Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Equipment & Technology Guide

Looking for guides for a specific country? Browse wastewater treatment guides by country →

SBR Design for Palm Oil Mill Wastewater: 2026 Engineering Parameters & Technology Comparison

Published: Oct 2, 2026

Complete SBR design guide for POME treatment: cycle times, MLSS, F/M ratios, tank sizing, pretreatment needs, and CAPEX/OPEX vs MBR, UASB, ponding systems.

SBR Design for Palm Oil Mill Wastewater: 2026 Engineering Parameters & Technology Comparison

MBBR for Pulp and Paper Wastewater Design: 2026 Engineering Guide

Published: Oct 2, 2026

MBBR design for pulp and paper wastewater in 2026 — HRT, carrier fill ratio, BAS process data and nutrient-limited COD removal rates from peer-reviewed studies.

MBBR for Pulp and Paper Wastewater Design: 2026 Engineering Guide

What Is F/M Ratio in Activated Sludge? 2026 Process Guide

Published: Oct 2, 2026

F/M ratio in activated sludge explained: formula, typical 0.2–0.5 range, what high/low values mean, and how to fix filamentous bulking and pinpoint sludge issues.

What Is F/M Ratio in Activated Sludge? 2026 Process Guide

Oil and Grease Removal from Industrial Wastewater: 2026 Expert Guide to Technologies & Compliance

Published: Oct 2, 2026

Master oil and grease removal from industrial wastewater in 2026. Explore DAF systems, chemical coagulation, and physical separation methods to meet strict discharge limits (5-20 mg/L).

Oil and Grease Removal from Industrial Wastewater: 2026 Expert Guide to Technologies & Compliance

How to Remove Suspended Solids from Wastewater: 2026 Process Guide

Published: Oct 2, 2026

Step-by-step methods to remove suspended solids from wastewater — screening, DAF, settling, filtration, and biological options with 2026 efficiency data.

How to Remove Suspended Solids from Wastewater: 2026 Process Guide

How to Remove Total Phosphorus from Wastewater (2026 Guide)

Published: Oct 2, 2026

Learn how to remove total phosphorus from wastewater using chemical precipitation, BNR, and tertiary filtration — with 2026 effluent targets, dose data, and process comparisons.

How to Remove Total Phosphorus from Wastewater (2026 Guide)

How to Remove Total Nitrogen from Wastewater (2026 Methods Guide)

Published: Oct 2, 2026

Learn how to remove total nitrogen from wastewater in 2026: nitrification-denitrification, anammox, MAP precipitation, and membrane recovery compared with parameters.

How to Remove Total Nitrogen from Wastewater (2026 Methods Guide)

How to Remove Ammonia Nitrogen from Wastewater: 2026 Methods

Published: Oct 2, 2026

Remove ammonia nitrogen from wastewater with biological, chemical and physical methods. Compare 2026 process performance, costs and design parameters for industrial plants.

How to Remove Ammonia Nitrogen from Wastewater: 2026 Methods

Activated Carbon Filter for Adhesive Manufacturing Wastewater (2026 Guide)

Published: Oct 2, 2026

Activated carbon filter for adhesive manufacturing wastewater: GAC vs PAC, resin/VOC removal data, and 2026 design specs for effluent polishing.

Activated Carbon Filter for Adhesive Manufacturing Wastewater (2026 Guide)

Activated Carbon Filter for Vaccine Manufacturing Wastewater (2026 Guide)

Published: Oct 2, 2026

2026 guide to activated carbon filters for vaccine manufacturing wastewater — GAC media selection, design parameters, and PFAS compliance.

Activated Carbon Filter for Vaccine Manufacturing Wastewater (2026 Guide)

Activated Carbon Filter for Pharmaceutical API Wastewater (2026 Guide)

Published: Oct 2, 2026

2026 engineering guide to activated carbon filters for pharmaceutical API wastewater — GAC vs PAC vs BACF, EBCT design, regeneration, and 2026 compliance.

Activated Carbon Filter for Pharmaceutical API Wastewater (2026 Guide)

Activated Carbon Filter for Vitamin Manufacturing Wastewater (2026 Guide)

Published: Oct 1, 2026

2026 guide to activated carbon filters for vitamin manufacturing wastewater — GAC/PAC selection, EBCT design, vitamin recovery, and pharmaceutical discharge compliance.

Activated Carbon Filter for Vitamin Manufacturing Wastewater (2026 Guide)

Switching From Lagoon to MBR Wastewater Treatment: 2026 Engineering Guide

Published: Oct 1, 2026

Switching from lagoon to MBR wastewater treatment in 2026? Compare footprint, effluent quality, capex/opex, retrofit steps, and when MBR beats lagoon systems.

Switching From Lagoon to MBR Wastewater Treatment: 2026 Engineering Guide

Affordable Mine Site Wastewater Treatment: 7-Step Process Guide 2026

Published: Oct 1, 2026

Affordable mine site wastewater treatment in 7 practical steps: dewatering, screening, DAF, sedimentation, MBR, sludge handling and ZLD. 2026 cost data.

Affordable Mine Site Wastewater Treatment: 7-Step Process Guide 2026

Bar Screens in Wastewater Treatment: 2026 Engineering Guide

Published: Oct 1, 2026

Bar screens in wastewater treatment: bar spacing, headloss, cleaning cycles, materials, and how to specify a mechanical screen for municipal and industrial headworks.

Bar Screens in Wastewater Treatment: 2026 Engineering Guide

Semiconductor Wastewater Pretreatment & Membrane Fouling Prevention: 2026 Engineering Guide

Published: Oct 1, 2026

Cut RO membrane fouling in semiconductor fabs with 2026 pretreatment specs — coagulation, DAF, UF and CIP strategies for silica, TMAH and CMP wastewater.

Semiconductor Wastewater Pretreatment & Membrane Fouling Prevention: 2026 Engineering Guide

Sewage Treatment with Anoxic Aeration & MBR: 2026 Calculation Guide

Published: Oct 1, 2026

Step-by-step 2026 engineering guide to sizing an A/O + MBR sewage treatment plant: anoxic/aerobic tank volume, MBR flux, HRT/SRT, MLSS and membrane area calculations.

Sewage Treatment with Anoxic Aeration & MBR: 2026 Calculation Guide

Semiconductor Wastewater Pretreatment Methods to Control Membrane Fouling (2026 Guide)

Published: Oct 1, 2026

Compare 2026 semiconductor wastewater pretreatment methods that control membrane fouling — coagulation, DAF, ceramic UF, advanced oxidation and process parameters.

Semiconductor Wastewater Pretreatment Methods to Control Membrane Fouling (2026 Guide)

SBR Water Treatment: Process, Design & 2026 Buying Guide

Published: Oct 1, 2026

SBR water treatment explained: the five-stage fill-and-draw cycle, design parameters, advantages vs conventional activated sludge, and how to size an SBR in 2026.

SBR Water Treatment: Process, Design & 2026 Buying Guide

Best Clarifier Types for Municipal Wastewater Treatment (2026 Comparison)

Published: Oct 1, 2026

Compare the best clarifier types for municipal wastewater treatment in 2026 — primary, secondary, lamella, DAF — with SOR data, removal rates, and selection guidance.

Best Clarifier Types for Municipal Wastewater Treatment (2026 Comparison)

SBR Sewage Treatment Plant: Process, Design & 2026 Buyer's Guide

Published: Oct 1, 2026

Complete 2026 guide to SBR sewage treatment plants — fill-and-draw process steps, EPA design parameters, removal rates, CAPEX/OPEX, and SBR vs MBR vs activated sludge.

SBR Sewage Treatment Plant: Process, Design & 2026 Buyer's Guide

Best Clarifier Type for Municipal Wastewater Treatment: 2026 Selection Guide

Published: Oct 1, 2026

Compare primary vs secondary, circular, rectangular, and lamella clarifiers for municipal wastewater. Engineering specs, SOR, costs, and 2026 selection criteria.

Best Clarifier Type for Municipal Wastewater Treatment: 2026 Selection Guide

Most Reliable Biosolids Dewatering Methods 2026: Process Comparison

Published: Oct 1, 2026

Compare the most reliable biosolids dewatering methods in 2026. Get cake-solids targets, polymer dose ranges, and a decision framework for plate presses, centrifuges, and belt presses.

Most Reliable Biosolids Dewatering Methods 2026: Process Comparison

Best Centrifuge for Sludge Dewatering in Municipal WWTPs (2026 Guide)

Published: Oct 1, 2026

Compare decanter, disk-stack and scroll centrifuges for municipal sludge dewatering. Specs, polymer trade-offs, CAPEX vs filter press, 2026 selection guide.

Best Centrifuge for Sludge Dewatering in Municipal WWTPs (2026 Guide)

Nanofiltration System Design Guide 2026: Specs, Process & Cost

Published: Sep 30, 2026

2026 nanofiltration system design guide covering pore size, pressure 4.5–7.5 bar, spiral-wound modules, MWCO selection, fouling control and CAPEX/OPEX data.

Nanofiltration System Design Guide 2026: Specs, Process & Cost

RO System Design Parameters: 2026 Engineering Guide for Industrial Plants

Published: Sep 30, 2026

RO system design parameters explained: feedwater SDI, recovery rates, flux, NDP, salt rejection, and pretreatment sizing for industrial wastewater plants.

RO System Design Parameters: 2026 Engineering Guide for Industrial Plants

Decanter Centrifuge Working Principle: 2026 Engineering Guide

Published: Sep 30, 2026

How a decanter centrifuge separates solids from liquids: bowl, scroll, differential speed, G-force, beach angle, and key operating parameters for 2026.

Decanter Centrifuge Working Principle: 2026 Engineering Guide

Screw Press Design Parameters: 2026 Engineering Guide

Published: Sep 30, 2026

Screw press design parameters explained for 2026 — screw geometry, screen basket, back-pressure, polymer dose, and throughput sizing for sludge dewatering.

Screw Press Design Parameters: 2026 Engineering Guide

Filter Press Design Parameters: 2026 Engineering Guide

Published: Sep 30, 2026

Filter press design parameters explained for 2026 — filtration area, cake thickness, feed pressure, cycle time, pump sizing and cloth selection with real data.

Filter Press Design Parameters: 2026 Engineering Guide

Lamella Clarifier Design Parameters: 2026 Engineering Guide

Published: Sep 30, 2026

Lamella clarifier design parameters for 2026 — plate angle 55–60°, spacing 50–100 mm, surface loading 10–25 m/h, Reynolds and Froude limits, and sizing equations.

Lamella Clarifier Design Parameters: 2026 Engineering Guide
AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us