069a97fb4eb5d9e555dc6073cacc4fd3aff7fa1a7fa3cccc7034a022
Historical baseline cutoff
Not reported

Only caller-frozen public records are counted. Language versions and revisions share a record identity; source versions share the independent source identity.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us